Summary of comparison methods we know so far: Present worth Future worth Annual worth Still to come: Rate of return Cost/benefit Payback period.

Slides:



Advertisements
Similar presentations
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Advertisements

Cost Estimation for Engineering Projects CIVE 4312 Hanadi Rifai.
Lecture 7 Evaluating a Single Project PW, FW, AW IRR
Interest and Equivalence L. K. Gaafar. Interest and Equivalence Example: You borrowed $5,000 from a bank and you have to pay it back in 5 years. There.
Chapter Outline 6.1 Why Use Net Present Value?
McGraw-Hill/Irwin Corporate Finance, 7/e © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved. 6-0 CHAPTER 6 Some Alternative Investment Rules.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies,
Sunk Costs, Cost/Benefit and Payback October 1, 2010.
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
McGraw-Hill/Irwin Corporate Finance, 7/e © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved. 6-0 CHAPTER 6 Some Alternative Investment Rules.
Other Analysis Techniques Chapter 9: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Copyright Oxford University Press 2009 Chapter 8 Choosing the Best Alternative.
1 Dr. Lotfi K.GAAFAR Eng. Ahmed Salah RIFKY ENGR 345 Engineering Economy.
Other Analysis Techniques
Comparison Methods Part 2. Copyright © 2006 Pearson Education Canada Inc Introduction Chapter 4 introduced the Present Worth and Annual Worth.
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Lecture 4 Rates of Return. Summary of comparison methods we know so far: Present worth Future worth Annual worth Still to come: Rate of return Cost/benefit.
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
8/25/04 Valerie Tardiff and Paul Jensen Operations Research Models and Methods Copyright All rights reserved Economic Decision Making Decisions.
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Flash back before we compare mutually exclusive alternatives.
COMPARING ALTERNATIVES
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Applications of Money- Time Relationships MARR by PW Method r r All cash inflows and outflows are discounted to the present point in time at an interest.
Quiz Book Summer 2003 Prepared by: Eng. Ahmed Taha.
FINAL EXAM REVIEW Spring Nominal and Effective Interest Rates Payment Period  Compounding Period Mortgages and Car Loans MARR and WACC Present.
Chapter 7 Rate of Return Analysis
Capital Budgeting Net Present Value (NPV)
IEN255 Chapter 6 - Rate of Return Analysis
1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
Choosing the Best Alternative Chapter 8: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Comparing Projects Using Time Value of Money
Engineering Economics. John Ayers September 17, 2004.
Net Present Worth Review NPW can compare mutually exclusive projects or prioritize investments (using Incremental Analysis) Criteria: Choose highest NPW.
Lecture No. 26 Chapter 7 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Some Alternative Investment Rules
ISU CCEE CE 203 Rate of Return Analysis (EEA Chapter 7)
EGR Rate of Return Analysis Rate of Return (ROR) is the rate paid on the unpaid balance of borrowed money, or the rate earned on the unrecovered.
Mutually Exclusive Independent Are compared only against do-nothing More than one can be selected Are compared against each other Only one can be selected.
Rate of return calculations usually involve trial and error solutions Equations can be written in terms of P, F, or A Example: An investment of $20,000.
1 Chapter 7 Rate of Return Analysis. 2 Recall the $5,000 debt example in chapter 3. Each of the four plans were used to repay the amount of $5000. At.
Evaluating a Single Project
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
InvestmentWorth Investment Worth. Investment Worth MARR Suppose a company can earn 12% / annum in U. S. Treasury bills No way would they ever invest in.
Rate of Return Analysis Chapter 7: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Incremental Analysis Lecture No.
Some Basic Truths You can’t add or subtract two cash flows that occur at different points in time. You can’t compare two equivalent values that occur at.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. CHAPTER V PRESENT WORTH ANALYSIS McMc Graw Hill ENGINEERING.
1 1. Order alternatives from lowest to highest initial investment. 2. Let Alternative A 0 (do nothing) be considered the current best. 3. Consider next.
2/22/2016rd Multiple Rates of Return nCash FlowCumulativeAdjusted 10% 20% 0-$500-$500 -$500 -$ (quadratic
Construction Accounting & Financial Management, 3/e Steven Peterson © 2013 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights.
DADSS Lecture 3: Using Excel with Time Value Calculations John Gasper.
Engineering Economics Exam 2 Review. CASH FLOW DIAGRAM Yes -- you do need the Sticks!!
Chapter 7 Rate of Return Analysis. 2  Rate of Return  Methods for Finding ROR  Internal Rate of Return (IRR) Criterion  Incremental Analysis  Mutually.
Comparing Economic Alternatives Using time value of money to choose between two or more options.
8-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 8 Rate of Return Multiple Alternatives © 2012 by.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
EGGC4214 Systems Engineering & Economy Lecture 6 Rate of Return Analysis 1.
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
Quiz Book Summer 2003 Prepared by: Eng. Ahmed Taha.
Chapter 7 Present Worth Analysis
RATE OF RETURN ANALYSIS CHAPTER 7
Engineering Economic Analysis
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

Summary of comparison methods we know so far: Present worth Future worth Annual worth Still to come: Rate of return Cost/benefit Payback period

Comparing Alternatives In comparing alternatives, any cost common to all the alternatives can be ignored. This will sometimes result in all the alternatives having negative present worth. Don’t worry – just choose the least negative. In many situations – for example, Question 2.5 – you will need to be careful to set up the comparison fairly.

Study Period Part of setting up the comparison fairly is to choose the same study period for each alternative. For example: The Chopper lawnmower costs $100, requires $10 in fuel every year, and will last 4 years. The LawnBoy lawnmower costs $120, uses $15 in fuel every year, and lasts 6 years. If I expect to be cutting lawns for the rest of my life, which is the better buy? PW(Chopper) = ( P/A, i, 4) This is wrong! PW(LawnBoy) = ( P/A, i, 6)

The Chopper lawnmower costs $100, requires $10 in fuel every year, and will last 4 years. The LawnBoy lawnmower costs $120, uses $15 in fuel every year, and lasts 6 years. If I expect to be cutting lawns for the rest of my life, which is the better buy? Either determine a salvage value: PW(Chopper) = ( P/A, i, 4) PW(LawnBoy) = ( P/A, i, 4) + S( P/F, i, 4) Or consider the lowest common multiple of lives: PW(Chopper) = ( P/A, i, 12) – 100( P/F,i,4) – 100( P/F,i, 8) PW(LawnBoy) = ( P/A, i, 12) - 120( P/F, i, 6)

The Chopper lawnmower costs $100, requires $10 in fuel every year, and will last 4 years. The LawnBoy lawnmower costs $120, uses $15 in fuel every year, and lasts 6 years. If I expect to be cutting lawns for the rest of my life, which is the better buy? …Or look at Equivalent Uniform Annual Worth: EUAC(Chopper) = -100(A/P, i, 4) – 10 EUAC(LawnBoy) = -120(A/P, i, 6) - 15

Sets of Alternatives Alternatives may be independent, contingent, or exclusive Independent: Buying socks and buying a tie Contingent: Buying shoes and buying socks Exclusive: Buying a Lamborghini and buying a Ferrari

In a complex situation, arrange the possibilities into mutually exclusive subsets and pick the best subset. Example: You can do A, B, C, D or E. If you do A, you can’t do B. To do D, you must do either B or C. If you do E, you must do A. You can’t do both B and C, and if you do D, you can’t do E. What are the possible subsets?

Rates of Return

What is your interest rate?

The MARR This is your Minimum Acceptable Rate of Return If you’re in business at all, it’s because you think you can make more money from your investment than the bank can. So, your MARR must be at least as great as the bank rate.

The MARR If all the initial investment in the business is yours, your MARR is whatever you think it should be. If you’ve borrowed some of the money from the bank, your MARR must be enough to pay the interest on the loan.

If your business is owned by its shareholders… your rate of return must be high enough to keep them happy.

The Internal Rate of Return One way of comparing projects is to calculate their rates of return. If the project’s rate of return is less than your MARR, don’t do it. If you have several projects, the one with the highest rate of return might be the best…

The Internal Rate of Return If your project requires a single present investment, P, and yields a single future payout, F, in N years time, then its rate of return is the solution to: P = F(P/F, i, N)

The Internal Rate of Return This can be re-stated as: PW = P - F(P/F, i, N) = 0 More generally, the internal rate of return, or IRR, is the interest rate which makes the total present worth of the project cashflows equal to zero.

Example: We build a bicycle factory at an initial cost of $ We hire workers at $ a year, payable at year’s end. In the first five years of the project, our year-end sales are: End of YearSales ($ 000) What is the rate of return for the project?

A good way of solving these problems is to build a spreadsheet. We work out the value of: PW = ( P/F,i,1) + 100( P/F,i,2) + 400( P/F,i,3) + 900( P/F,i,4) ( P/F,i,5) For different values of i and plot a graph.

i (P/F, i,1)100(P/F,i,2)400(P/F, i, 3)900(P/F, i,4)1100(P/F, i,5)PW