1 U.S. Department of Transportation ITS Joint Program Office USDOT Intelligent Transportation Systems – Joint Program Office Presenters: Valerie Briggs,

Slides:



Advertisements
Similar presentations
Overview What is the National ITS Architecture? User Services
Advertisements

What Transportation can be
1 IntelliDrive SM IntelliDrive SM for Transit 101 ITS America Annual Meeting May 4, 2010 Jeffrey L. Spencer FTA.
Connected Vehicles AASHTO Annual Meeting | October 17, 2013 | Denver, CO Mike Cammisa Director, Safety Association of Global Automakers.
ITS Joint Program Office 62 nd Illinois Traffic Engineering and Safety Conference October 24, 2013 Walton Fehr.
FGDC Coordinaton Group Connected Vehicles & Digital Infrastructure Carl K. Andersen U.S. Department of Transportation Federal Highway Administration 21.
Applications for the Environment: Real-Time Information Synthesis (AERIS) “ Cleaner Air Through Smarter Transportation ” J.D. Schneeberger 2014 Joint Western/Midwestern.
G4 Apps The Impact of Connected Vehicles on Traffic Operations ISMA Traffic Expo October 1, 2014.
11 April 2013 USDOT Research Data Exchange Dale Thompson, Intelligent Transportation Systems Joint Program Office, and Gene McHale, Federal Highway Administration.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Caltrans Interests in Connected Vehicles
IntelliDrive Safety Workshop July 20, 2010 Alrik L. Svenson US Department of Transportation National Highway Traffic Safety Administration IntelliDrive.
Connected Vehicles: The Future of Transportation Safety and Efficiency.
Advances And Vision In Active Road Safety Systems In The USA 3 rd Conference on Intelligent Transportation Systems in Israel Michael Freitas Ygomi LLC.
1. Overview Background Introduction to IntelliDrive SM Preliminary Research/Proof of Concept Potential Applications –Safety –Mobility –Commercial The.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Michigan VII: Technology Improving Lives ITS Midwest Annual Meeting February 7, 2006 Gregory D. Krueger, P.E. Statewide ITS Program Manager Michigan Department.
USDOT Intelligent Transportation Systems – Joint Program Office Mac Lister Program Manager Knowledge and Technology Transfer ITS Joint Program Office U.S.
Advancing Safety Through Innovation University Transportation Centers Safety Summit March 19-20, 2015 Jeffrey Onizuk Intelligent Transportation System.
IntelliDrive Policy and Institutional Issues Research Valerie Briggs Team Lead, Knowledge Transfer and Policy, ITS Joint Program Office, RITA May 4, 2010.
National VII Architecture – Data Perspective Michael Schagrin ITS Joint Program Office US Department of Transportation TRB 2008 Annual Meeting Session.
Envisioned Role for NTI Concerning ITS Deployment in Egypt by Dr. Mahmoud EL-HADIDI Professor of Telecommunications at Cairo U & Consultant at NTI 3 rd.
Intelligent Transportation System (ITS) ISYM 540 Current Topics in Information System Management Anas Hardan.
1 Paul Pisano FHWA, Team Leader Road Weather & Work Zone Management Weather and the Connected Vehicle Presentation at the Connected Vehicle Program Public.
Role of the Highway-Rail Intersection in the National ITS Architecture IEEE WG14 June 20, 2000 Bruce Eisenhart Lockheed Martin Architecture Development.
FHWA Office of Operations Research and Development and American Association of State Highway and Transportation Officials (AASHTO) AASHTO National Connected.
Smart cities Rasmus Lindholm, Director, ERTICO – ITS
USDOT, RITA RITA: Oversight of USDOT’s R&D programs  University Transportation Centers $100M  UTC Consortia $80M  UTC Multimodal R&D $40M  Intelligent.
ITS ePrimer Module 13: Connected Vehicles September 2013 Intelligent Transportation Systems Joint Program Office Research and Innovative Technology Administration,
Meeting of State Pooled Fund Partners April 20, 2005 "Reducing Crashes at Rural Intersections: Toward a Multi-State Consensus on Rural Intersection Decision.
ITS Program Update Moving Towards Implementation of Wireless Connectivity in Surface Transportation Talking Freight Webinar January 19, 2011.
Eric Eiswerth Safety Research Project Manager FORD AUTOMOTIVE SAFETY OFFICE 2011 AASHTO Annual Meeting The Vehicle of the Future: Greener, Safer, Smarter.
1 IntelliDrive SM Research, Development and Emerging Technologies National ITS Perspective Panel Joseph I. Peters, Ph.D. Federal Highway Administration.
V ehicle I nfrastructure I ntegration Jeffrey F. Paniati Associate Administrator for Operations and Acting Program Manager for ITS Joint Program Office.
Vehicle Infrastructure Integration (VII) FDOT’s Annual ITS Working Group Meeting March 20, 2008 George Gilhooley.
Mike Schagrin US Department of Transportation ITS Joint Program Office IntelliDrive Safety Program Overview.
The Fully Networked Car Geneva, 4-5 March Ubiquitous connectivity to improve urban mobility Hermann Meyer ERTICO.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
Connected Vehicle Program – Dynamic Mobility Applications Highlights for Tech Scan Scrum.
Engaging State DOT’s Engaging State DOT’s 2008 ITS America State Chapters Council Annual Meeting and State Chapters Strengthening Workshop Bernie Arseneau,
FHWA Office of Operations Research and Development Executing the Vehicle-to-Infrastructure Research Program: Enabling Technology September 25, 2013 Deborah.
1 IntelliDrive SM Connectivity − the Future of Surface Transportation June 7, 2010 AASHTO Subcommittee on Highway Transport Kate Hartman Research and Innovative.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
IntelliDriveSM Update
FHWA Perspectives on VII Pat Kennedy Road Weather Management Program Federal Highway Administration VII Weather Applications Workshop II June 21, 2006.
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
Michigan VII: Technology Improving Lives Safety Summit Lansing, MI February 28, 2006 Gregory D. Krueger ITS Program Manager Michigan Department of Transportation.
Context and Priorities April 9,  Why FHWA Focuses on Improving Operations  FHWA Operations Program Areas  Key Current Program Priorities.
National ITS Architecture Update ITS Joint Program Office Professional Capacity Building Program Talking Technology and Transportation (T3) Presentation.
Connected Vehicles Workforce FHWA Vehicle-to-Infrastructure
VII Applications Mike Schagrin, VII Applications Manager ITS Joint Program Office Research & Innovative Technology Administration USDOT Mike Schagrin,
A Vehicle Manufacturer’s Perspective on VII Christopher Wilson ITS Oregon- Feb 1, 2005 Christopher Wilson.
2015 Traffic Records Forum The Impact of Advanced Vehicle Technology on Traffic Records October 27, 2015 Kenneth Leonard Director, Intelligent Transportation.
Traveler Information Applications: How Can VII Improve the Quality of Travel? TRB Session 644: Using VII Data, Part 1 Ben McKeever, US DOT, ITS Joint Program.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
1 IntelliDrive SM Vehicle to Infrastructure Connectivity for Safety Applications Greg Davis FHWA Office of Safety RD&T U.S. Department of Transportation.
Valerie Briggs Team Lead, Knowledge Transfer and Policy ITS Joint Program Office, USDOT April 10, 2013 Inputs to USDOT’s ITS Strategic Research Plan,
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
DSRC and SPaT, SSM, SRM & MAP
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
Melissa Lance Operations Systems Manager July 16, 2015 Connected Vehicle Update National and Virginia Perspective.
ITS: The Next Generation Shelley Row Director Intelligent Transportation Systems Joint Program Office Research and Innovative Technology Administration,
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Connected and Automated Vehicles April 28, 2016 U.S. Department of Transportation (USDOT)
Smart Columbus Overview
Vehicle to Infrastructure Deployment Coalition (V2I DC) & SPaT Challenge Overview January 8, 2017.
SAE DSRC Technical Committee work and outlook
IntelliDriveSM Connectivity and the Future of Surface Transportation
Presentation transcript:

1 U.S. Department of Transportation ITS Joint Program Office USDOT Intelligent Transportation Systems – Joint Program Office Presenters: Valerie Briggs, P.E., PMP, Team Leader, ITS Joint Program Office Brian Cronin, P.E., Team Leader, ITS Joint Program Office Connected Vehicle Basics Intelligent Transportation System (ITS) Joint Program Office T3 Webinar April 24, 2014 Connected Vehicle Basics

2 U.S. Department of Transportation ITS Joint Program Office Agenda 1.Introduction to the Connected Vehicle Environment 2.Connected Vehicle Applications 3.Research Toward Implementation 4.How To Get Involved 5.Question and Answer

3 U.S. Department of Transportation ITS Joint Program Office 1. Introduction to the Connected Vehicle Environment  Explain the concept of connected vehicles  Describe the technology used for connected vehicles  List the benefits and challenges of connected vehicle technology In this topic, we will:

4 U.S. Department of Transportation ITS Joint Program Office NBC Nightly News 0fa95c5ba08bea75c0/index.html

5 U.S. Department of Transportation ITS Joint Program Office NBC Nightly News Video Summary  Greater situational awareness: □ Your vehicle can “see” nearby vehicles and knows roadway conditions you cannot see □ 360-degree “visibility”  Reduce or even eliminate crashes through: □ Driver advisories □ Driver warnings □ Vehicle control Connected vehicles have the potential to address approximately 80% of vehicle crashes involving unimpaired drivers.

6 U.S. Department of Transportation ITS Joint Program Office Transportation Challenges Safety 33,561 highway deaths in ,615,000 crashes in 2012 Leading cause of death for ages 4, Safety 33,561 highway deaths in ,615,000 crashes in 2012 Leading cause of death for ages 4, Mobility 5.5 billion hours of travel delay $121 billion cost of urban congestion Mobility 5.5 billion hours of travel delay $121 billion cost of urban congestion Environment 2.9 billion gallons of wasted fuel 56 billion lbs. of additional CO 2 Environment 2.9 billion gallons of wasted fuel 56 billion lbs. of additional CO 2

7 U.S. Department of Transportation ITS Joint Program Office Fully Connected Vehicles Vehicle Data: Latitude, Longitude, Speed, Brake Status, Turn Signal Status, Vehicle Length, Vehicle Width, Bumper Height Vehicle Data: Latitude, Longitude, Speed, Brake Status, Turn Signal Status, Vehicle Length, Vehicle Width, Bumper Height Infrastructure Data: Signal Phase and Timing, Drive 35 mph, 50 Parking Spaces Available Infrastructure Data: Signal Phase and Timing, Drive 35 mph, 50 Parking Spaces Available

8 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Communications Technology  5.9 GHz Dedicated Short-range Communications (DSRC)  4G and older 3G cellular networks provide high-bandwidth data communications  Other wireless technologies such as Wi-Fi, satellite, and HD radio may have roles to play

9 U.S. Department of Transportation ITS Joint Program Office DSRC Technology: How it Works  Data is transmitted 10 times/sec (300m range)  Privacy is built-in (vehicle location is NOT intended to be recorded or tracked)  Wi-Fi radio adapted for vehicle environment  Inexpensive to produce in quantity  Original FCC spectrum allocation in 1999, revised in 2004 and 2006

10 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Communications Technology: Benefits and Challenges  Benefits of the DSRC communications technology: □ Reduced price □ Improved reliability  fewer false alarms □ Increased performance  addresses more crash scenarios  Challenges of the DSRC communications technology: □ Both parties (vehicle/vehicle or vehicle/infrastructure) need to be equipped to gain benefit □ Requires security infrastructure

11 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Communications Technology: Benefits and Challenges (continued)  Benefits of 4G and 3G cellular technology □ Widely deployed commercial networks □ Increasingly available in vehicles □ Mobility and environmental applications  Challenge of 4G and 3G cellular technology □ May not be suitable for safety applications that require low latency

12 U.S. Department of Transportation ITS Joint Program Office ? Review  What communications technologies are used for connected vehicles applications? □ 5.9 GHz DSRC □ Cellular, 4G □ Satellite  What are the benefits of the DSRC connected vehicle communications technology? □ Reduced price □ Improved reliability □ Increased performance

13 U.S. Department of Transportation ITS Joint Program Office ? Review  What is a major challenge of the connected vehicle technology? □ Both parties (vehicle/vehicle or vehicle/infrastructure) need to be equipped to gain benefit.

14 U.S. Department of Transportation ITS Joint Program Office 2. Connected Vehicle Applications In this topic we will:  Describe the impact of connected vehicles on safety, mobility, and the environment  Describe the connected vehicle applications for safety  Describe the connected vehicle applications for mobility  Describe the connected vehicle applications for the environment  Discuss how connected vehicle applications could address our top transportation challenges

15 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Applications Safety V2V V2I Mobility Dynamic Mobility Applications Environment AERIS Road Weather Applications

16 U.S. Department of Transportation ITS Joint Program Office Safety Applications: V2V V2V Safety Applications Forward Collision WarningFCW Emergency Electronic Brake LightEEBL Blind Spot/Lane Change WarningBSW/LCW Do Not Pass WarningDNPW Intersection Movement AssistIMA Left Turn AssistLTA ) ) ) ) ) ) ) I I I I I I I I I l

17 U.S. Department of Transportation ITS Joint Program Office Lauren is driving home with her son after a day at school. She is stopped at a red light. When the light turns green, she is about to move through the intersection when she is warned of a vehicle crossing the path in front of her. She quickly brakes to avoid a T- bone crash. Safety Applications: V2V Scenario STOP! Vehicle Approaching

18 U.S. Department of Transportation ITS Joint Program Office Safety Applications: V2I ) ) ) ) ) ) )( ( ( ( ( ( ( V2l Safety Applications Curve Speed WarningCSW Red Light Violation WarningRLVW Spot Weather Information WarningSWIW Reduced Speed Zone WarningRSZW Stop Sign Gap AssistSSGA Smart RoadsideSRI Transit Pedestrian Warning

19 U.S. Department of Transportation ITS Joint Program Office Safety Applications: V2I Scenario Charles is on his way to the senior center and does not notice the red light at the intersection. His car signals him to stop immediately.

20 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Applications: Mobility Safety V2V V2I Environment AERIS Road Weather Applications Mobility Dynamic Mobility Applications

21 U.S. Department of Transportation ITS Joint Program Office Dynamic Mobility Applications Multimodal Intelligent Traffic Signal SystemMMITSS Intelligent Traffic Signal SystemI-SIG Transit Signal PriorityTSP Mobile Accessible Pedestrian Signal SystemPED-SIG Freight Signal PriorityFSP Emergency Vehicle PreemptionPREEMPT Intelligent Network Flow OptimizationINFLO Dynamic Speed HarmonizationSPD-HARM Queue WarningQ-WARN Cooperative Adaptive Cruise ControlCACC

22 U.S. Department of Transportation ITS Joint Program Office Dynamic Mobility Applications Response, Emergency Staging and Communications, Uniform Management, and Evacuation R.E.S.C.U.M.E. Incident Scene Pre-Arrival Staging Guidance for Emergency Responders RESP-STG Incident Scene Work Zone Alerts for Drivers and Workers INC-ZONE Emergency Communications and EvacuationEVAC Enable Advanced Traveler Information SystemsEnable ATIS

23 U.S. Department of Transportation ITS Joint Program Office Dynamic Mobility Applications Integrated Dynamic Transit OperationsIDTO Connection ProtectionT-CONNECT Dynamic Transit OperationsT-DISP Dynamic RidesharingD-RIDE Freight Advanced Traveler Information SystemsFRATIS Dynamic Travel Planning and Performance Drayage Optimization

24 U.S. Department of Transportation ITS Joint Program Office Mike is on his way to work and receives a queue warning that there is an incident up ahead. How can connected vehicle mobility applications help Mike get to work on time? Dynamic Mobility Applications: Scenario

25 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Applications: Environment Safety V2V V2I Mobility Dynamic Mobility Applications Environment AERIS Road Weather Applications

26 U.S. Department of Transportation ITS Joint Program Office Environment Applications: AERIS Cleaner Air Through Smarter Transportation ECO-SIGNAL OPERATIONS Eco-Approach and Departure at Signalized Intersections Eco-Traffic Signal Timing Eco-Traffic Signal Priority Connected Eco-Driving Wireless Inductive/Resonance Charging ECO-LANES Eco-Lanes Management Eco-Speed Harmonization Eco-Cooperative Adaptive Cruise Control Eco-Ramp Metering Connected Eco-Driving Wireless Inductive/Resonance Charging Eco-Traveler Information Applications

27 U.S. Department of Transportation ITS Joint Program Office Environment Applications: AERIS Cleaner Air Through Smarter Transportation LOW EMISSIONS ZONES Low Emissions Zone Management Connected Eco-Driving Eco-Traveler Information Applications ECO-TRAVELER INFORMATION AFV Charging/Fueling Information Eco-Smart Parking Dynamic Eco-Routing Dynamic Eco-Transit Routing Dynamic Eco-Freight Routing Multi-Modal Traveler Information Connected Eco-Driving

28 U.S. Department of Transportation ITS Joint Program Office Environment Applications: AERIS Cleaner Air Through Smarter Transportation ECO-INTEGRATED CORRIDOR MANAGEMENT Eco-ECM Decision Support System Eco-Signal Operations Applications Eco-Lanes Applications Low Emissions Zones Applications Eco-Traveler Information Applications Incident Management Applications

29 U.S. Department of Transportation ITS Joint Program Office Paul is driving to work and sees an advisory to adjust his speed to 35 mph. The traffic signal is telling him that if he adjusts his speed, he will arrive at the signal just as it is turning green. Using eco- approach and departure, he maximizes fuel savings, minimizes emissions, and may even get to work faster. Environment Applications: AERIS Scenario

30 U.S. Department of Transportation ITS Joint Program Office Environment Applications: Road Weather Motorist Advisories and Warnings (MAW) Enhanced Maintenance Decision Support System (MDSS) Vehicle Data Translator (VDT) Weather-Responsive Traffic Information (WxTINFO)

31 U.S. Department of Transportation ITS Joint Program Office Danielle sees a warning that she is approaching an icy road. A warning is transmitted from the car ahead of her, from a satellite, and from hardware on the road (pole). Data could have been collected from multiple sources in real-time. She has a lot of confidence because she knows that the data is coming from these sources in real-time. Danielle sees a warning that she is approaching an icy road. A warning is transmitted from the car ahead of her, from a satellite, and from hardware on the road (pole). Data could have been collected from multiple sources in real-time. She has a lot of confidence because she knows that the data is coming from these sources in real-time. Environment Applications: Road Weather Scenario

32 U.S. Department of Transportation ITS Joint Program Office ? Applications Poll Which application area is your top priority? a)Safety b)Mobility c)Environment d)Road weather e)Others? Please send using chat box.

33 U.S. Department of Transportation ITS Joint Program Office 3. Research Toward Implementation In this section we will:  Describe the three main connected vehicle research program components  Describe the enabling technologies for the V2I reference implementation  Describe how communication and exchange of data will occur between mobile, field, and center entities  Answer questions regarding connected vehicle infrastructure implementation

34 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Research: Policy and Institutional Issues Component ApplicationsTechnology Policy and Institutional Issues Safety Mobility Environmental Standards & Architecture Human Factors Systems Engineering Certification Test Environments Deployment Scenarios Financing and Investment Models Operations and Governance Institutional Issues Privacy and Security

35 U.S. Department of Transportation ITS Joint Program Office Enabling Technologies

36 U.S. Department of Transportation ITS Joint Program Office Role of Equipment in Connected Vehicles Data Standards

37 U.S. Department of Transportation ITS Joint Program Office Role of Data in Connected Vehicles Equipment Data V2I Communications Support Safety, Mobility, and Environmental Applications: Signal Phase and Timing data supports red light violation warning (safety), arterial speed harmonization (mobility), and eco signal operations (environment) The Basic Safety Message, developed for V2V safety applications, also supports the Intelligent Traffic Signal Systems mobility application Probe data supports transportation operations, traveler information, transportation planning, and asset management Common functions shared across applications: positioning, mapping, and communications Process for Application Testing (e.g., leverage Affiliated Test Beds) The traffic management center is involved in disseminating the real time data that enables these applications Standards

38 U.S. Department of Transportation ITS Joint Program Office Role of Standards in Connected Vehicles Equipment Data Standards Interface standards are essential USDOT working with public and private sector to define: Communications standards for DSRC Other media, e.g., 4G LTE and/or HD radio may be used for appropriate applications Information exchange standards Message sets for V2X Minimum performance requirements for V2X messaging Signal controller messages

39 U.S. Department of Transportation ITS Joint Program Office  A system of specifications and requirements that allow the various components of V2I hardware, software and firmware to work together.  An agency will be able to select the capabilities and applications desired at a given installation. V2I Reference Implementation

40 U.S. Department of Transportation ITS Joint Program Office  Definition of General Services: □ Data Distribution □ Security Credential Management □ Infrastructure Management  Capabilities/Principles: □ Secure exchange of trusted data between users and applications without pre-existing relationship or entering into a permanent relationship □ Assurance of privacy between users and from third parties □ More efficient data collection from various sources and distribution to many users Connected Vehicle Supporting Services

41 U.S. Department of Transportation ITS Joint Program Office Security Challenges  Message validity  Security entity  Network  Business models for security operations

42 U.S. Department of Transportation ITS Joint Program Office Privacy Challenges  A user cannot be tracked along his journey or identified without appropriate authorization.  User privacy can be protected further through policy means. We’ve done initial privacy analysis of the system and will have privacy experts do a comprehensive review of any final system proposed for implementation.

43 U.S. Department of Transportation ITS Joint Program Office ? U.S. Department of Transportation ITS Joint Program Office Review  What are the three ITS research program components? □ Applications □ Technology □ Policy and Institutional Issues  What are the three categories of enabling technologies for the connected vehicle infrastructure? □ Equipment □ Data □ Standards

44 U.S. Department of Transportation ITS Joint Program Office ? U.S. Department of Transportation ITS Joint Program Office Review  What are some of the security challenges? □ Message validity □ Security entity □ Network □ Business models for security operations

45 U.S. Department of Transportation ITS Joint Program Office 4. How To Get Involved In this topic, we will:  Discuss the ITS Test Beds  Describe the USDOT’s path to deployment  Describe opportunities for stakeholder involvement with the connected vehicle research program

46 U.S. Department of Transportation ITS Joint Program Office Affiliated Interoperable Test Beds  The vision is to have multiple interoperable locations as part of one connected system moving toward nation-wide deployment. □ Common architecture □ Common standards □ Independent operations □ Shared resources Vision

47 U.S. Department of Transportation ITS Joint Program Office Overview of USDOT Test Bed Resources  Qualified Product List for RSE □ 5 vendors  Qualified Product List for Onboard Equipment (OBE) □ Vehicle Awareness Devices □ Aftermarket Safety Devices  Portable RSE Trailers  Network Listeners/Sniffers  Test Bed Operations Staff  Signal Phase and Timing (SPaT) Resources □ Listeners □ Interface standards from FHWA  Security Credential Management System (SCMS) □ certificate management system

48 U.S. Department of Transportation ITS Joint Program Office Southeast Michigan Test Bed—2014  The Southeast Michigan 2014 Test Bed will: □ Give users the capability to test safety, mobility, and environment applications, services and components. □ Define the “high level” system architecture using CVRIA as a reference and foundation. □ Introduce concepts in terms of functions and information flows. □ Illustrate concepts through selected operational scenarios.  In the Southeast Michigan 2014 Project, we want to: □ Assure trust in data exchanged. □ Protect the confidentiality of certain data exchanged. □ Protect the anonymity and privacy of individuals while operating in a multi- application, multi-industry, multi-medium environment.

49 U.S. Department of Transportation ITS Joint Program Office USDOT Connected Vehicle PlugFest  Upcoming Events in 2014: □ Midwestern PlugFest: March 12-13, 2014, Novi, MI □ Western PlugFest: June 2014, Palo Alto, CA □ Bimonthly World Congress Mini-Fests tentatively scheduled for: ▪May 2014, Novi, MI ▪July 2014, Detroit, MI ▪Mid-August 2014, Detroit, MI □ Hackathon: Early November 2014/January 2015, Novi, MI

50 U.S. Department of Transportation ITS Joint Program Office Benefits of Test Bed Membership  Designation of Affiliated Test Bed  Access to USDOT support staff and resources  Increased access to lessons learned, documentation, and other information from peers deploying test beds  Test beds serve as a model for future permanent deployments  Provide opportunities for future testing Contact: Walton Fehr, Systems Engineering and Test Bed Manager U.S. Department of Transportation Intelligent Transportation Systems Joint Program Office Contact: Walton Fehr, Systems Engineering and Test Bed Manager U.S. Department of Transportation Intelligent Transportation Systems Joint Program Office

51 U.S. Department of Transportation ITS Joint Program Office Path to Deployment FHWA Deployment Guidelines NHTSA Decision to Move Forward with V2V communication for light vehicles NHTSA Decision for Heavy Vehicles Safety Pilot in 2013 Defined V2V Apps Defined Safety (V2I), Mobility (V2V & V2I), AERIS and Weather Apps Defined Safety (V2I), Mobility (V2V & V2I), AERIS and Weather Apps Pilots/Early Deployments Application Development

52 U.S. Department of Transportation ITS Joint Program Office US DOT/NHTSA Decision on V2  Announced on February 3 rd, 2014 for light vehicles  Primary purpose: enable collision warnings to drivers prior to a crash  Based on several years of research including the safety pilot model deployment – 3000 vehicle road test in Ann Arbor, Michigan □ Report pending  Security and privacy protections built into contemplated system □ No exchanging or recording of personal information □ No tracking of vehicle movements  After circulating the research report for public comment, NHTSA will then begin working on a regulatory proposal to require V2V devices in new light vehicles in a future year  Decision on heavy vehicles planned at end of 2014

53 U.S. Department of Transportation ITS Joint Program Office AASHTO Connected Vehicle Field Infrastructure Footprint Analysis  USDOT asked AASHTO to create a vision of a national connected vehicle infrastructure  Provides guidance to state agencies and DOTs, including: □ Infrastructure needs at regional and national levels □ Illustrations of typical deployments at signalized intersections, urban freeways, rural roadways, international border crossings, and other locations □ System and equipment needs and siting requirements □ Operations, maintenance and institutional issues □ Deployment cost estimates

54 U.S. Department of Transportation ITS Joint Program Office Infrastructure Deployment Planning  National Connected Vehicle Field Infrastructure Footprint Analysis  Standardized interfaces  Certification processes for equipment and systems  Nationwide Security Credential Management System (SCMS)

55 U.S. Department of Transportation ITS Joint Program Office Stakeholder Involvement is Critical Upcoming Stakeholder Meetings and Webinars

56 U.S. Department of Transportation ITS Joint Program Office Connected Vehicle Pilot Deployments  The goals of the CV Pilots Program are to: □ accelerate early deployment of Connected Vehicle technology □ understand and estimate benefits associated with deployment □ identify and solve key technical and institutional barriers  Pilots will serve as initial implementations of connected vehicle technology deployed in real world settings.  Request for Information (RFI) issued March 2014 to help refine the plans for one or more pilot deployments  Procurement action anticipated for one or more pilot deployment concepts in 2015.

57 U.S. Department of Transportation ITS Joint Program Office Exploratory Research—Vehicle Automation  Enhanced by connectivity to other vehicles and infrastructure □ For example, vehicle platooning  Benefits of Connectivity □ Increases availability, speed, and reliability of information □ Enables coordination of automated traffic streams The full potential benefits of road vehicle automation can only be achieved through a connected environment

58 U.S. Department of Transportation ITS Joint Program Office ? U.S. Department of Transportation ITS Joint Program Office 5. Question and Answer Please type your questions in the Q&A box and we will answer as time allows. Contacts: Brian Cronin, Team Leader ITS Joint Program Office Valerie Briggs, Team Leader ITS Joint Program Office Mac Lister, Program Manager ITS Professional Capacity Building Program

59 U.S. Department of Transportation ITS Joint Program Office To Learn More Connected Vehicle 101 Workshops at ITS America State Chapter meetings: Aug 2104 – Philadelphia, PA Sept 7 – Detroit, MI (ITS World Congress) Sept 30 – Anchorage, AK October 15 – Santa Clara, CA Nov 12 – Irving, TX Website: Facebook: