Robert Crooks ADFD/WB Project Preparation and Appraisal Workshop Abu Dhabi, April 2010 Environmental Assessment Category A and B Projects Compared.

Slides:



Advertisements
Similar presentations
Methods to Estimate Costs of Environmental Prevention, Protection and Remediation Erkki Ikäheimo.
Advertisements

Copyright 2010, The World Bank Group. All Rights Reserved. Importance and Uses of Agricultural Statistics Section B 1.
USAID Africa Bureau EIA Procedures for Sub-Projects
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
ENVIRONMENTAL MANAGEMENT PLAN
Robert Crooks ADFD/WB Project Preparation and Appraisal Workshop Abu Dhabi, April 2010 Environmental and Social Assessments.
CIVIL ENGINEERING.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
EIA Process, IEE, TOR Dr. Wesam Al Madhoun
Water Services Trust Fund GWC Pre-Concluding workshop Maria Notley.
OP/BP 4.01 Environmental Assessment Zagreb, May Presenter: Natasa Vetma Presentation prepared by Ruxandra Floroiu.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
In the Name of God, Most Gracious, Most Merciful.
Rogue Basin Water Quality Implementation Plans Greg Stabach, Natural Resources Project Manager Rogue Valley Council of Governments.
Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
Minsk, October 8 th, 2014 Martin Smutný Integra Consulting Ltd.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
A Status Report on Wind Energy Opportunities in Canada Robert Hornung, CanWEA EWEA Conference March 2, Athens.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
ENVIRONMENTAL SCREENING AND CATEGORIZATION WB Safeguards workshop April-May 2012 Agi Kiss.
TOPIC 3.2 ENSURING ADEQUATED WATER RESOURCES AND STORAGE INFRASTRUCTURE TO MEET AGRICULTURAL, ENERGY AND URBAN NEEDS.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Crisis in Shrewsbury Flooding impacts and risk management.
EIA in Pakistan Brief background and History of the National EIA system. It started with the promulgation of Pakistan Environmental Protection Ordinance.
Achieving the MDGs: RBA Training Workshop Module 5: Rural Development Investment Cluster 9-12 May 2005.
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
General presentation NL Agency ORIO Infrastructure for Development.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
RD Lasco ICRAF1 TRADEOFF ANALYSIS OF ADAPTATION STRATEGIES IN THE PHILIPPINES RD Lasco 1 R.V.O. Cruz 2, J.M. Pulhin 2, F.B. Pulhin 2 1 World Agroforestry.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Biggest hydroelectric power plants in world
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
Water management Pioneers in international business.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
Overview of Reg Overview of Reg Visit What is Reg. 216?  Sets out USAID’s pre-obligation EIA process for new activities.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
ICAP SAFA Conference 2016 South Asia: Corridor of Opportunities Lahore, January 30, 2016 Mirza Hamid Hasan.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Hydroelectric Potential in Developing Countries By: Sean Morrison University of Wisconsin Eau Claire Department of Geography and Anthropology.
INTRODUCTION 2.EUROPEAN UNION HARMONIZATION PROCESS 3.LEGISLATION STUDIES 4.ADMINISTRATIVE STRUCTURE 5.IMPLEMENTATION PROCESS.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Erdeneburen HPP Project Implementation Unit
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
TRANSBOUNDARY WATERCOURSES IN THE UNECE REGION Guidelines to complete the information data sheet for transboundary rivers Finnish Environment Institute.
ISO Session 3 Environmental Management and Ethics in Management.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Environmental Safeguards
Infrastructure planning and management
Local Government Climate Change Support Program 2016
Concepts in Water Resources Management
Environmental Impact Assessment (EIA) in New Brunswick
Integrated Bilateral Agreement (IBA) 2018 to 2028
Relationship between World Bank and Romanian EA requirements
IMPLEMENTATION OF ARTICLE 9
The purpose of screening
Presentation transcript:

Robert Crooks ADFD/WB Project Preparation and Appraisal Workshop Abu Dhabi, April 2010 Environmental Assessment Category A and B Projects Compared

Environmental Assessment Look at examples of Category A & B projects Compare the scope of EA and the level of effort Use the Category A project to illustrate how the EA process can be used to have a positive development impact - 2 -

Yemen Public Works III Key Features from environmental point of view Project Cost: $52 million (relatively small to begin with) – but expanded to $405 million with co-financing Location: Project spread over a wide area: in all 20 Governates of the country Main Components: The project will invest in basic infrastructure services in sectors such as health, education, water supply, waste water, roads, water harvesting/irrigation and vocational training. Scale of individual investments is very small: an estimated 800 sub-projects with an average investment cost of $90,000 and a range of $20,000 to $200,

Yemen Public Works III Is this a Category A Project? Large scale aquaculture and mariculture (aquaculture in the sea) Dams and reservoirs Forestry production projects Hazardous waste management and disposal Industrial plants (large-scale) and industrial estates Irrigation, drainage, and flood control (large-scale) Land clearance and leveling Manufacture, transportation, and use of pesticides or other hazardous and/or toxic materials Mineral development (including oil and gas) New construction or major upgrading of highways or rural roads Port and harbor development Reclamation and new land development Resettlement River basin development, thermal power and hydropower development or expansion Water supply and wastewater collection, treatment and disposal projects (large-scale) No in all cases - 4 -

Yemen Public Works III Is this a Category B Project?: Yes but at the lower end Agro-industries (small-scale) Electrical transmission Energy efficiency and energy conservation Irrigation and drainage (small-scale) Protected areas and biodiversity conservation Rehabilitation or maintenance of highways or rural roads Rehabilitation or modification of existing industrial facilities (small-scale) Renewable energy (other than hydroelectric dams) Rural electrification Rural water supply and sanitation Tourism Watershed projects (management or rehabilitation) - 5 -

Environmental Assessment Screening CriterionProject Characteristics Potential impacts are less adverse than those of Category A projects One measure of this is the monetary value of individual investments. It is hard to register significant adverse environmental impacts for $90,000!! Impacts are site-specific Most activities are very small scale civil works using hand labor (projects with high labor requirements favored in the selection process) and can be completed very quickly (6-12 months). Impacts will be very localized, generally due to the small scale plus the fact that most sub-projects will be in rural areas (lower population density, lower potential for adverse “amenity” impacts); impacts will be short term. Few if any impacts are irreversible Most impacts will be short term (construction phase only) although some sub-projects (e.g. irrigation works) may have longer lasting impacts which could be described as irreversible or at least, difficult to reverse. Mitigatory measures can be designed more readily than for Category A projects Lower impact potential generally means easier measures. 6

Yemen Public Works III: EA Approach Evaluate range of projects being proposed (there was already a long list of 4,000 project proposals on the table at the time of project preparation) Identify range of potential environmental impacts Broadly classify sub-projects in terms of environmental impact potential Develop environmental pre-screening procedures to environmentally screen new investment proposals coming into the pipelines Develop environmental management procedures to be implemented on selected types of investments to mitigate adverse environmental impacts (typical mitigation measures include the provision of adequate hazardous materials disposal facilities, adequate crosswalks for children, and the early identification of any potential vector breeding sites—all very simple and of a type that could easily be incorporated into Standard Operating Procedures in standard contract documents). Develop environmental monitoring procedures Define the administrative mechanism to be followed in implementing the management scheme - 7 -

Yemen Public Works III: Key Elements of Approach The approach was simple and easy to implement The level of effort was consistent with the significance of environmental issues to be encountered (very small scale, localized and short term) - 8 -

A BIG Category A Project China: Yangtze Basin Water Resources Development Project (1995)

China: Yangtze Basin WRDP Key Project Features Project Cost: $652 million (WB loan/Credit was $174 million) Six main sub-projects: Part A – HUBEI Province rehabilitation of 270,000 ha of irrigation/drainage works in two schemes – $81.3 million; improvement of drainage covering about 60,000 ha—$43 million; miscellaneous aquaculture, forestry, grassland/livestock and soil improvement activities—$50.0 million. Part B – HUNAN Province construction of 50,000 ha new irrigation—$80.3 million construction of new multipurpose Dam including resettlement of 16,500 people—$385 million Part C - Yangtze Flood Forecasting and Warning System Flood forecasting and warning system for the Central Yangtze River region—US$12.7 million

Is Yangtze Basin WRDP a Category A Project? Large scale aquaculture Dams and reservoirs Forestry production projects Hazardous waste management and disposal Industrial plants (large-scale) and industrial estates Irrigation, drainage, and flood control (large-scale) Land clearance and leveling Manufacture, transportation, and use of pesticides or other hazardous and/or toxic materials Mineral development (including oil and gas) New construction or major upgrading of highways or rural roads Port and harbor development Reclamation and new land development Resettlement River basin development, thermal power and hydropower development or expansion Water supply and wastewater collection, treatment and disposal projects (large-scale)

Consultant Local consultant (Yangtze River Institute of Soils & Water Conservation) in close collaboration with WB staff Scope of EA  Full EIA of the entire project but with special attention being paid to the new dam construction in Part B.  Public consultation was done as part of the EIA preparation (98% of respondents said they thought the project was a good idea!!).  No social assessment done (this was a 1994 project) although separate Resettlement Action Plan (RAP) covering 16,000 people was prepared. Approach to EMMP  Separate EMMPs were prepared for each sub-project.  Each sub-project also had its own project management units (PMU) and each of these included specific staff to manage and supervise implementation of the EMMP.  For the dam project, the environmental management unit also supervised the implementation of the Resettlement Action Plan (RAP) under which more than 16,000 people were resettled.  The environmental management unit for the dam employed up to a maximum of five engineers/scientists during the peak work period.  The environmental management unit was subsequently made a permanent part of the corporation established to manage both the dam and the catchment area. Yangtze Basin WRDP: Approach To Environmental Assessment 13

DescriptionQuantity Dam TypeRCC Gravity Dam Height (tallest in the world)131 m Crest length370 m Total Storage Capacity1,855,000 m 3 Hydrology Catchment Area above Dam site371,100 ha. Annual Inflow4,160,000 m 3 Design Flood Discharge (P=0.02%)15,700 m 3 /s Reservoir Total Storage Capacity1,855,000 m 3 Length of reservoir140 km Underground Powerhouse Total Installed Capacity 3×100 MW Design Head80 m Irrigation Irrigated Area5,700 Drinking Water Supply Capacity50,000 persons Miscellaneous Excavation quantity1,138,000 m 3 Quantity of RCC1,100,000 m 3 Resettlement16,159 persons Total Costs$385 million The Jiangya Dam Sub-Project: Key Features of the Development 14

Layout of Jiangya DAM 15

Dam Under Construction

Power Station Intake Construction

Key Features of Jiangya EMMP New standard of EIA for projects in China Project set new standards of housing for construction workers Exceptional measures taken to reduce impacts on nearby township (road diversion, water pollution control) Promotion of total catchment management approach leads to establishment of Lishui Hydropower Corporation to operate the dam and manage the catchment

Main Determinants of Success for Jingya EMMP Competent, locally-based environmental consultant was credible with counterpart (Hunan Provincial Water Resources Bureau) Counterpart was interested in new concepts of dam design and management and was open to ideas being pushed by WB team Federal government (MWR) was also pushing water sector innovation which further encouraged counterpart Effective administrative approach to environmental management Adequate staffing (numbers & expertise) and budget for environmental management unit Exceptional efforts made to communicate with local stakeholders to minimize conflicts