Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.

Slides:



Advertisements
Similar presentations
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Advertisements

Vibration issues for SuperKEKB M. Masuzawa, R. Sugahara and H. Yamaoka (KEK) Vibration issues for SuperKEKB (IWAA2010)
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Impact of random and determinist acoustic noise on vibrations at high frequencies.
SIMPLIFIED MODELS OF ILD AND SID DETECTORS: SIMULATIONS AND SCALED TEST ULB: Christophe Collette, David Tschilumba, Lionel SLAC: Marco.
ILC Tech Meeting, March 29 th 2007 Cold quadrupole vibration measurements on Module 6 during the 10 th /11th thermal cycles at CMTB Ramila Amirikas, Alessandro.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
QD0 stabilisation update (since last update in MDI) A.Jeremie A.Badel, B.Caron, R.LeBreton, J.Lottin, J.Allibe, G.Balik, J.P.Baud, L.Brunetti, G.Deleglise.
Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke,
Introduction to seismic sensors (subject 3.2) Peter Novotny PACMAN meeting, CERN, 7 October 2014.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Catherine ADLOFF Andrea JEREMIE Jacques LOTTIN Benoît BOLZON Yannis KARYOTAKIS.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
Update of the ground motion generator of A. Seryi for ATF2 thanks to ground motion measurements in the ATF2 beam line 1 Benoît BOLZONATF2 software task.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
IPBSM status and plan ATF project meeting M.Oroku.
A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Some information on the Stacis 2000 Table from CERN, currently in Annecy B.Bolzon,
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
BPM support and beam pipe length FD support status A.Jeremie.
Behavior of an inverted pendulum in the Kamioka mine R. Takahashi (NAOJ), A. Takamori (ERI), E. Majorana (INFN) GWADW 2010 We are investigating behavior.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
NLC - The Next Linear Collider Project Mike Woods May 1999 Vibrations and the NLC IR Welcome to the NanoWorld !
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
How high frequency we care if we need the stabilization of 1nm level?
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Ground motion studies at ATF2 June 11, 2014 Orbit jitter source identification via ground motion studies at ATF2 (Results of the June run) Marcin Patecki,
1 KEK Hiroshi Yamaoka Vibration analysis of the ILD QD0-support system Oct, 2 nd '09 KEK H. Yamaoka - Results of Vibration analysis - Coherency measurement.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
CARE05 – November Status report on active stabilisation of a linear collider final focus quadrupole mock-up J. Lottin, ESIA
Alignment and stability session
Summary FD Support System
Vibration issues at Linear Colliders:
Seismic motion analysis of the SuperB site of Frascati
EuroTeV WP7 activities in DESY
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Topics on Vibration Issues
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
A.Jeremie, B.Bolzon, N.Geffroy
IP configuration session
Presentation transcript:

Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08

Introduction To have only 2% error on the beam size measurements at the IP, tolerance of vertical relative motion above 0.1Hz between:  Shintake Monitor and QF1: 20nm  Shintake Monitor and QD0: 7nm Tolerances are less strict if QD0 and QF1 move in the same way Tolerances are about 0.5µm in direction perpendicular to the beam and 10µm in direction parallel to the beam 2 sources of excitation which can make final doublets vibrate:  Ground motion: amplitude depends on time (coherence does not)  Cooling water: flow already specified for ATF2 final doublets

3) Measurements of vibrations only due to ground motion between:  [QD0; QF1] and the floor (LAPP team responsable for support)  QD0 and QF1  Shintake and the floor (Shintake team responsable for support )  Shintake and [QD0; QF1] 4) Vibration measurements between [QD0; QF1] and their support with flowing cooling water Plan of my presentation 2) Ground motion measurements during 72 hours (week-end and one day of the week) to analyse the evolution of amplitude with time 5) Conclusion on the tolerance achievement 1) Instrumentation used for vibration measurements

1) Sensors used for vibration measurements

ModelCMG-40T86MG-102S ManufacturerGuralp SystemsEndevcoTOKKYO KIKI Sensor TypeGeophoneAccelerometer Frequency range[0.03; 50] Hz[0.01; 100] Hz[0.1; 400] Hz Direction3-directionvertical only1-direction each In order to measure vibrations in the 3 directions from 0.1Hz to 100Hz, 3 models of vibration sensors were needed: In fact, because of sensor noise, ground motion can be measured:  From about 0.2Hz to 50Hz with geophones  From few Hz (1Hz: ATF / 10Hz: LAPP) to 100Hz with accelerometers  GURALP data: from about 0.2Hz to 50Hz in X, Y, Z direction  ENDEVCO data: from few Hz to 100Hz in vertical direction  MG-102S data: from few Hz to 100Hz in X, Y, Z (only used in part 3) LAPP sensors Sugahara sensors

2) Ground motion measurements at ATF2 during 72 hours

Introduction FFT parameters:  Window: Hanning  Overlap: 66.67%  Frequency resolution: 0.016Hz  Time resolution: 1 hour  Averaging: Exponential (2*Tau=1216s) and 195 averages Vibration sensors used:  Guralp geophones from 0.2Hz to 50Hz in X, Y, Z direction  ENDEVCO sensors from 50Hz to 100Hz in vertical direction Ground motion measurements done during 72 hours non-stop  Near the final doublets  From Friday 11/12/08 at 4:00 to Monday 14/12/08 at 4:00

Z direction: from 200nm to 470nm Z direction: from 5nm to 30nm Very big peak up to 100nm when people working around Earth motion (Natural) Cultural noise (Human) Y direction: around 15nm X direction: from 8nm to 20nm X and Y direction: from 420nm to 1100nm! X Y Z X Y Z  Need to measure relative motion between Shintake Monitor and [QD0; QF1] during a very long time

3) Measurements of vibrations only due to ground motion between: [QD0; QF1] and the floor Shintake Monitor and the floor QD0 and QF1 Shintake Monitor and [QD0; QF1] Final doublets and Shintake Monitor with their supports at ATF2 Measurements with Shintake Group (T. Yamanaka et al.)

Introduction Vibration sensors used:  Guralp geophones from 0.2Hz to 13Hz in X, Y, Z axes  MG-102S accelerometers from 13Hz to 100Hz in X, Y, Z axes  ENDEVCO accelerometers from 13Hz to 100Hz in vertical axe FFT parameters:  Window: Hanning  Frequency resolution: 0.016Hz  Averaging: Linear, 50 averages, 66.67% overlap Contribution of Shintake team and Sugahara sensors (MG102S) Integrated RMS of relative motion:

Measurements between [QD0; QF1] and the floor Transfer function magnitude Almost the same for QD0 and QF1 Totally flat below 10 Hz In horizontal directions: first resonance around 20 Hz In vertical direction: only one resonance at 66Hz QD0QF1

Coherence Almost the same for QD0 and QF1 Equal to one below 10Hz In horizontal directions: decrease above 10Hz In vertical directions: very good up to 80Hz QD0 QF1 Measurements between [QD0; QF1] and the floor

Integrated RMS of relative motion 13 Almost the same for QD0 and QF1 Almost flat below 10Hz In horizontal directions: 20-30nm due to the resonance at 20Hz In vertical direction: only 1nm due to the resonance at 66Hz  Final doublet supports of LAPP team validated on site QD0 QF1 Measurements between [QD0; QF1] and the floor

Measurements between QD0 and QF1 Transfer function Totally flat below 10Hz Y: QD0 and QF1 1st resonance (not exactly at the same frequency) Z and X: no 1st quad resonance (exactly at the same frequency) X Y Z Y Z X Equal to 0 below 10Hz Y: high from 1st quad resonance (>10Hz) X: high from 2 nd quad resonance (>50Hz) Z: good up to 60Hz  QDO and QF1 motion in phase in vertical direction and in direction perpendicular to the beam MagnitudePhase

Measurements between Shintake and the floor Electron Beam Vibration measurements done on the top the vertical table The electron beam passes through the center of the table Since the laser interferometer optics is constructed on the whole area of the vertical table, vibrations are not overestimated Shintake monitor vertical table Experimental set-up

Vibratory behavior of the mechanical support Totally flat below 10Hz Resonance around 50Hz In horizontal directions: equal to one below 10Hz and decrease above Very flat up to 40Hz in vertical direction In vertical direction: equal to one up to 60Hz Transfer function magnitude Coherence Measurements between Shintake and the floor

Integrated RMS of relative motion  Shintake Monitor supports of Shintake team validated on site Measurements between Shintake and the floor Almost flat below 10Hz Large around 50Hz due to the resonance Increase below 0.5Hz due to the low S/N Ratio and not to motion

Measurements between Shintake and [QD0; QF1] Transfer function magnitude QD0QF1 Almost the same for QD0 and QF1 Totally flat below 10 Hz Decrease around 20Hz in horizontal directions and around 70Hz in vertical direction because of final doublet resonance Increase around 50Hz in horizontal directions because of Shintake table resonance and above 50Hz because of final doublet antiresonance

Coherence QD0 QF1 Measurements between Shintake and [QD0; QF1] Equal to one below 10 Hz in all directions Small decrease above 30Hz and big decrease above 50Hz in vertical direction Equal to one below 10 Hz in horizontal directions Small decrease above 4Hz and big decrease above 10Hz in vertical direction Difference due to the longer distance from the IP

Integrated RMS of relative motion QD0QF1 Measurements between Shintake and [QD0; QF1]  Within tolerances with ground motion as only source of vibrations Almost the same for QD0 and QF1 Very small in vertical direction Quite the same level for the two horizontal directions Increase above 50Hz mainly comes from Shintake Monitor Increase around 20Hz comes from final doublets

4) Vibration measurements between [QD0; QF1] and the table with flowing cooling water Stationary study of cooling water vibrations  Temporal data analysis  3D frequency analysis 2D frequency analysis Set-up done at LAPP at the end of July 2008 (same than the one at ATF2 now)

Introduction Stationary study of cooling water vibrations  Temporal analysis (GURALP: 0.2~50Hz and ENDEVCO: 10~100Hz) Water flow twice higher than specified (20 l/min instead of 9.3l/min) 2D frequency analysis (Guralp: 0.2~13Hz and ENDEVCO : 13~100Hz)  Frequency resolution: 0.016Hz  Window: Hanning  Averaging: Linear, 50 averages, 66.67% overlap Stationary checked  3D frequency analysis (ENDEVCO:10~100Hz) Window: Hanning Frequency resolution: 2Hz Time resolution: 1s (configured size of the multibuffer) Averaging: Exponential (2*Tau=1.167s), 5 averages, 66.67% overlap

Stationary study of cooling water vibrations Temporal vibrations of QD0, QF1 and of the table GURALP sensors (0.2Hz – 50Hz)  No vibration increase and no shocks observed with cooling water ENDEVCO sensors (10Hz – 100Hz) Stationary of ground motion checked to compare with/without water 23 QD0 QF1

3D transfer function between [QD0; QF1] and the table For QD0 and QF1, almost the same vibratory behavior QD0 QF1 With cooling water, very low random vibrations above 70Hz Stationary of these random vibrations 24 Stationary study of cooling water vibrations

QD0 and QF1: Almost the same vibratory behavior with and without cooling water 2D Frequency analysis in [O.1; 100] Hz range  Quadrupole relative motion due to cooling water << 0.1nm Magnitude Phase 25 Moreover, flow twice higher than specified Transfer function between [QD0; QF1] and the table

5) Conclusion on the tolerance achievement

ToleranceMeasurement (between QD0) Measurement (between QF1) Vertical7 nm (for QD0) 20 nm (for QF1) 4.8 nm6.3 nm Perpendicular to the beam ~ 500 nm30.7 nm30.6 nm Parallel to the beam ~ 10,000 nm36.5 nm27.1 nm Flowing water: no impact on [QD0; QF1] relative motion to the floor In horizontal directions, vibrations are well below tolerances In vertical direction, tolerances are stricter but vibrations are still within tolerances Future prospects: check that vibrations are still within tolerances with higher ground motion With ground motion, relative motion of Shintake to [QD0; QF1]: