LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.

Slides:



Advertisements
Similar presentations
LIGO-G M May 17, 2006 Installation (INS) Requirements and Design Breakout Presentation NSF Review of Advanced LIGO Project Dennis Coyne, Caltech.
Advertisements

LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
G R LIGO Advanced System Test Interferometer LIGO Advanced R&D Review M. Zucker 8 October, 2002.
LIGO-G D Suspensions Update: the View from Caltech Phil Willems LIGO/Caltech Livingston LSC Meeting March 17-20, 2003.
1 LIGO-G v3 Transmission Monitoring Telescope and Suspension – TMS Eric Gustafson aLIGO NSF Review LIGO Livingston Observatory April 25-27, 2011.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Dennis Coyne Excomm Jan 26, 2004
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
Review of HAM Suspension Designs for Advanced LIGO Norna A Robertson HAM Isolation Requirements Review Caltech, July 11th 2005.
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
LIGO-G M LIGO Status and Plans Barry Barish LSC Meeting 19-Aug-02.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors David Shoemaker NSF Operations Review Hanford, 26 February 2001.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G D Advanced LIGO: Detector Organization, Responsibilities, Authority and Decision Tree: SUS and COC Dennis Coyne, Carol Wilkinson, David.
LIGO-G D Suspensions Design for Advanced LIGO Phil Willems NSF Review, Oct , 2002 MIT.
LIGO-G R 1 LIGO Laboratory R&D for the period Fall 2007 to Fall 2008 Presented at the MIT MOU Review August 2007.
G R Advanced LIGO Seismic Isolation R&D Dennis Coyne 8 Oct 2002.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Conceptual Design for Advanced LIGO Suspensions Norna A Robertson University of Glasgow and Stanford University for the GEO suspension team +contribution.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
Update on Advanced LIGO suspension design and technology development towards the quad noise prototype Caroline A. Cantley for Advanced LIGO Suspension.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
Advanced LIGO Suspension Status Caroline A. Cantley Advanced LIGO Suspension Team / University of Glasgow for the GEO600 Group LSC Meeting, LLO March 2004.
LIGO-G R The LIGO Advanced System Test Interferometer Mike Zucker, David Shoemaker, Ken Mason LLO LSC 16 March 2001.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
G M MIT LIGO David Shoemaker LIGO PAC 27 June 02.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
G R 1 Advanced LIGO Update David Shoemaker LSC LHO March 2006.
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
Update on Suspension Activities for Advanced LIGO Caroline A. Cantley University of Glasgow for the GEO600 Group LSC Meeting, Livingston, March 2003 (Technical.
Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford,
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z.
LIGO- G050xxx -00-D Advanced LIGO SUS Installation into BSC Chambers: Mechanical Fixtures Dennis Coyne (with input from many) G May 4 th 2005.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G Z.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
LIGO-G Z Adaptive FIRs taking place at Lasti Richard Mittleman Laurent Ruet Brett Shapiro April 2006.
G R LIGO R&D1 Advanced LIGO Update David Shoemaker LSC LHO August 2004.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
LIGO LAB R&D PROGRAM TECHNICAL REVIEW, OCT 02
LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI)
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
Advanced LIGO Quad Prototype Janeen Romie LSC, March 2004
Lasti Update July 25, 2007 LIGO-G Z
Way to many People to List
Seismic Developments at LASTI LIGO-G Z
Status of LIGO Installation and Commissioning
R&D Highlights Seismic Isolation Suspensions ISC/40m
Stan Whitcomb LSC meeting Livingston 21 March 2005
Stan Whitcomb LSC meeting Hanford 15 August 2005
LIGO Advanced System Test Interferometer
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
Presentation transcript:

LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August 2004 LIGO-G Z

LSC Meeting August ‘04 2 Talk Overview 1. Short review of LASTI goals 2. Concerns raised at previous review 3. Progress since Nov Medium term detailed plans and general long term goals 5. Conclusions

LSC Meeting August ‘04 3 LASTI Mission Test LIGO components & systems at full mechanical scale Practice installation & commissioning Minimize delays & downtime for advanced LIGO upgrades Qualify design modifications & retrofits for initial LIGO Specific Advanced LIGO Program Tasks (‘01 - ‘06+): Qualify advanced isolation & suspension systems and associated controls at full scale Develop detailed SEI/SUS installation & commissioning handbook Look for unforeseen interactions & excess displacement noise Test PSL and Input Mode Cleaner together at full power

LSC Meeting August ‘04 4 LASTI People Resident MIT Staff Students - Laurent Ruet (PhD student at INSA) Engineering - Myron MacInnis, Ken Mason, Jonathan Allen Scientists - Gregg Harry, Rich Mittleman, Dave Ottaway, David Shoemaker, Pradeep Sarin, Mike Zucker (Advice) Computers – Keith Bayer Laboratory and LSC Visitors (to date) Initial SEI & SUS- Corey Gray, Hugh Radkins, Gary Traylor, Harry Overmier, Betsy Bland, Jonathan Kern, Marcel Hammond, Dennis Coyne… Advanced SEI - Joe Giaime, Brian Lantz, Wensheng Hua, Corwin Hardham, Samir Nayfeh and Lei Zuo Advanced SUS - Norna Robertson, Calum Torrie, Janeen Romie, Phil Willems, Justin Greenhalgh, Ken Strain, Caroline Cantley, Mark Barton… CDS/DAQ - Jay Heefner, Rus Wooley, Paul Russel…

LSC Meeting August ‘04 5 LASTI Advanced LIGO R&D Program Commission infrastructure (vacuum, cleanrooms, cranes…) Commission PSL & controls Commission initial seismic stack, suspensions & 1m test cavity in HAM chamber Develop & test EPI for LLO seismic remediation Qualification test of early pre-prototype triple pendulum Integrate/test active BSC SEI pathfinder Integrate/test active HAM SEI pathfinder (Significant Delay) Integrate/test Quad and Triple suspensions Integrate/test sapphire & fused silica core optics Qualify for low displacement noise with sensitive interferometer system Integrate and test full scale adaptive thermal compensation Integrate/test AdLIGO 180 Watt PSL & Mode Cleaner

LSC Meeting August ‘04 6 Since the Last Review At the last review TAC requested: Optical Layout prepared by this review Detailed Schedule completed by this review »Completed thru till start of 2006 »Beyond that this is effected by tight budgetary conditions LASTI major progress since review Adaptive feedforward system developed for HEPI HAM Mode cleaner controls prototype installed in Xend HAM LASTI local staff contributed significantly to Livingston HEPI and TCS (Tested at LASTI) Laurent Ruet has decided to do a PhD focusing on LASTI related work

LSC Meeting August ‘04 7 LASTI Detailed Optical Layout

LSC Meeting August ‘04 8 MC Triple Prototype Installation Test MC Controls Prototype successfully installed in Xend HAM Documentation being prepared Preparing for 6 DOF shake test

LSC Meeting August ‘04 9 HEPI HAM Adaptive Feedforward P, primary channel S, secondary channel W, controller disturbance performance measurement + x 0 (t)e(t)=x(t) u(t) d(t) LMS r(t).. Suggested to us by Samir Nayfeh and Lei Zuo Uses a witness to continually update a FIR filter controller Utilizes that transfer function for secondary channel is easy to measure c.f with primary channel Tried successfully using witness geophones mounted on the optical table More recently used support table geophones ie in build HEPI sensors

LSC Meeting August ‘04 10 HEPI Adaptive Feedforward Results Achieved using monitoring from support table geophones 3 Translational DOF of freedom isolation

LSC Meeting August ‘04 11 LASTI Height Issues Resolved LASTI roof lower than observatory LASTI constraints should not drive AdvLIGO requirements and design Seismic design has eliminated this problem Suspension will still need to be split

LSC Meeting August ‘04 12 Short term plans (ie 6months) Continue with MC Triple Testing Remove and store the LIGO 1 BSC Seismic Isolation Prepare tooling for installation of Advanced LIGO Seismic and Controls Prototype Install Advanced LIGO Seismic and controls prototype

LSC Meeting August ‘04 13 LASTI Schedule (Detailed-Short Term) June ’04MC Triple installed at LASTI June ’04Design of LASTI Noise Optics to COC [CODS and Budget] June ’04Commence optical and electronic design for controls cavity tests ie readout design, wavefront sensors July ’04HEPI Installed under Xend HAM Aug ’04Start transfer function tests of the MC Triple using HEPI excitation Aug ’04Budgetary estimate for LASTI for 2005 [Management] Sept ’04Controls optical design and electronic design completed [LASTI Oct ’04Commence acquisition of additional components for LASTI Controls prototype optics and electronics [LASTI and CDS] Nov ’04Report on MC Triple installation and LASTI tests [LASTI and SUS] Jan ’05Receive Quad Controls Prototype [SUS] Feb ’05Assemble Quad Controls Prototype [SUS] Mar ’05BSC Advanced LIGO Seismic arrive at LASTI [SEI] Apr ‘05Assemble BSC Adv. LIGO SEI and fit-check [LASTI AND SEI] May ’05Cartridge install Quad / BSC Seismic Isolation [LASTI]

LSC Meeting August ‘04 14 LASTI Schedule (Longer Term) 4Q02: MC triple suspension prototype installed for “controls” pre- test begins 2Q05: BSC SEI pathfinder installed for standalone testing 2Q05: Quad controls prototype 4Q05: HAM SEI pathfinder installed for standalone testing 1Q06: LASTI noise test begins; SUS prototypes installed 3Q06: Interferometric displacement tests 4Q06: Thermal compensation integration and test 1Q07: LASTI SUS/SEI test review 3Q07: Adv LIGO PSL/MC tests start (180 Watts) Depends heavily on available funds

LSC Meeting August ‘04 15 Conclusions Optical layouts and detailed medium term schedules completed MC triple controls prototype installation completed and functionality test have commenced Overview of long term plans presented, more details will be added when funding picture becomes clearer