CMS Tracker Week, CERN, 14-18 July 2003 17 July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.

Slides:



Advertisements
Similar presentations
CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
Advertisements

CMS Tracker Week, CERN, July July 2003Tracker Week - Bonding WGSalvatore Costa - Catania Bonding-DB Usage or lack thereof.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Module shoulders The purpose of this module is to arrange the shoulders in one and the same position, ready oriented to be put onto the mandrels. Shoulder.
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
ATLAS Module building at Glasgow
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 JD.Berst, U. Goerlach, CMS TRK APR 2003 Status of Hybrid Qualification and Tender Final Technical Specifications –Hybrid types –Quality control, intermediate.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
Potential Electrical Problems Tennant replaces lighting fittings on their own Tennant adds lighting point Tennant adds socket outlet point Tennant removes.
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
04 Dec 2001CMS Week - Bonding WGSalvatore Costa - Catania Writing Bonding Data into the CMS Tracker Construction Database Salvatore Costa University and.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
22 Oct 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status of Database Interface for Bonding Data Salvatore Costa University and INFN – Catania.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Pledged and delivered resources to ALICE Grid computing in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
Status Report on Bonding at Catania
Ladder Assembly All tools and jigs produced Glue dispensing works
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Bonding web site, renovated
Preproduction Status & Results
UCSB Hybrid Bonding & Testing
Executive summary from Bonding WG Meeting 21 Oct 2003
Unexpected Failures of Modules on Rods
Module Failures on RODs
Module production in Italy
Module Production in Brussels
Hybrid Status/Deliveries
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 15 July 2003 Salvatore Costa INFN Catania

17 July 2003Tracker Week - Module Production2 Salvatore Costa - Catania News New Coordinator Alan Honma  Salvatore Costa I take up administrative tasks Alan stays on as Technical Advisor New Center Hamburg

17 July 2003Tracker Week - Module Production3 Salvatore Costa - Catania Center activity updates/problem reports CenterActivities/Problems AachenVibration test on a R6 TEC Module  broken bonds as in US TOB Modules BariBonding 1 st “real-final” Mod, found problems at PA ends, not supported by spacer (Suggested solution  equip jig w/ extensions to slide under PA opposite edges) Catania1 machine out of 2 stopped working: looking into problem FermilabAcquired 3 rd machine dedicated to CMS. Previous problems bonding on TOB Pas solved by cleaning residues from pads, with alcohol and swabs FirenzeAlso difficulties bonding at PA ends (see Bari) PisaPull & Electrical Test results on Sensor Test Structures (see) Santa BarbaraBonded 19 TOB mod before machine had hw problem (fixed). Pad cleaning w/ citric acid solution, a technique Alan fears is dangerous long-term StrasbourgObserved bond lift-offs, due to jig vibrations. Done + Pull Test on Test Structures TorinoPull study of Bond Force vs. U/S Power on RMT Pas (see) ViennaBonded w/ no problems 1 “real-final” TEC module out of 4 recently received ZurichPull Tests on recently delivered PAs: excellent results on all 3 batches, including the one declared unbondable at other Centers. Bonded first alignment module.

17 July 2003Tracker Week - Module Production4 Salvatore Costa - Catania Bonding-DB Usage Statistics I/F (v.2.0) installed: Catania 4/14 –Locally (out-of-the-box) 6/14 –Locally (with mods) 2/14 _________________________ CENTERS OK: 12/14 –No info 2/14 DB-ok Modules bonded: –Yes 7/14 –don’t know 4/14 –No 3/14 Data in DB from 5 centers (19 Modules) Change to Bonding-DB I/F: remove requirement of Sensor data in DB

17 July 2003Tracker Week - Module Production5 Salvatore Costa - Catania PA Bonding Problems In recent bonding tests of the RMT pitch adapters, Alan encountered –batches that fail the bonding tests AND –batches with significant large variations in bonding quality (from PA to PA and even within a PA) such that there were both passing and failing tests within the same batch. This means a sample test of a batch is not sufficient to identify problematic batches (which is what they have been doing so far). “I am no longer confident that those batches that "passed" in our single sample tests are necessarily good”. However, the Zurich Delvotec 6300 bonding machines which are at CERN Prevessin could easily bond every PA with no problems using their standard parameters. Then Alan was able, after a lot of searching, to find a set of bonding parameters which yielded good enough results to pass the bond pull tests. However, these parameters are very far from standard set and it is not clear if they are really safe ones to use in the long term. 5

17 July 2003Tracker Week - Module Production6 Salvatore Costa - Catania Attacking the problem Difference in bondability between CERN and Zurich machines might be due to the frequency of the ultrasonic generator. –Zurich Delvotec 6300's: 60KHz –CERN Delvotec 6400's (as well as all other 6400's in CMS): 100KHz Small batches of RMT PAs sent out/distributed yesterday to some centers, to extensively test them on individual machines –pull test w/ “standard parameters” –search of “optimal parameters’ –correlate w/ machine frequency Possible replacement of ultrasonic generator (and in some cases also transducer) in “faster” machines is being considered. (Cost ~15 kCHF)

17 July 2003Tracker Week - Module Production7 Salvatore Costa - Catania Changes to Bonding Procedure PA problems call for more extensive bond pull testing. Existing procedure already calls only for ~10 test bonds on every PA prior to regular bonding, but it is not really ‘enforced’ in that results are not to be recorded into DB:  Add bond test data on PA to Bonding Tables in DB  Include destructive bond pull test on the real thing, that is the PA- Sensor and Sensor-Sensor bonds on modules, 1 every 50th wire). Then these bonds have do be redone  Add the above pull test data to Bonding Tables in DB At the moment we do not envision this as a permanent test procedure, but only for the startup (first ~20 Modules per Center) and will be reduced to a sampling test or stopped altogether if found not to be needed.  I will gather results of the above pull tests from DB and report them to future Module Production meetings as part of the QA of the module bonding. Centers that do not report (satisfactory) results will not be considered “ready” for production.

17 July 2003Tracker Week - Module Production8 Salvatore Costa - Catania Breakage in TOB modules Drop tests carried out at UCSB.  A short or complete glue line between PA and Sensor did provide protection against shock breakage. Three modules have been sent to CERN without and with this additional glue.  None damaged. A vibration test of TOB modules with and without additional glue was performed in Aachen.  Improved resistance to breakage of the modules with additional glue. Will have to investigate  Minimum amount of glue needed to ensure protection  How the addition glue will modify module thermal characteristics.