By Sacha Mkheidze & Aaron Hebert

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Session 7 Outline What needs to be tracked or collected? Whats available to aid with program tracking/reporting? Does data collection format make a difference?
Session 1 Outline Overview of Phase II What is expected? What should we be doing today? What are others doing? Suggested steps to move your program forward.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
Phase II Municipal Separate Storm Sewer System (MS4) Permits Patricia Foran & Cindy Hooper Storm Water & Pretreatment Team.
 Map the MS4 conveyances  Locate all outfalls  Conduct dry weather screening of outfalls  Develop & enforce an Illicit Discharge Ordinance in the.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Ohio Department of Transportation SWMP Challenges and Responses.
Stormwater Management/ MS4 Permitting International Municipal Lawyers Association 2014 Annual Conference Baltimore, Maryland Gene Tanaka
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Update on Stormwater Regulation
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Spokane River Forum Conference March 26,  About 1/3 of City  130 outfalls.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Building a Comprehensive IDDE Program Scottie Ferguson Trevor Gauron Doyle Allen SCASM Meeting May 8, 2007 BUILDING A COMPREHENSIVE ILLICT DISCHARGE ELIMINATION.
Outfall Reconnaissance Monitoring The why and how of testing direct sources into watersheds … Chris Jones, Richard Dewitt, & Leslie Schick.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
Presenter: Karen Fligger, EPA. Stormwater Generated by runoff from land and impervious surfaces such as paved streets, parking lots, and building rooftops.
Implementing the Municipal Separate Storm Sewer System Permit Stormwater Division General Services Department Board of Supervisors Work Session October.
Utility Mapping Water-Sanitary-Storm City of Wausau.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
Introduction to MS4 Stormwater Requirements (2009)
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
MDOT Storm Water Management Plan Module 1: Introduction to Storm Water Management Together… Better Roads, Cleaner Streams.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
MDOT Storm Water Management Plan Module 4: Illicit Discharge Elimination Program Together… Better Roads, Cleaner Streams.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Center for Water Resource Studies - WKU Field Operations Unit Alanna Storey.
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
An Overview of our Community’s Stormwater Management Program
EPA Storm Water Run Off Review and Reading Assignments.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Public Workshop: RIPDES Draft Phase II Storm Water Regulations RI Department of Environmental Management RIPDES Storm Water Program July 25, 2001 Contacts:
Training Approach and Expectations 2/6/20161 Training Approach and What to Expect.
Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.
Storm Sewer Map Development Presented by: Kurt Whited.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
MS4 IDDE Training For City Field Staff Tuesday, January 30th 2018
MS4 = Municipal Separated Storm Sewer System
Presentation transcript:

By Sacha Mkheidze & Aaron Hebert MS4 Mapping By Sacha Mkheidze & Aaron Hebert

What is an MS4? And what does it do? Municipal Separate Storm Sewer System. A series of interconnected stormwater features that collect and transport stormwater from communities to the waterways.

How and why are MS4’s mapped Phase I, issued in 1990, requires medium and large cities or certain counties with populations of 100,000 or more to obtain NPDES permit coverage for their stormwater discharges. Phase II, issued in 1999, requires regulated small MS4s in urbanized areas, as well as small MS4s outside the urbanized areas that are designated by the permitting authority, to obtain NPDES permit coverage for their stormwater discharges. MS4’s are mapped in two ways: From plans (as builds) Field verification

Plans Plans Typically Include: Limitations of plans: Catch basin information such as location, depth and flow direction. Pipe information including size, depth, materials and flow direction. Limitations of plans: They may be difficult to track down and obtain. They may not represent the truth on the ground.

Plans Plans Typically Include: Limitations of plans: Catch basin information such as location, depth and flow direction. Pipe information including size, depth, materials and flow direction. Limitations of plans: They may be difficult to track down and obtain. They may not represent the truth on the ground.

Field verification How the data is collected GPS data loggers are utilized to collect information for each specific feature. Catch basins (CB), manhole, MS4 outfall, pipe inlet, crossover outlet, point generic, septic system and BMP’s. Each feature has specific measurements that are collected (size, depth and flow direction). Collected data is downloaded and processed, quality checked and then turned over to county engineer.

Benefits of field verification Very accurate data. Relatively easy to obtain. Can pick up any problem areas within the system (illicit discharges, excessive trash, failing structures and blockages). A more complete picture of the MS4.

Before and after field verification Lincoln Park MS4 based on field verification Lincoln Park MS4 (County data) Lincoln Park, Prairie Township in Franklin County Ohio

What happens next? Data is entered into GIS. Data is quality checked. Data is given to County Engineer.

Questions?