SUBJECT  Industrial facility design. GROUP MEMBERS H.Hammad Ali 11-IE-32 S.Hammad shah 11-IE-21 Hammad Hassan 11-IE-41.

Slides:



Advertisements
Similar presentations
BUSINESS PLUG-IN B2 Business Process.
Advertisements

4/27/2015 IENG 471 Facilities Planning 1 IENG Lecture 04 Schedule Design.
Systems Analysis and Design 9th Edition
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session # 12.
Computer Integrated Manufacturing CIM
Chapter 15 Application of Computer Simulation and Modeling.
INTRODUCTION TO BUSINESS
INDUSTRIAL & SYSTEMS ENGINEERING
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition.
Systems Development Life Cycle
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Product Design and Process Selection
Chapter 10 – Facility Layout
Improving Productivity & Quality
ES305: Virtual Tools in Engineering Design: The Eng. Design Process James Carroll, Associate Professor Electrical and Computer Engineering.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Industrial Facilities Design
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Product Development. Major Topics The product portfolio of a company concretizes its mission A description of the product selection and development process.
NETA PowerPoint Presentations to accompany The Future of Business Fourth Edition Adapted by Norm Althouse, University of Calgary Copyright © 2014 by Nelson.
Part III: Tools and Techniques for TQM Dr. Ayham Jaaron Second Semester 2010/2011.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Achieving World-Class Operations Management CHAPTER 10 The Future of Business The Essentials 4 th Edition Gitman & McDaniel Prepared by Deborah Baker Chapter.
Chapter 10 – Facility Layout
1 BTEC HNC Systems Support Castle College 2007/8 Systems Analysis Lecture 9 Introduction to Design.
© Prentice Hall, 2004Business In Action 2eChapter Producing Quality Goods and Services.
Tech 149: Unit 3 Computer-Aided Engineering and Other CIM Subsystems.
Operations Management Class 20 Tuesday 11/8/11. Operations Management (OM) The development and administration of the activities involved in transforming.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design.
Value Analysis/ Flow Analysis
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Copyright 2002 Prentice-Hall, Inc. Chapter 1 The Systems Development Environment 1.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Introduction to Business 3e 9 Part III: Management Copyright © 2004 South-Western. All rights reserved. Improving Productivity and Quality.
Chapter 10 – Facility Layout
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
Chapter 14 Information System Development
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
Part 3 Managing for Quality and Competitiveness © 2015 McGraw-Hill Education.
Producing of Goods and Services Pertemuan 12 Matakuliah: J Pengantar Bisnis Tahun: 2009.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
© Prentice Hall, 2007Excellence in Business, 3eChapter Creating Value: Producing Quality Goods and Services.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
Computer Aided Process Planning (CAPP). What is Process Planning? Process planning acts as a bridge between design and manufacturing by translating design.
* * Chapter Nine Production And Operations Management Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
© Prentice Hall, 2005Excellence in Business, Revised Edition Chapter Production of Quality Goods and Services.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
UNIT – III DESIGN OF PRODUCT, SERVICE AND WORK SYSTEMS.
Product Development. Product Selection and Development Stages Figure 5.4, pg. 138.
Chapter 12 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Achieving World-Class Operations.
© Prentice Hall, 2005Business In Action 3eChapter Producing Quality Goods and Services.
UNIT-III Group Technology and Computer Aided Process Planning
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
Systems Development Life Cycle
BUSINESS PLUG-IN B2 Business Process.
Management & Planning Tools
TECHNOLOGY PLUG-IN T12 BUSINESS PROCESS.
BUSINESS PLUG-IN B2 Business Process.
Systems Implementation,
FACILITY LAYOUT Facility layout means:
IENG 471 Facilities Planning Schedule Design
Facilities Planning and Design Course code:
Facilities Planning and Design Course code:
Summer Training Industrial Engineering Department
Facilities Planning and Design Course code:
Systems Development Life Cycle
Presentation transcript:

SUBJECT  Industrial facility design

GROUP MEMBERS H.Hammad Ali 11-IE-32 S.Hammad shah 11-IE-21 Hammad Hassan 11-IE-41

Introduction Facility Planning: The process of identifying the needs of facility users in order to create a project design that meets those needs.

Facility plan Process Facility planning process for manufacturing and assemble the products.  Define the Product  Specify the required Manufacturing  Determine the interrelationship  Determine the space requirements  Generate the alternative FP  Evaluate the FP  Implement the FP  Maintain and adapt the FP  Update the products

Alternative Facility Plan Facilities can be broadly defined as buildings where people, material, and machines.... Evaluate alternative facilities plans (alternative locations and alternative). Before the alternative facility plan answered the some questions.  What is to be produced?  How are the products to be produced?  When are the products to be produced?  How much each product to be produced?  How long the products to be produced?  Where are the products to be produced?

Global Sourcing A procurement strategy in which a business seeks to find the most cost efficient location for manufacturing a product even if the location is in a foreign country. Examples  An Automobile Industry  An toy Industry  Textile Industry

PP&S Design  Product Design  Process Design  Schedule Design

Product Design  Both the Determination  Decision and Upper level management

Dynamic Product Environment  In Which it is not possible to accurately specify the products to be produced in a given facility.

Design of the Product  The design of the product is influenced by aesthetic, material ……  Meet the needs of the costumer.

Quality Function Deployment  Organized planning approach  To identify customer needs  To translate needs of product charactaristics,product design and tolerance requirements.

Benchmarking  What the Competition is doing to satisfy the customer needs.  Exceeds customer expectations

Exploded Assembly Drawing  An exploded view drawing is a diagram, picture or technical drawing of an object, that shows the relationship or order of assembly of various parts.

Computer Aided Design  Computer-aided design (CAD) is the use of computer systems to assist in the creation, modification, analysis, or optimization of a design.

Concurrent Engineering  To improve relationship b/w the function of the component or product and its cost.  Concurrent engineering provides a simultaneous consideration in the design face of cycle factor such as product, function, material, design, manufacturing and quality.

Example #2.1 Calculating the production requirements for a serial process with three operations A product has a market estimate of Requires three processing steps (drilling, milling, turning ) having defective estimates. D1=0.04 D2=0.01 D3=0.03 Find the Inputs? Using Formula Ok=Ik-dk

Process design How product is produced? Manufacture or Buy? Equipment? Time required?

Steps in process design Identify required process Selecting the required process Sequencing the required process

Identifying required process Determine the scope of facility. Downsize large facilities. Make or buy decision should take input from: - Finance, marketing, industrial engineering, process, purchasing, HR and others.

List the items that needs to buy or manufacture on a bill of material.

While making a bill of materials, in addition to make-or-buy decision, parts list atleast include the following - Part number - Part names - Number of parts per product - Drawing references

Selecting the required process Make-or-buy decisions are based on - previous experiences - related requirements - available equipments - production rates

Bill of material for an Air flow regulator

Process Identification: It consists of description of what is to be accomplished, what is to be manufactured, part drawings describing each component, quantities to be produced. Computer aided process planning: Can be used to automate the manual process planning.

Types of CAPP: Variant Standard process plans for each part and stored within computer. It is less expensive and easy. Generative Process plans are generated automatically for new components without requiring existing plans.

Steps in process selection: Define elemental operations Identify alternative processes for each operation Analyze alternative processes Standardize process Evaluate alternative process Select process

Sequencing the required process Assembly chart: Document the method of assembling the product. The easiest method to construct is to begin with completed product and to trace disassembly back to its basic components.

Assembly chart

Operations Chart To construct, begin with the upper right side of chart with components as first assembly operations. It can be complemented with transportation, storages and delays. It gives an overview of the flow within the facility.

Precedence diagram Operation chart as a special case of more general graphical model is called precedence diagram. It establishes the precedence relationships that must be maintained in manufacturing and assembling a product.

Group technology GT refers to grouping part into families, and then making design decisions. It is based on part shapes, sizes, material type and characteristics.

Schedule design How long production will continue? When to produce? How much to produce?

Schedule design decision impacts on - machine selection - number of machines - number of employees - space requirements - storage equipment - material handling equipment etc

Marketing information It determines how long the production will continue. It is the information regarding the dynamic value of a demand of product.

Pareto analysis Pareto, observed that 85% wealth of the world is held by 15% of the people. It is depicted in volume-variety chart.

It suggests that facility plan should consist of mass production for the 15% of high volume items.

Specifications of Process requirements typically occurs in three phases, 1 st Phase : Determines quantity that must be produced 2 nd Phase : Machine requirement 3 rd phase : combines the operation requirements to overall machine requirements

Calculations of Production Requirements Let d k represents the percentage of defects produced in k th operation O k Desired output without defects I k production Input O k = I k – Defectives Defective Parts = I k × d k Ok = I k – d k I k = I k (1-d k )

Once the product, process & schedule design decisions have been made the facility planner needs to organize the information and generate and evaluate layout, handling, storage and unit load design alternatives.

1.Affinity Diagram 2.Interrelationship Digraph 3.Tree Diagram 4.Matrix Diagram 5.Contingency diagram 6.Activity Network Diagram 7.Prioritization Matrix

Gather verbal data & organize it in groups

Affinity Diagram

Form Product Families Assign Families to manufacturing Cell Keep receiving & shipping close to Production Assign Raw material to their point of use

The tree diagram is used to map the increasing detail the action that need to be accomplished in order to achieve the objective.

It organizes information such as characteristics, functions and tasks into set of items to be compared. This tool provides visibility to key contacts to specific issues and help to identify individuals who are assigned to too many teams.

Team / Participants Joe MaryJerryAnnaLindaDaisyJack Part Usage TeamPCPLP Machine use teamLCP Demand Forecast Team PCL L=Team Leader C=Team Coordinator P=Team Participant

Contingency Diagram Also Known as process decision program chart. It maps conceivable events & contingencies that might occur during Implementation. It’s useful when project consists of Unfamiliar tasks.

Contingency Diagram

Used to develop a work schedule for the facilities design. CPM (Critical Path Method) Gantt Chart PERT (Program evaluation & Review Technique)

Prioritization Matrix  In Facility Design it is important to consider: Layout characteristics Material Handling Requirements Unit load Implied Storage strategies Over all Building Impact