Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute.

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

The Competitive Market in Public / Private Education.
Bosnia and Herzegovina
GAMBIA COMPETITION COMMISSION GAMBIA COMPETITION COMMISSION Levelling the Field for Development BY : EXECUTIVE SECRETARY 5 TH JUNE 2013.
REGULATORY FRAMEWORK FOR ENERGY INFRASTRUCTURE INVESTMENT – GHANAS EXPERIENCE (PURC). ABUJA – NIGERIA MAY 1, 2008 By Commissioner Andrew Quayson Chairman,
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
Dr. Bader Eddin Al-Majali
1 Reform of Electricity Industry & Construction of Electricity Market In China Northeast East South Centre Northwest North Sitsang Taiwan Zhang Diansheng.
Israel’s Capital Market Reforms – Achievements and Challenges Ahead Professor Zvi Eckstein Deputy Governor of the Bank of Israel Feb. 27, 2008.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Non-Tariff Barriers in the Trade of Transport Services – Final Report TPT 02/2002T Steering Committee on More Competitive Transportation (including infrastructure)
Key Policies Improving Business and Investment Climate Presenter: Governor CBBH: Kemal Kozarić, MA.
Page 0 Early Stage of Infrastructure REITs: Turkey Experience at Legislative Level EARLY STAGE OF INFRASTRUCTURE REITs: TURKEY EXPERIENCE AT LEGISLATIVE.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
BY S. U. YAMUSA II AND A. H. ANSARI
Powering Africa – SAPP Strategies
Adegbulugbe A.O. - Energy Week March 2006 Gas Development in Nigeria: Prospects and Direction Professor Anthony O. Adegbulugbe Special Adviser to the President.
Bridging Nigeria’s Infrastructure Gap By M. K. Ahmad Director General National Pension Commission – Nigeria 1 18 November, 2008.
World Forum on Energy Regulation IV Athens, Greece October , 2009 Regulatory challenge of Russian energy sector reform Dominique Fache, General.
Power Africa Governance Donor Partner WG November 14, 2013.
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
Financing Urban Public Infrastructure
Emerging Market Global Players: Institutions, Governance and Strategy: The Case of Qatar Emerging Market Global Players: Institutions, Governance and Strategy:
Organizational Structure of RAO UES Executive Administration During Reform Period 22 March 2004.
Electricity Reforms in Bangladesh
Strategies for the security of electricity supply.
Molly Melhuish consumer advocate 1 supported by Auckland Greypower June 2012.
Republic of India is a Neighbour of China Most Populous Countries. It is No.2. China is No. 1. It has unique history of Political stability and a Socialistic.
Influence of foreign direct investment on macroeconomic stability Presenter: Governor CBBH: Kemal Kozarić.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Public Sector Enterprises in Nepal Mr. Ram Kumar Sharma Member, National Planning Commission of Nepal.
Preliminary country paper On Competition Scenario in Vietnam Prepared by the Central Institute of Economic Management (CIEM) for the 7-UP MARK II Project.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
Capacity Building on Competition Policy in Select Countries of Eastern and Southern Africa `Promoting a Healthy Competition Culture in Sub-Sahara Africa`
Infrastructure Service Delivery: An Overview. India’s infrastructure deficits Two types of deficits:  “Investment gap”: Gap between existing and required.
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
1 WHOLESALE ELECTRICITY MARKET AN OVERVIEW By:Ag. Manager, Market Operations.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
UNCTAD/AU TRAINING WORKSHOP ON TRADE IN SERVICES FOR AFRICAN NEGOTIATORS: 24 – 28 August 2015, Hilton Hotel, Nairobi KENYA’S EXPERIENCE IN THE PREPARATION.
Philip Lloyd, CPUT Rob Jeffrey, Econometrix.  Eskom must grow if our economy is to grow  Many decisions about Eskom’s operations in recent years have.
Critical Issues Electricity Distribution Industry Restructuring Electricity Distribution Interests of Distributors Power Shortages and the Economy Importance.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
Statistical Co-Ordination in South Africa Statistics South Africa.
PRESENTATION FOR INVESTORS Unified Energy System of Russia.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Singapore had achieved economic success with an economy that was heavily managed by the government. The state owned, controlled, or regulated the allocation.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
Federal Energy Regulatory Commission Participation In Interstate Legal Processes Federal vs. State Authority August 10, 2005 Brazilia, Brazil.
Mining sector in Africa A dynamic sector in evolution for development.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Globalisation & Liberalisation. Introduction: Evolution of business refers to origin and growth of business activities over a period of time. Business.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Engaging National and Regional Finance Wolfgang Mostert SE4All workshop, Danida/UNEP-Risoe Copenhagen,
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
Energy and Power Supply Papua New Guinea 1. PNG Power Limited PNG Power Ltd  is a State owned Corporation with the Government’s ownership interest held.
CPCS Transcom Limited Solutions for growing economies The Privatization Transaction Process and the Opportunities for Investments in the Nigerian Power.
Lecture outline Soft budget constraint at times of command economy Public Debt of the Former Soviet Union Economic policy in Uzbekistan after 1991 Public.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Chairman of the Board and CEO,
Power Sector Reform in Asia
Power Sector Reform in Asia
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
Presentation transcript:

Competition and Regulation Interface in Developing Countries: Realities from the Power Sector By Ama Asantewah Ahene* and Emmanuel A. Codjoe** *Institute of Statistical, Social and Economic Research (ISSER), Univ. of Ghana, Legon. **Department of Economics, university of Ghana, Legon.

Introduction Growth of Power Generation in Developing Countries Growth of Power Generation in Developing Countries Government’s Quest to Increase Citizen’s Access to Electricity (Power) Government’s Quest to Increase Citizen’s Access to Electricity (Power) Instituting Reforms to Attract Private Participation in the Power Sector Instituting Reforms to Attract Private Participation in the Power Sector

Introduction (cont.) Controversy of Private Participation in the Power Sector Controversy of Private Participation in the Power Sector World Bank’s Push for Reforms in the Power Sector World Bank’s Push for Reforms in the Power Sector Review of Institutions and Reforms of the Power Sector in some African Countries Review of Institutions and Reforms of the Power Sector in some African Countries

Power Sector Reforms Implies Commercialisation, Privatisation, Restruction and Competition. Implies Commercialisation, Privatisation, Restruction and Competition. Implies an Alternative Source of Funding for Governments. Implies an Alternative Source of Funding for Governments. However, as at mid-1998 only 39% of Key Reform Steps had been carried out in Developing Countries (World Bank Survey). However, as at mid-1998 only 39% of Key Reform Steps had been carried out in Developing Countries (World Bank Survey).

Reform Processes Unbundling – Assigning Existing Costs to Various Components and Developing Prices Based on the Costs Unbundling – Assigning Existing Costs to Various Components and Developing Prices Based on the Costs Commercialisation – Government Relinquishes Control to Autonomy and Profitability Commercialisation – Government Relinquishes Control to Autonomy and Profitability Corportisation – Formal and Legal Move from Direct Legal Control to a Legal Corporation with Separate Management Corportisation – Formal and Legal Move from Direct Legal Control to a Legal Corporation with Separate Management

Reform Processes Competition – Introduction of Wholesale Competition and/or Retail Competition Competition – Introduction of Wholesale Competition and/or Retail Competition Privatisation – Transfer of Assets to Private Ownership (This could be part or whole of assets) Privatisation – Transfer of Assets to Private Ownership (This could be part or whole of assets)

Experiences of some Countries in Africa Some African Countries Bid to Attract Investment in Indebted State-run Utilities Some African Countries Bid to Attract Investment in Indebted State-run Utilities In Nigeria, NEPA is Separated into 18 Companies; Scheduled to be Privatized In Nigeria, NEPA is Separated into 18 Companies; Scheduled to be Privatized

Experiences (Cont.) Government Estimated $1.4Billion investment in each Company for Reliability. Government Estimated $1.4Billion investment in each Company for Reliability. NEPA is Burdened with a debt of $3Billion, Making Privatisation Essential Source of Funding. NEPA is Burdened with a debt of $3Billion, Making Privatisation Essential Source of Funding. Privatisation Scheduled to be Completed by Privatisation Scheduled to be Completed by 2005.

Experiences (Cont.) S.A Power Sector Constituting 43% of the Entire Continents is the Largest S.A Power Sector Constituting 43% of the Entire Continents is the Largest The Sector is State-Owned (Eskom) and Generates most of the Country’s Electric Power The Sector is State-Owned (Eskom) and Generates most of the Country’s Electric Power Eskom runs a Coal-Fired Power Plant, Nuclear Power Reactor and Hydroelectric power Eskom runs a Coal-Fired Power Plant, Nuclear Power Reactor and Hydroelectric power

Experiences (Cont.) S.A Government is in the Final Stages of Passing Legislation on Power Sector Reform S.A Government is in the Final Stages of Passing Legislation on Power Sector Reform 30% of Eskom is scheduled to be offered to Investors by % of Eskom is scheduled to be offered to Investors by 2006 Government Plans to also Divest its Distribution Assets Government Plans to also Divest its Distribution Assets

Experiences (Cont.) Egypt is the Second Largest After S.A Egypt is the Second Largest After S.A Government began Privatisation Processes in 1998 Government began Privatisation Processes in 1998 Investors to Purchase up to 49% of Egyptian Electricity Holding Company Investors to Purchase up to 49% of Egyptian Electricity Holding Company Also Encouraging Private Companies to Construct Electricity Generating Plants Also Encouraging Private Companies to Construct Electricity Generating Plants

Experiences (Cont.) Zimbabwe has Begun the Process of its two Major Electric Power Generating Plants, Hwange and Kariba Zimbabwe has Begun the Process of its two Major Electric Power Generating Plants, Hwange and Kariba Two S.A Firms were Chosen as Finalists to Oversee the Sale of the Two Facilities Two S.A Firms were Chosen as Finalists to Oversee the Sale of the Two Facilities

Experiences (Cont.) In Uganda, the Government has Estimated an Investment of at Least $450Million to Reach its Goal of Increasing Electricity Access. In Uganda, the Government has Estimated an Investment of at Least $450Million to Reach its Goal of Increasing Electricity Access. The Country has began Privatisation in an Effort to Attract Foreign Investment in its Electric Power Sector. The Country has began Privatisation in an Effort to Attract Foreign Investment in its Electric Power Sector.

Ghana’s Experience The Power Sector was Institutionalised in the Early 1960s as the Electricity Department The Power Sector was Institutionalised in the Early 1960s as the Electricity Department VRA was Established to Supply Power in Ghana VRA was Established to Supply Power in Ghana The Akosombo Hydro-Electric and the Kpong Hydro-Electric Dams were Constructed The Akosombo Hydro-Electric and the Kpong Hydro-Electric Dams were Constructed

Continuation… Electricity Corporation of Ghana in 1967 Electricity Corporation of Ghana in 1967 Under the Provisions of the Statutory Corporations Act, 1993 (Act 461), ECG has since 1997 become a Limited Liability Company called Electricity Company of Ghana. Under the Provisions of the Statutory Corporations Act, 1993 (Act 461), ECG has since 1997 become a Limited Liability Company called Electricity Company of Ghana.

Regulatory Institutions The Public Utilities Regulatory Commission (PURC) was established under Act 538 to make Regulations Concerning Utilities The Public Utilities Regulatory Commission (PURC) was established under Act 538 to make Regulations Concerning Utilities The Energy Commission was also Set up under Act 541 to Work with PURC in Developing Performance Standards. The Energy Commission was also Set up under Act 541 to Work with PURC in Developing Performance Standards.

Power Sector Reforms Due to Growing Demands and Constraints; Difficulties with Traditional Financing Sources in the Power Sector Due to Growing Demands and Constraints; Difficulties with Traditional Financing Sources in the Power Sector World Bank’s Guiding Principles of Transparent Regulations, Commercialisation and Corporatisation, Commitment Lending and Private Investment World Bank’s Guiding Principles of Transparent Regulations, Commercialisation and Corporatisation, Commitment Lending and Private Investment

Reforms (cont.) The need to Expand the Existing Capacity and to Attract both the World Bank and Private Investors Forced GOG to start the Sector Reforms. The need to Expand the Existing Capacity and to Attract both the World Bank and Private Investors Forced GOG to start the Sector Reforms. Ghana would not have started the Reforms if the World Bank had Provided Needed Funds for a Thermal Plant without Insistence on the Reforms (Edjekumhene et al., 2001). Ghana would not have started the Reforms if the World Bank had Provided Needed Funds for a Thermal Plant without Insistence on the Reforms (Edjekumhene et al., 2001).

Policy Objectives Enhancing Transparency Enhancing Transparency Effecting Structural Changes Effecting Structural Changes Encouraging Private Sector Investment Encouraging Private Sector Investment Minimising GOG Sovereignty Minimising GOG Sovereignty Establishing a Regulatory Framework Establishing a Regulatory Framework

Proposed Power Sector Structure Allow Free Entry to both the Generation and Distribution Levels Allow Free Entry to both the Generation and Distribution Levels Transmission System would be Opened to every Generator Transmission System would be Opened to every Generator An Economic Load Dispatch Centre would be Created An Economic Load Dispatch Centre would be Created Generators would Supply Distributors at Regulated Price Generators would Supply Distributors at Regulated Price Several Distributors would Exist and Compete Several Distributors would Exist and Compete

Conclusion Although no Specific Time Frame has been Set by GOG to carry through with the Reforms towards Competition, Significant Inroads have been Made in Terms of Regulations Although no Specific Time Frame has been Set by GOG to carry through with the Reforms towards Competition, Significant Inroads have been Made in Terms of Regulations There are however Impediments that GOG has to Overcome for Smooth Implementation of its Power Sector Development Objectives. There are however Impediments that GOG has to Overcome for Smooth Implementation of its Power Sector Development Objectives.

THANK YOU