Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.

Slides:



Advertisements
Similar presentations
Solar-B EIS Preliminary Design Review 6-7 July 2000 CCD Camera Design Chris McFee Mullard Space Science Laboratory.
Advertisements

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
A vertical-flexure CCD module Bruce C. Bigelow University of Michigan Department of Physics 10/7/04.
Parameters to choose the CCD The CCD test bench *Temperature range : -55 to +40°C. *Stabilization : < 0.05°C/hour. *5 temperature probes : CCD and electronics.
Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
Solar Orbiter EUV Spectrometer
VLBI: Visible Light Broadband Imager Instrument Conceptual Design Presentation Tom Berger Lockheed Martin Solar and Astrophysics Lab.
LXO/MagEX Meeting Greenbelt, 24/10/07 Telescope Baseline Configuration: Imaging Capability (Micropore Optic) Telescope Field of View ~ 30° x 30° Angular.
Detector Assembly Design Pedestal Cold Strap Interface Cable SCA Motherboard Attachment Feet 51 Pin Electrical Connector Cover/Baffle Package designed.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
The Research School of Astronomy and Astrophysics of the Australian National University at Mt Stromlo Observatory is developing a wide-field Cassegrain.
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
CHE/ME 109 Heat Transfer in Electronics
SDW2005, juin, Taormina The Corot Space instrument.
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
WFIRST Instrument reference information July 1, 2015.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Copyright : Marconi Applied Technologies Limited. All Rights Reserved. CCDs for Adaptive Optics CfAO Workshop: Nov 1999 By P.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
[1] Reference: QCam API reference manual document version Charge Coupled Device (CCD)
ISUAL Sprite Imager Electronic Design Stewart Harris.
Advanced Concepts & Science Payloads Office Eddicam/EST MeetingPage 1 CCD Procurement Schedule driven Review off-the shelf availability Specific mode of.
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
1 C osmic dust R eflectron for I sotopic A nalysis CRIA LAMA (A cria is a baby llama)
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
Mon. 20 October 2003 SO/EUS Proto-consortium Meeting Mechanical Design Dr Douglas Griffin 1 Solar Orbiter Extreme Ultaviolet Spectrometer Conceptual Mechanical.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
ROCSAT-2 Critical Design Review ISUAL Thermal Interface Design / Analysis Report Jeng-Der (J.D.) Huang ( 黃正德 ) Tsung-Yao (Andy) Chen ( 陳宗耀 ) Jih-Run (J.R.)
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
Spectrograph focal plane 2003 Goals : CCD l Improved CCD Cryostat connections, decoupling, preamp box photodiodes for efficiency monitoring thermistances.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Plato Consortium Kickoff Meeting, Paris 1 09-Nov-2010 Plato CCD and Front-End Electronics Dave Walton UCL/MSSL
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
Incorporating Hubble Servicing with NASA’s Long-Term Vision
Rose Navarro HMI Lead Thermal Engineer
4x8 Mosaic Camera Development
Hawkeye Mechanical Design Snapshot
LSST Camera Detector Status
Optics Alan Title, HMI-LMSAL Lead,
Instrument Overview Larry Springer HMI Program Manager
AGENDA 1 - THE INSTRUMENT Architecture of the instrument
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 2 Eddicam

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 3 Eddicam CCD baseline characteristics –Format: 740 x 2900 pixels –Pixel size: 27 x 27 µm 2 –Chip size: 20 x 80 mm 2 –Full well capacity: 1.6 Me - –Minimum line readout time: 13 µs –Frame transfer time: 20 ms –Readout noise: e - at 0.5 MHz –Operational temperature:-80 / -100 C

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 4 Eddicam Planet finding CCD layout Asteroseismology layout Filters Frame transfer covers

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 5 Eddicam CCD array preliminary design – CCDs covering the full FOV –CCDs working in frame transfer mode for asteroseismology (short integrations on bright stars) –CCDs working in full frame mode for planet finding (long integrations on weaker stars)

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 6 Eddicam CCD mosaic proposed by Marconi: –20 CCDs on individual INVAR packages –Each CCD individually mounted on a large INVAR baseplate –All CCDs within ±10 µm from the baseplate: no individual focussing required –Flatness variation < 3 µm from +20 to -100 C –Butting gap around 500 µm

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 7 Eddicam Prototype of CCD array proposed by Marconi

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 8 Eddicam Detail of individual CCD chip package

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 9 Eddicam EddiCam Camera Unit Preliminary Layout –CCD Support Assembly –CCD Mask Assembly –Calibration Assembly –FEE Box –Support Structure

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 10 Eddicam Eddicam Preliminary Layout

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 11 Eddicam CCD Support Assy Calibration Assy FEE Box Support Structure Assy CCD Mask Assy Eddicam Explode View

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 12 Eddicam CCD Support Assembly Primary Missions: Provide an accurate and stable support to the CCD Mosaic Provide an effective thermal path between CCD´s and the heat sink I/F Provide a cold trap for decontamination purpose Bottom Face ViewTop Face View

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 13 Eddicam Cold Trap CCD MosaicInvar Plate Cold Ring Flexible Thermal Links CCD Support Assy Explode view

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 14 Eddicam CCD Support Assembly Hot Points: Required flatness of the mosaic plane Required alignment between CCD´s Maximum butting gap (design based on three side buttable CCD) Thermal stability control (  0.1K/h): -Completely passive (by mean of thermal equilibrium and thermal inertia) -Thermally controlled by mean of sensors/heaters Flexible thermal links: Copper/Aluminium straps Carbon Fibre straps(?) Micro heat pipes Thermal Switches for the baking mode(?): CCD Mosaic cooling path disconnection could be required

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 15 Eddicam CCD Mask Assy Missions: Change between planet finding and asteroseismology operational modes CCD Mask Assy Hot Points: Single or Multiple actuation: driver for actuator concept Mask-CCD´s gap: potential straylight source baking mode If lubrication required: cleanliness control problem

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 16 Eddicam CCD Mask Assy Mechanical Concepts: Slidding Concept Cam/Rotating Concept

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 17 Eddicam Calibration Assy Missions: Provide dust protection during the AIV and Launch Phases Provide a flat field light on the CCD plane for calibration Calibration Assy Hot Points: Single or Multiple actuation: Driver for actuator concept If lubrication required: Cleanliness control Straylight If spectral information required: Devices included in this assy High Impact on preliminary configuration concept

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 18 Eddicam FEE Box: Provide mechanical support to each preamps boards Provide a dedicate thermal control system for heat dissipation Provide protection against radiation FEE Box Hot Points: Mass and Envelope Accessibility and integration with CCD´s Thermal conductivity between electrical connections Thermal isolation from CCD´s Support and cooling design

Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 19 Eddicam Support Structure Assy Missions: Provide a stiff and stable connection to the telescope Provide support to the different elements of the camera unit Provide support to the electrical and thermal devices from the telescope Provide allocation to the refocusing system(?) Support Structure Assy Hot Points: High stable structure Heat pipes and harness path from telescope to the unit Focusing system: high impact on preliminary design