Case Study #2: Landscape Ice Road Suitability Assessment NSDSS Workshop 4 September 19-20, 2012 Fairbanks & Anchorage, Alaska.

Slides:



Advertisements
Similar presentations
Report on the activities of the Digital Soil Mapping Working Group Endre Dobos.
Advertisements

December 5, 2011 Presented by: Sue DAgnese Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS TV Highway at 185th Ave.
Final Workshop September 20, 2012 Anchorage, Alaska.
Salt Marsh Restoration Site Selection Tool An Example Application: Ranking Potential Salt Marsh Restoration Sites Using Social and Environmental Factors.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 Riverside County - Orange County.
5.7 Scale Drawings and Models
3 rd Stakeholder Workshop April 27-28, 2011 Fairbanks, Alaska.
Hardin County Engineering Department September 12, 2006.
1/40 Surface Water Hydrology at White River Lake, Texas Presented by Shane Walker May 3, 2005 CE 392K.2 – Hydrology.
What is a contour map and how do I read it??
What is this? A flat map showing the elevation for one hill.
Trimble  Quantm  Haul Road Optimization Presenters Name.
The Power of Information: Rating and Disclosing Building Energy Performance Alexandra Sullivan US EPA, ENERGY STAR December 2, 2009.
> >
The Working Waterfront: A Baseline GIS Inventory of Water Dependent Businesses in South Mobile County Introduction The Mobile metropolitan area is experiencing.
Estimating the Population Size of Razor Clams Using a Model Assisted Sampling Design and Analysis Babineau, D. and Schwarz, C. Department of Mathematics.
Ratios & Unit Rates 6-1.
TOPOGRAPHIC MAPS A NEW WAY TO VIEW THE WORLD!. A topographic map, simply put, is a two-dimensional representation of a portion of the three- dimensional.
TOPOGRAPHIC MAP.
North Slope Decision Support System: Ice Road Planning Algorithms 3 rd Stakeholder Workshop April 27-28, 2011.
Regional Integrated Assessment Modeling: Assessing Opportunities and Vulnerabilities in a Rapidly Evolving U.S. Natural Gas Industry Principal Investigators:
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Illiana/ TRB | 1 Use of Technology for Public Involvement for the Illiana Corridor Study May 6, 2013.
Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.
Cryosphere hazards from the perspective of a State Agency Gabriel Wolken Alaska Division of Geological & Geophysical Surveys 3354 College Road, Fairbanks,
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
HONR 297 Environmental Models
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
Mark Edwards, Senior Advisor, Planning and Investment, NZ Transport Agency SNUG Napier 2013 The Network Operating Framework (NOF)
< This document is contained within the Visitor Use Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of.
Teacher Page I. Scientific Inquiry, A. Processes of Scientific Inquiry Missouri science standards 1.4, 1.5, 1.6, 1.7, 1.8, 2.1, 2.7 7th grade science MAP.
North Slope Decision Support System First Stakeholder Workshop January 20-21, 2009 Anchorage, Alaska.
Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.
Safety management software for state and local highway agencies: –Improves identification and programming of site- specific highway safety improvements.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
The ____________________ Branch by: _____________________________________ per: _________ 1.What are the parts of this branch? 2. How are the members of.
Today’s presentation Objectives of the LAC Good relations – does co-existence really exist? Land Access Rules – some extra protections Summary Recommendations.
Mapping Visitor Expenditures: Preliminary Data from AVSP IV Steve Colt, Institute of Social and Economic Research Forest Service Recreation Workshop Anchorage.
By: Wesley Harris. Road map Shows roadways and physical boundaries. It is a good way to find your way a unfamiliar place.
RECONSTRUCTION OF County Route 1, Golden Shores Pkwy & Oatman Highway Public Information Meeting Golden Shores Senior Center Tuesday, June 3, 2015.
North Slope Decision Support System Requirements & Specifications November 9, 2009 Fairbanks, Alaska.
Fall 2002Biostat Statistical Inference - Proportions One sample Confidence intervals Hypothesis tests Two Sample Confidence intervals Hypothesis.
Iron Ore Holdings Ltd Buckland Project & Northern Quoll: adaptive mine design and management 30 July
MyOcean2 WP4.4 ACTIVITIES UPDATE MyO2 ANNUAL REVIEW,CORK, 16 APRIL 2013.
Forest Management and Water – A Risk Based Approach.
NOAA Climate Goal/Climate Program Arctic Workshop Meeting February 2-3, 2005 John Jensen National Climatic Data Center.
Climate Change Response Framework projects Presentation to the Forest Community Vulnerability and Adaptive Capacity in the Context of Climate Change Workshop.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved.Copyright © 2010 Pearson Education Section 9-4 Inferences from Matched.
Essential Question: What is a rational exponent and how do you simplify an expression that has one? Assessment: Students will demonstrate verbally in a.
Density 7 th Grade Integrated Science. Density Demos -Soda Pop Drop -Yogurt containers -Beakers with marbles/cottonballs -Styrofoam Cup -Packing Peanuts.
Freeway Planning Process Michelle Bitner Project Manager Kern Council of Governments.
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 201 Data Available for Map 3 Data available on corridor level.
MCE: Criteria Development and the Boolean Approach Exercise 2-7.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Effective Chiropractic 9001 Jewel Lake Rd #3 Anchorage, Alaska Ph: Chiropractor in Anchorage.
Individual Introduction Neal Johnson Fairbanks, Alaska.
Interim Stations Review
Boston Austin Blackmon, Chief of Environment, Energy, and Open Space, City of Boston.
Tides: Think-Pair-Share Assessment Best procedures: read quietly to yourself (so you don’t give any subconscious clues) As the instructor, we read it.
spacegrant.colorado.edu/studentsat
Renewing our Energy Choices Lesson 2
Human Environment Interaction
White River and Richland Creek Watershed Opportunity Assessment
What other questions do I need to ask about this picture?
Ask Yourself This: Q: Whose roads are these? NCDOT
Action: RG b -Theft of gas Workshop
Presentation transcript:

Case Study #2: Landscape Ice Road Suitability Assessment NSDSS Workshop 4 September 19-20, 2012 Fairbanks & Anchorage, Alaska

Motivation for the Case Study NSDSS Workshop #3  Held in Fairbanks, April 2011  Attendees asked for promising case studies to demonstrate effectiveness and needs for improvement  Among the suggestions: Possibility of ice road construction off of potential permanent roads  Potential road to Umiat is good example  Key questions:  Is there water available for ice road construction?  Would cost be feasible?  Can we compare route alternatives versus each other?

Basic Assessment Concept Since we don’t know all the details, keep it simple Plan regular spurs off of main road at regular intervals Do basic Ice Road Planning procedure for each spur (Sullivan 2007)

Case Illustration Hypothetical road: Dalton Hwy – Kavik Camp – Coast ~47 mi; “Lake-rich” at ends, “Lake-poor” in middle

Case Illustration Suitability analysis: Ice road start points at 50,000 ft spacing Each ice road 25,000 ft long Lakes identified along corridor

Case Illustration Tool batch processes 10 ice road routes and displays properties of lowest cost routes for each road.

Case Illustration Water haul distance changes dramatically along gravel road mi mi mi mi ~5 mi