PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.

Slides:



Advertisements
Similar presentations
Estimating, scheduling and budgeting
Advertisements

Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8: Scheduling Resources and Costs
Prof. Roy Levow Session 4.  The Work Breakdown Structure  Uses for the WBS  Generating the WBS  Six Criteria to Test for Completeness in the WBS 
Network Analysis and Duration Estimating Kathy S. Schwaig.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management 6e..
Microsoft Project.
Resource Planning. 51 Resource Planning Estimating Schedule Activity Resource Requirements Determining what resources will be required (labor, equipment,
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
Project Management Techniques.
Chapter 4: Project Management Objectives Define the terms project and project management, and differentiate between project and process management. Describe.
Project Time Management
Degree and Graduation Seminar Cost Management
Time and Cost Estimation
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
What is Project Cost Management?
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
HIT241 - COST MANAGEMENT Introduction
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
6 Resource Utilization Teaching Strategies
Resources Management Dr. Ahmed Elyamany.
Chapter 8: Resource Allocation NET481: Project Management Afnan Albahli.
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Appendix A Project Management: Process, Techniques, and Tools.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Chapter 4: Project Cost Management
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Cost Estimation. 2 What is Cost and Project Cost Management? Cost is a resource sacrificed or foregone to achieve a specific objective, or something.
~ pertemuan 9 ~ Oleh: Ir. Abdul Hayat, MTI April 2009 [Abdul Hayat, Project Cost Management-1, Semester Genap 2008/2009] 1 PROJECT COST MANAGEMENT (1)
Project Cost Management
Scheduling Resources and Cost
Resource analysis Project management (lecture + seminar)
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Chapter 7: Project Cost Management
Resource analysis 1 Project management (seminar).
Allocate and Level Project Resources.  Resource Allocation: Defined Resource Allocation Resource Allocation is the scheduling of activities and the resources.
ALLOCATE AND LEVEL RESOURCES
SOFTWARE PROJECT MANAGEMENT
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
6 Resource Utilization 4/28/2017 Teaching Strategies
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Scheduling Resources and Costs
Chapter 7: Project Cost Management
Resource Allocation Chapter#8.
Project Management -- Scheduling Resources and Costs
Chapter 7: Project Cost Management
ENGINEERING MANAGEMENT (GE 404)
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
ENGINEERING MANAGEMENT (GE 404)
Resource Allocation Chapter#8.
What is Project Human Resource Management (PHRM)?
Resource Allocation Chapter#8.
Resource Allocation Chapter#8.
University of Debrecen Mongolian University of Life Sciences
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Chapter 7: Project Cost Management
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
Presentation transcript:

PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT

Topics Covered  Resource Management  Project Costing  Sample Problems

Each activity of the project has certain resource requirements i.e. people and machine. These requirements (usually) vary with activity duration. For example, an activity has a total requirement of 12 days (man-days) of a welder and a helper. With the normal activity duration of 6 days, 2 welders and 2 helpers available will perform the task. By crashing, this activity can be completed in 4 days. One additional welder and helper has to be hired on job basis or on contract. Resource Management

 Determining what resources will be required (labor, equipment, material) What quantity for each resource will be required When are resources available to perform project activities. Estimating Resource Requirements (For Scheduled Activity)

Resource Estimating Techniques Expert Judgment – Any group or person with specialized knowledge. Bottom-Up Estimating – Decompose activities into smaller work components. Three Point Estimating – Optimistic, pessimistic and most likely values are determined to calculate estimate.

The four major stages of resource scheduling process are   Resource definition   Resource allocation   Resource aggregation   Resource leveling Resource definition Resource definition involves identifying the critical resources that need to be planned and managed for the successful completion of the project. Resource Scheduling Process

  Resource allocation, is concerned with assigning the required number of those resources identified in the previous step to each activity identified in the plan.   More than one type of resource may be attributed to a specific activity. For example, fixing the plates on a ship's hull may require 10 fitters, 20 welders, 15 laborers and a certain type of welding machine. Resource Allocation

  From a practical standpoint, resource allocation does not have to follow a constant pattern; some activities may initially require fewer resources but may require more of the same resources during the later stages of the project.   In a multi-project environment as projects are competing for limited resources, resource allocation addresses the problem of the optimum use and timing of the assignment of these resources to the various project activities.

Resource aggregation, or resource loading, is simply the summation, on a period-by-period basis, of the resources required to complete all activities based on the resource allocation carried out in the previous stage.   The results are usually shown graphically as a histogram. Such aggregation may be done on an hourly, daily, or weekly basis, depending on the time unit used to allocate resources.   When a bar chart is used as the planning tool, the resource aggregation is fairly simple and straightforward. For a given bar chart, there is a unique resource unit aggregation chart which can be drawn underneath the bar chart.   A separate graph will be required for each resource unit. Resource Aggregation

  An example is shown in figure 01 below, where, for a particular resource, the required resource units for each time period are annotated on the bar chart. The total number of resource units for each time period can then be summed and a resource aggregation or load chart can be produced.

Resource Unit Aggregation Chart Showing Resource Requirements Associated with Earliest and Latest Start Along with Highlighted Resource Unit Requirements for Critical Path Activities.

 Resource leveling ensures that resource demand does not exceed resource availability. Resource Leveling Resource Leveling is a process used to examine a project for an unbalanced use of resources (usually people) over time, and for resolving over-allocations or conflicts. Resource Demand Compared to Resource Availability

Analyzing the issues involved in resource leveling for a situation where a bar chart has been used as the primary planning technique for a simple project.  The reason for this is that resource leveling must be considered within a time framework and bar charts are drawn to a time scale while networks are not. In figure the time-scale for the activities comprising the project are shown in a bar chart, which also shows resource requirements for one particular resource unit.

An examination of the bar chart and its associated resource chart in figure 01 shows that improvements can be made to the level of resource requirements by:  Delaying or bringing forward the start of certain activities  Extending the duration of certain activities and so reducing the demand for resources over the duration of the activity or by a combination of both of these adjustments

Resource Smoothing Resource smoothing is part of the resource leveling process.  In itself, resource smoothing is the process that, not withstanding any constraints imposed during the leveling process, attempts to determine a resource requirement that is "smooth" and where peaks and troughs are eliminated.  For example, even if 7 units of a given resource are available at any one time, utilizing 5 of these units each week is preferable to 4 in one week, 7 the next, 2 the next and so on.  Even if there is no limit to the amount of any one resource available, it is still desirable that resource usage is as smooth as possible.

 Given that the resource requirements of those activities on the critical path are fixed, some order or priority needs to be established for selecting which activity and which particular resource associated with this activity should be given priority in the smoothing process.  In determining which activity should be given priority, a subjective judgment should be made about the type of resource (or resources) associated with each activity; priority should be given to the activities whose resources are considered to be most important.  Beyond this consideration, activities should be ranked in order of total work content and total float or slack available for that activity. A useful device for prioritizing is to consider the ratio of total work content/total float remaining and give priority to activities with the highest value of this ratio.

ActivityPreceding Activity Duration (days) Persons Required Remarks A-32F + 2LF-Fitter B-42M + 2LL-Labor C-62W+ 2LW-Welder DA104F + 4LM-Mason EB42M + 2L FC22W + 2L GD42F + 2L HE, F, G33F + 3L Problem 11 Problem 11 Develop network model and resource requirement plan for the project given below:

Problem 11 Problem 11

Solution of Problem 11 Solution of Problem 11 Resource bar chart with given requirements Bar Chart with given Resource Requirements

Practice Problem 04 Bar Chart with modified Resource Requirements Resource Leveling is done on non-critical activities without any change in project finish time. Solution of Problem 11 Solution of Problem 11

Histogram for Labor required in the Project Solution of Problem 11 Solution of Problem 11

F Histogram for Fitters required in the Project Solution of Problem 11 Solution of Problem 11

The DURATION of a task is the time required for its execution and depends upon the units of resources involved in the task. The duration is most often measured in days or in working hours. (16 hours) The UNITS are the resources available to perform the task. For human resource, we speak of people. ( 2 people) The WORKLOAD of a task is the result of duration multiplied by the units. This assessment is often measured in people-days or in people-hours. ( 32 people-hours)  DURATION = WORKLOAD / UNITS 16 hours = 32 people-hours / 2 people Workload and its Calculation

A team composed of two workers do a task in six days at 100% efficiency HYPOTHESIS: If the efficiency of a 4 workers team is only 75%, what will be the task duration? ANSWER: 4 days = 12 person-days / (4 x.75)

Cost is a resource sacrificed or foregone to achieve a specific objective, or something given up in exchange.  Costs are usually measured in monetary units, such as dollars. Project cost management includes the processes required to ensure that the project is completed within an approved budget. Project Costing

Cost Estimating: Developing an approximation or estimate of the costs of the resources needed to complete a project. Cost Budgeting: Allocating the overall cost estimate to individual work items to establish a baseline for measuring performance. Cost Control: Controlling changes to the project budget.

Cost Estimating Project managers must take cost estimates seriously if they want to complete projects within budget constraints. It is important to know the types of cost estimates, how to prepare cost estimates, and typical problems associated with cost estimates.

Basic Tools and Techniques for Cost Estimates: Analogous or top-down estimates: Use the actual cost of a previous, similar project as the basis for estimating the cost of the current project. Bottom-up estimates: Involve estimating individual work items or activities and summing them to get a project total. Parametric modeling: Uses project characteristics (parameters) in a mathematical model to estimate project costs. Computerized tools: Tools, such as spreadsheets and project management software, that can make working with different cost estimates and cost estimation tools easier.

29