McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 15 Lean Operations.

Slides:



Advertisements
Similar presentations
Chapter 14 Lean Operations McGraw-Hill/Irwin
Advertisements

1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
JIT & Lean Operations Chapter 14 MIS 373: Basic Operations Management.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Chapter 14 JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
LEAN system.
Operations Management Just-in-Time Systems Supplement 12
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
JIT and Lean Operations
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
JIT and Lean Operations
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Chapter 7, Lean Thinking and Lean Systems
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
1 1. Some Thoughts on Production Management 2. What is Just-In-Time ? 3. How does EOQ Impact JIT ? 4. Motivation For EOQ 5. Impacts of Reducing Inventory.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Just-In-Time & Lean Systems
LEAN system.
Lean Operations & JIT Chapter 14.
JIT – Just-In-Time Production
JIT and Lean Operations
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
JIT and Lean Operations Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
Lean Production.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just In Time (JIT) & Lean Operations Presented by: Venessa King, Abbey Hagin, Jeffrey George, AJ Kaler, and Luis Quesada.
Operations Fall 2015 Bruce Duggan Providence University College.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 15 Lean Operations / JIT.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 JIT and Lean Operations.
JIT and Lean Operations Just-In-Time (JIT) Defined 1. JIT can be defined as an integrated set of activities designed to achieve high-volume production.
JIT and Lean Operations + Maintenance Chapter 15 and Chapter 15S
Pull Manufacturing and Just In Time
Chap 10 Learning Objectives
Just-In-Time and Lean Production
Production and Operations Management
Chapter 14 Lean Operations
Topics To Be Covered 1. Some Thoughts on Production Management
Presentation transcript:

McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 15 Lean Operations

15-2 Lean Operations Lean operation –A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve –Greater productivity –Lower costs –Shorter cycle times –Higher quality

15-3 Lean Operations: The Beginning Lean operations began as lean manufacturing, also known as JIT in the mid-1900s Developed by Taiichi Ohno and Shigeo Ohno of Toyota –Focus was on eliminating all waste from every aspect of the process Waste is viewed as anything that interfered with, or did not add value to, the process of producing automobiles

15-4 Lean Systems: Basic Elements Lean systems have three basic elements: –A system that is 1.Demand driven 2.Focused on waste reduction 3.Has a culture dedicated to excellence and continuous improvement

15-5 Lean: Ultimate Goal The ultimate goal: –A balanced system One that achieves a smooth, rapid flow of materials through the system to match supply to customer demand

15-6 Goals and building blocks of lean systems

15-7 Lean: Supporting Goals The degree to which lean’s ultimate goal is achieved depends upon how well its supporting goals are achieved: 1.Eliminate disruptions 2.Make the system flexible 3.Eliminate waste, especially excess inventory

15-8 Waste –Represents unproductive resources –Seven sources of waste in lean systems: 1.Inventory 2.Overproduction 3.Waiting time 4.Unnecessary transporting 5.Processing waste 6.Inefficient work methods 7.Product defects

15-9 Kaizen The kaizen philosophy for attacking waste is based upon these ideas: 1.Waste is the enemy and to eliminate waste it is necessary to get the hands dirty 2.Improvement should be done gradually and continuously; the goal is not big improvements done intermittently 3.Everyone should be involved 4.Kaizen is built on a cheap strategy, and it does not require spending great sums on technology or consultants 5.It can be applied everywhere 6.It is supported by a visual system 7.It focuses attention where value is created 8.It is process oriented 9.It stresses that the main effort for improvement should come from new thinking and a new work style 10.The essence of organizational learning is to learn while doing

15-10 Lean: Building Blocks Product design Process design Personnel/organizational elements Manufacturing planning and control

15-11 Building Blocks: Product Design Four elements of product design important for lean systems: 1.Standard parts 2.Modular design 3.Highly capable systems with quality built in 4.Concurrent engineering

15-12 Building Blocks: Process Design Seven aspects of process design that are important for lean systems: 1.Small lot sizes 2.Setup time reduction 3.Manufacturing cells 4.Quality improvement 5.Production flexibility 6.A balanced system 7.Little inventory storage 8.Fail-safe methods

15-13 Process Design: Small Lot Sizes In the lean philosophy, the ideal lot size is one Benefits of small lot size –Reduced in-process inventory Lower carrying costs Less storage space is necessary –Inspection and rework costs are less when problems with quality do occur –Less inventory to ‘work off’ before implementing product improvements –Increased visibility of problems –Permits greater flexibility in scheduling –Increased ease of balancing operations

15-14 Process Design: Setup Time Reduction Small lot sizes and changing product mixes require frequent setups Unless these are quick and relatively inexpensive, they can be prohibitive Setup time reduction requires deliberate improvement efforts –Single-minute exchange of die (SMED) A system for reducing changeover time –Group technology may be used to reduce setup time by capitalizing on similarities in recurring operations

15-15 Process Design: Manufacturing Cells One characteristic of lean production systems is multiple manufacturing cells Benefits include –Reduced changeover times –High equipment utilization –Ease of cros-training workers

15-16 Process Design: Quality Improvement Quality defects during the process can disrupt operations Autonomation (jidoka) –Automatic detection of defects during production Two mechanisms are employed –One for detecting defects when they occur –Another for stopping production to correct the cause of the defects

15-17 Process Design: Work Flexibility Guidelines for increasing flexibility –Reduce downtime due to changeovers by reducing changeover time –Use preventive maintenance on key equipment to reduce breakdowns and downtime –Cross-train workers so they can help when bottlenecks occur or other workers are absent –Use many small units of capacity; many small cells make it easier to shift capacity temporarily and to add or subtract capacity –Use off-line buffers. Store infrequently used safety stock away from the production area –Reserve capacity for important customers

15-18 Process Design: Balanced System Takt time –The cycle time needed to match customer demand for final product –Sometimes referred to as the heartbeat of a lean sytem Takt time is often set for a work shift Procedure: 1.Determine the net time available per shift 2.If there is more than one shift per day, multiply the net time by the number of shifts 3.Compute the takt time by dividing the net available time by demand

15-19 Process Design: Inventory Storage Lean systems are designed to minimize inventory storage –Inventories are buffers that tend to cover up recurring problems that are never resolved partly because they are not obvious partly because the presence of inventory makes them seem less serious

15-20 Process Design: Fail-Safe Methods Poka-yoke (Fail safing) –Building safeguards into a process to reduce or eliminate the potential for errors during a process Examples –Electric breakers –Seatbelt fastener warnings –ATMs that signal if a card is let in a machine –Designing parts that can only be assembled in one position

15-21 Building Blocks: Personnel/Organizational Five personnel/organizational elements that are important for lean systems: –Workers as assets –Cross-trained workers –Continuous improvement –Cost accounting –Leadership/project management

15-22 Personnel/Organizational: Workers as Assets Workers as assets –Well-trained and motivated workers are the heart of the lean system They are given greater authority to make decisions, but more is expected of them

15-23 Personnel/Organizational: Cross-Trained Workers Cross-trained workers –Workers are trained to perform several parts of a process and operate a variety of machines Facilitates flexibility Helps in line balancing

15-24 Personnel/Organizational: Continuous Improvement Continuous improvement –Workers in lean systems have greater responsibility for quality, and they are expected to be involved in problem solving and continuous improvement –Lean workers receive training in Statistical process control Quality improvement Problem solving

15-25 Personnel/Organizational: Cost Accounting Cost accounting –Activity-based costing Allocation of overhead to specific jobs based on their percentage of activities

15-26 Personnel/Organizational: Leadership Leadership/project management –Managers are expected to be leaders and facilitators, not order givers –Lean systems encourage two-way communication between workers and managers

15-27 Building Blocks: MPC Seven elements of manufacturing planning and control (MPC) are particularly important for lean system: 1.Level loading 2.Pull systems 3.Visual systems 4.Limited work-in-process (WIP) 5.Close vendor relationships 6.Reduced transaction processing 7.Preventive maintenance and housekeeping

15-28 MPC: Level Loading Lean systems place a strong emphasis on achieving stable, level daily mix schedules –MPS – developed to provide level capacity loading –Mixed model scheduling Three issues need to be resolved –What is the appropriate product sequence to use? –How many times should the sequence be repeated daily? –How many units of each model should be produced in each cycle?

15-29 MPC: Communication Communication moves backward through the system from station to station –Each workstation (customer) communicates its need for more work to the preceding workstation (supplier) Assures that supply equals demand –Work moves “just in time” for the next operation Flow of work is coordinated Accumulation of excessive inventories is avoided

15-30 MPC: Pull Systems Push system –Work is pushed to the next station as it is completed Pull system –A workstation pulls output from the preceding workstation as it is needed –Output of the final operation is pulled by customer demand or the master schedule –Pull systems are not appropriate for all operations Large variations in volume, product mix, or product design will undermine the system

15-31 MPC: Visual Systems Kanban –Card or other device that communicates demand for work or materials from the preceding station Kanban is the Japanese word meaning “signal” or “visible record” –Paperless production control system –Authority to pull, or produce, comes from a downstream process.

15-32 Kanbans Ideal number of kanban cards

15-33 MPC: Limited WIP Benefits of lower WIP –Lower carrying costs –Increased flexibility –Aids scheduling –Saves costs of scrap and rework if there are design changes –Lower cycle-time variability

15-34 MPC: Close Vendor Relationships Lean systems typically have close relationships with vendors –They are expected to provide frequent, small deliveries of high-quality goods A key feature of many lean systems is the relatively small number of suppliers used

15-35 MPC: Reduced Transaction Processing Lean systems seek to reduce costs associated with the ‘hidden factory’: –Logistical transactions –Balancing transactions –Quality transactions –Change transactions

15-36 Value Stream Mapping Value stream mapping –A visual tool to systematically examine the flows of materials and information Its purpose is to help identify waste and opportunities for improvement Data collected: –Times –Distances traveled –Mistakes –Inefficient work methods –Waiting times –Information flows

15-37 Transitioning to Lean Systems Make sure top management is committed and that they know what will be required Decide which parts will need the most effort to convert Obtain support and cooperation of workers Begin by trying to reduce setup times while maintaining the current system Gradually convert operations, begin at the end and work backwards Convert suppliers to JIT Prepare for obstacles

15-38 Obstacles to Conversion Management may not be fully committed or willing to devote the necessary resources to conversion Workers/management may not be cooperative It can be difficult to change the organizational culture to one consistent with the lean philosophy Suppliers may resist

15-39 Lean Services In service the focus is often on the time needed to perform the service because speed is often the order winner Lean benefits can be achieved in the following ways: –Eliminate disruptions –Make system flexible –Reduce setup and lead times –Eliminate waste –Minimize WIP –Simplify the process

15-40 JIT II JIT II: A supplier representative works right in the company’s plant, making sure there is an appropriate supply on hand It is often referred to as vendor managed inventory (VMI)