„ Fuzzy Expert” System for Determination of Runways in Use Case Study: Zurich Airport Fedja Netjasov University of Belgrade Faculty of Traffic and Transport.

Slides:



Advertisements
Similar presentations
Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt.
Advertisements

Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Imperial College 1 Towards a Controller Pilot Collaborative Decision Making Methodology A. Majumdar, W.Y. Ochieng, J.W. Polak Centre for Transport Studies.
Work load and responsibilit y npor. Ing. Miroslava Šimonová.
Airside Capacity Enhancement
Airport Planning and Design
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
BITS Pilani Hyderabad Campus MULTIPLE CRITERIA EVALUATION OF WIND ENERGY SYSTEMS Pushkar Kumar Jain, B.E. (Hons.) Mechanical Morapakla Srinivas, Assistant.
The European Organisation for the Safety of Air Navigation BORYSPIL ACE & PLANNING STUDY Mariia Naumenko.
Scottsdale Airport Operations Plan Photo by Justin Lawrence.
ECE 796/896 Human Factor Engineering Chapter 22 Human Factors in System design.
University of Belgrade – Faculty of Transport and Traffic Engineering, Vojvode Stepe 305, Belgrade, SERBIA Phone: +381(11) , +381(11) 3091.
Engineering Data Analysis & Modeling Practical Solutions to Practical Problems Dr. James McNames Biomedical Signal Processing Laboratory Electrical & Computer.
WELCOME TO THE WORLD OF FUZZY SYSTEMS. DEFINITION Fuzzy logic is a superset of conventional (Boolean) logic that has been extended to handle the concept.
1 FPAW Fall Meeting, October 22, Develop an analytical model that explicitly incorporates weather forecasts, and their uncertainty, in estimating.
The air traffic controller’s perspective on runway excursion hazards and mitigation options Session 2 Presentation 3.
Runway Excursions. Runway Excursion 2000 Worldwide, runway excursions are the highest single occurrence category of all accidents for commercial & general.
Airline Schedule Optimization (Fleet Assignment II) Saba Neyshabouri.
Date: 18 February 2008 Federal Aviation Administration Collaborative Decision Making at the FAA/ATO A look at how CDM is applied in the U.S.
Presented to: By: Date: File: apo130\Airport Efficiency\TAER SAER Updated Briefing(2).ppt 1030 Federal Aviation Administration Presentation of System Airport.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
Calculus and NASA Michael Bloem February 15, 2008 Calculus Field Trip Presentation Michael Bloem February 15, 2008 Calculus Field Trip Presentation.
Submitted to – Shanda Paul Submitted to – Mrs. stead.
Weather Satellite Data in FAA Operations Randy Bass Aviation Weather Research Program Aviation Weather Division NextGen Organization Federal Aviation Administration.
New Engine Thrust Calculation For Arrivals ICRAT 2004 Ivan de Lépinay, ENVISA, Paris (France) based on a dynamic equilibrium equation Welcome!
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Workshop PRIXNET – 11/12 Mars CONGESTION PRICING IN AIR TRANSPORTATION Karine Deschinkel Laboratoire PRiSM – Université de Versailles.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
1 A Maximizing Set and Minimizing Set Based Fuzzy MCDM Approach for the Evaluation and Selection of the Distribution Centers Advisor:Prof. Chu, Ta-Chung.
LMINET2: An Enhanced LMINET Dou Long, Shahab Hasan December 10, 2008.
Survey of Traffic and Radar Controller Communication and Workload
Situational Awareness Numerous aircraft and operational displays, when combined with effective and efficient communications and facilities, provide Air.
Lecture 3: Air Traffic Control Tower
F066-B © 2008 The MITRE Corporation. All rights reserved. MITRE-CAASD’s systemwideModeler State and Near-Term Plans Pete Kuzminski 10 December 2008.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
Federal Aviation Administration TAIWIN By: Jim Riley, ANG-E282 To: Icing Wx Tools Meeting Date: 11/19/13 – 11/21/13.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Quantitative Techniques Deepthy Sai Manikandan. Topics: Linear Programming Linear Programming Transportation Problem Transportation Problem Assignment.
Improving Revenue by System Integration and Cooperative Optimization Reservations & Yield Management Study Group Annual Meeting Berlin April 2002.
1 An Integer Linear Programming model for Airline Use (in the context of CDM) Intro to Air Traffic Control Dr. Lance Sherry Ref: Exploiting the Opportunities.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
MODEL FOR DAILY OPERATIONAL FLIGHT SCHEDULE DESIGNING Slavica Nedeljković Faculty of Transport and Traffic Engineering, University of Belgrade Serbia and.
Airspace 1 st LT Zouhar Jakub 12 th September 2014.
© 2002 GMU SYST 495 AATMS Team Autonomous Air Traffic Management System (AATMS): The Management and Design of an Affordable Ground-Based Air Traffic Management.
Dr. Anis Koubâa CS433 Modeling and Simulation
Air Traffic Controller
RSPA/Volpe Center Arrival/Departure Tradeoff Optimization at STL: a Case Study Dr. Eugene P. Gilbo tel.: (617) CDM.
Lecture №4 METHODS OF RESEARCH. Method (Greek. methodos) - way of knowledge, the study of natural phenomena and social life. It is also a set of methods.
Terminal Airspace Traffic Complexity Fedja Netjasov University of Belgrade Faculty of Traffic and Transport Engineering Division of Airports and Air Traffic.
LIGHTNING PROTECTION OF TRANSMISSION AND DISTRIBUTION LINES Team Members Eric Nelson, EE – Project LeaderDavid Dieterich, EE Tim Conrad, EE – Com. CoordinatorSam.
Mr. Lagomarsino Money Power with Technology Applications.
The application of Models-3 in national policy Samantha Baker Air and Environment Quality Division, Defra.
© 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
RSPA/Volpe Center Arrival/Departure Capacity Tradeoff Optimization: a Case Study at the St. Louis Lambert International Airport (STL) Dr. Eugene P. Gilbo.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
COmbining Probable TRAjectories — COPTRA
A Multi-Airport Dynamic Network Flow Model with Capacity Uncertainty
Nonlinear Programming Prepared by Lee Revere and John Large
Surface Observations for an Operator
Weather Information for Pilots
ADVANTAGES OF SIMULATION
GIS Day Site Layout Optimization Using GIS Sulyn Gomez Mohd Samrah
Airport engineering.
The air traffic controller’s perspective on runway excursion hazards and mitigation options Session 3 Presentation 1.
ICAO Air Navigation Bureau
Pilot considerations and pilot solutions
Meeting of the Strategic Development Group Brussels, 3 July 2008
The air traffic controller’s perspective on runway excursion hazards and mitigation options Session 2 Presentation 3.
Uncertainty-driven Ensemble Forecasting of QoS in Software Defined Networks Kostas Kolomvatsos1, Christos Anagnostopoulos2, Angelos Marnerides3, Qiang.
Presentation transcript:

„ Fuzzy Expert” System for Determination of Runways in Use Case Study: Zurich Airport Fedja Netjasov University of Belgrade Faculty of Traffic and Transport Engineering Division of Airports and Air Traffic Safety

Airport Traffic Control Tasks Monitoring of departing and arriving traffic at the airport with aim of securing: - safe, - accurate and - expeditious traffic. This is obligation of Air Traffic Controllers who are located in the Airport Control Tower.

Airport Traffic Controller Duties Most important ones are: Airport Traffic Monitoring (directly through the window or by binoculars); Radio Comunication with aircraft pilots and ground handlung personal; Determination of runway(s) in use.

Determination of runways in use Problem definition For the case of multiple runways: depending on meteorological conditions and planned traffic demand, airport traffic controller determine the runways in use trying to “maximize” utilization of available airport capacity and “minimize” the noise level.

Problem nature Real Time Combinatorial Problem; Large number of feasible combination of runways; Large number of operational constraints; Conflicting Goals; Decision making process is dependant of controller’s subjective judgments.

Reasons for development of “fuzzy expert” model Usage of input data in different form (linguistic, quantitative); Individual differences between controllers (personal experience, age, personality, etc.); Better satisfaction of given criteria (maximization of capacity, minimization of noise level, etc.);

Conceptual model for determination of runway in use Determination of meteorological conditions on the basis of visibility and ceiling; Determination of operational concept in use on the basis of meteorological conditions, wind direction and runway condition; Aircraft assignment to runways in use on the basis of operational concept in use and estimated number of departures and arrivals

Fuzzy Model 1 Serves for the determination of meteorological conditions at a specific time using the fuzzy variable visibility and ceiling.

Fuzzy Model 1 (cont.) The output of the model is presented as fuzzy variables “preference of meteorological condition (VMC/MMC/IMC)”.

Fuzzy Model 2 Using fuzzy variables “planned hourly number of departures (arrivals)” and “absolute difference” determines the “estimated” number of departures and arrivals.

Fuzzy Model 2 (cont.)

Output from Fuzzy model 2 is presented as fuzzy variables “preference that number of departures (arrivals) is small/middle/large”.

Rule Base Based on results from Fuzzy Model 1 and 2, and using additional information on wind direction and runway conditions, as a result gives us the operational concept in use and distribution of traffic (by aircraft category) on runways in use.

A

Numerical example Meteorological data are: visibility – 3000 m; ceiling – 1100 ft; wind direction – 90 0 ; runway condition – wet. Traffic data planned for next hour are: planned number of departures - 29; planned number of arrivals - 11;

Concept A Concept B Concept C Concept D

Determination of meteorological condition VMC

Determination of number of departures MIDDLE

Determination of number of arrivals SMALL

Determination of final results

Conclusion and Further Research Developed model could serve for evaluation or for suggestion of decision; Model could be easily applied for any other airport; This is prototype of a model, so further verification and additional “fine tuning” is required.

University of Belgrade Faculty of Transport and Traffic Engineering Department of Air Transport Division of Airports and Air Traffic Safety Vojvode Stepe 305, Belgrade Serbia and Montenegro tel: fax: Thank you for your attention