Negotiating Wind Park Easements and Analyzing Comparable Sales presented by Justin Bierschwale Bierschwale Appraisals PO Box 154 517 College Street Junction,

Slides:



Advertisements
Similar presentations
Financing Wind Transactions Financing Wind Power The Future of Energy IPED Conference July 25-27, 2007.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
GLENARM POWER PLANT REPOWERING PROJECT WORKSHOP
Farmland Values and Leasing Key Questions Chapter 20 §What determines the value of farmland? §What are the advantages and disadvantages of owning vs. leasing?
Tax Credits Vs. Cash Grants In Renewable Energy Deals Speakers Anita Molino – Bostonia Partners LLC Tony Grappone – Novogradac & Company LLP Moderator.
SkyPower Corp. PRESENTATION.
EverPower Eastern Projects Buckeye Wind Project Champaign & Logan Counties, Ohio 100 MW Highland Wind Project Krayn, Pennsylvania 115 MW The Allegany.
1 NEDPower Mount Storm Wind Farm Project Update 10/20/2009.
Financing Renewable Energy Projects: Issues and Opportunities Peter Y. Flynn Bostonia Partners July, 2013.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Wind Turbine Lease Education Program Ron Haugen Project Director North Dakota State University Extension Service 6/11/2015 Extension Risk Management Education.
Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.
1 Renewable Energy in the Northwest: Wind Energy Presented By Stephen C. Hall STOEL RIVES LLP Journal of Environmental Law and Litigation Symposium University.
Energizing Michigan Energizing Michigan WIND ENERGY EDUCATIONAL PROGRAM FOR FARMERS AND LANDOWNERS Professor Stephen B. Harsh Department of Agricultural.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
The Wind Energy Center at UMASS University of Massachusetts Patrick Quinlan Associate Director UMass Wind Energy Center Amherst, Massachusetts Site Considerations:
Scandia Wind Southwest LLC Development of large scale windpower Presentation for landowners Bovina May 8th 2009.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
Farm Leasing Basics ASAP Business of Farming Conference, February 22, 2014 Eric Mine – Land Loss Prevention Project All Rights Reserved Eric Mine,
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Wind Power– Can it make sense in Michigan ? Tom Hewson Energy Ventures Analysis Inc Arlington Virginia March 2003.
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
Daniel C. Shapiro & Jessica M. Schramm August 30, 2011 APA Presentation.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Small Farm Profitability: Is Wind Energy the Answer? 1
Wind Turbine Lease Considerations for Landowners Dwight Aakre Ron Haugen February 2010.
Oil and Wind Energy: North Dakota Update Dr. Cole Gustafson Feb. 9, 2011.
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Capacity Factor Summary 1. Note: Figure only includes the 20 countries with the most installed wind capacity at the end of 2007 Wind as a Percentage of.
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
LAND AGREEMENTS Presented to: BLM WEATS (1) Hackstaff Gessler LLC Hackstaff Gessler LLC (2) 1601 Blake Street, Suite 310 Denver, CO www.hackstaffgessler.com.
Fossil Gulch Wind Park Presented By Jeff Duff Vice President, Airstreams LLC Welcome.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois A Strong Beginning for Illinois Wind Robert Nagel
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
[Legislative] [American policy] Passing of the Public Utility Regulatory Policies Act (PURPA) in Introduced competition within the supply sector.
Overcoming Barriers Expanding the Market for Small Wind Energy Systems Small Wind 102: Economics Making the numbers work Small Wind 103: Siting Issues.
DATA COLLECTION AND ANALYSIS n GENERAL DATA: SOCIAL CONSIDERATIONS n POPULATION CHARACTERISTICS SUCH AS AGE, FAMILY SIZE, HOUSEHOLD INCOME, ETC. n PRESENCE.
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
Article #3 New York Windmills Setbacks: Minimum distance from residence for construction of turbines. Determined locally – community, county, state. Typical.
ISAC Fall School November 30, 2012 Iowa’s Wind Energy Industry & Economic Impact.
Wind Energy Update Larry Flowers National Renewable Energy Laboratory November 30, 2007 Salt Lake City, UT.
DALLAS BAR ASSOCIATION ENERGY LAW SECTION REVIEW OF OIL & GAS LAW XXIII SEPTEMBER 11-12, 2008 Lisa Chavarria Stahl, Bernal & Davies, LLP Austin, Texas.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
©2011 Cengage Learning. Chapter 15 ©2011 Cengage Learning REQUIRED GOVERNMENT REPORTS.
Renewable Energy Project Analysis Course - Module 1
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
WHITE FLINT SECTOR PLAN Financial Analysis, Infrastructure Financing & Economic Benefits.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Engineering, Policy, Finance
E BDS Wind Energy Development Issues for Local Governments and Municipal Utilities Presented to: International City/County Managers Association.
Every state in the nation benefits from wind energy.
Presented to ABA RADER Committee/Columbia Law School's Environmental Law Society Symposium INTRODUCTION TO RENEWABLE ENERGY DEVELOPMENT Becky.
E.I. Konstantinidis, D.G. Kompolias and P.N. Botsaris Democritus University of Thrace School of Engineering Department of Production Engineering & Management.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Planning and Realisation of Wind Farms
Wind Energy in Iowa Lori McDaniel
Community Wind Development
Presentation to the Enron Corp. Finance Committee
Engineering, Policy, Finance
Renewable Energy Project Investments
Maryland Offshore Windfarm Project
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Negotiating Wind Park Easements and Analyzing Comparable Sales presented by Justin Bierschwale Bierschwale Appraisals PO Box College Street Junction, TX Ph (325) Terry Argotsinger Stalcup Ag Service, Inc. P O Box Flindt Drive Storm Lake, IA

Take a look from their perspective first

Wind Project Development Process Site Selection Land Agreements Wind Assessments Environmental Review Economic Modeling Interconnection Studies Permitting Sales Agreements Financing Turbine Procurement Construction Contracting Operations and Maintenance

Locating Wind Parks Power Grid Wind Velocity State and Federal Mandates (cap and trade) Tax incentives Power demand Will of the people

Mutual desire to make it compatible for everyone

Cost of Construction 1.5 MWh turbine Blades $300,000 Generator $1,250,000 Transportation $225,000 Tower $330,000 Materials $400,000 Labor $400,000 Engineering, Dev., etc $80,000 $3,000,000 / 1.5 Mwh = $2,000/Kwh RCN Deprec., O&M, Land rent, RE Tax – $60,000 Debt Service ?

Income Stream Electricity - $35 to $100 per Mwh at the hub Carbon Credits - $5 to $25 per mmt PTC/ITC/Direct payments - $.021 per Kwh Depreciation – 5 year equipment

Actual Production (1.5 MW Turbine) 4,000,000 Kwh x $.055/Kwh = $220,000 4,000,000 Kwh x $.021/Kwh PTC = $84, Mwh x 2,000 mmt CO2/Mwh x $15/mmt = $45,000 SO2, NOx – EPA clearing house for pollution credits (Meets Electricity needs for 300 people/year)

The Queue Federal Energy Regulatory Commission - FERC Independent Transmission System Operators - ISO $200,000 to $300,000 for permits Application Feasibility Study System Impact Study Facilities Study 459 to 884 days

Method of Negotiation Get legal advice Individually As a group Trustee, LLC – Combine wind rights into one package if rights can be separated under state code Option, Lease, Easement Privacy clause – Agreement and Memorandum

Key Terms of Agreement 3 phases Development – Construction - Operations Rates Site selection Insurance Re-powering Decommissioning Most Favored Nation

Development Phase 3 to 5 years State mandates with limits – 7 years $3 to $40 per acre per year

Construction Phase Usually less than one year One time payment Crop Damages Compaction Access Laydown areas Crane paths

Operations Phase 30 to 90 years Fixed Payments - $2,500 - $6,000 per MW CPI-U minimum 2% Royalty – individual tower 3,4,5 or 6% Royalty – prorated Fixed plus royalty Per acre plus royalty – 40/60 Renewable energy credits Carbon credits Roads, cables, buildings, substation

Site Selection Proposed plat Final plat Landowner approval The larger the turbine the fewer per farm 1.1 fall down distance – state code ? Setbacks from roads, dwellings

Insurance State code minimums $2,000,000 to $10,000,000 Adjust to inflation

Re-Powering okay but renegotiate

Decommissioning 5 feet 400 cu yds Performance bond for 1.5 x cost of removal 180 days

Most Favored Nation Same terms for all agreements Private negotiation - addendum

ELECTRIC TRANSMISSION SYSTEM OF TEXAS

FIRST WIND DEVELOPMENT

CONTINUED DEVELOPMENT

BOTTLENECK

DEVELOPERS AREN’T STUPID CURRENT DEVELOPMENT

DEVELOPERS AREN’T STUPID TIRED OF WAITING FOR EXPANSION FP&L PRIVATELY BUILT TRANSMISSION LINE

WHAT THE TRANSMISSION COMPANIES ARE SAYING $4.93 BILLION IN EXPANSION PROJECTS 2400 MILES OF NEW TRANSMISSION POTENTIAL FOR 18.5 GIGAWATTS IN NEW WIND POWER PROJECTS AEP & DUKE ENERGY – 240 MILES OF 765 KV TRANSMISSION LINES, EST. $1 BILLION COMING ONLINE WITHIN 8 YEARS

ONSITE DATA Anemometers Research Facilities Terrain Neighborhood Existing Turbines Data, Data, Data

Regulations Siting Visual & Noise Wildlife Impact Development Stages County Zoning? Safety? Synchronization with Power Grid Property Tax

Who All Gets Involved Wind Developer State Government Local Government Federal Agencies Community Groups & Activists Environmental Organizations & Activists General Public

BACK TO BASICS--6 FUNCTIONS OF $ Future Worth of $ Future Worth of $1.00 Per Period 3. Sinking Fund Factor 4. Present Worth of $ Present Worth of $1.00 Per Period 6. Annuity Worth of $1.00 TODAY

INTERNAL RATE OF RETURN RATE THAT SETS THE VALUE OF FUTURE CASH FLOWS EQUAL TO THE CURRENT VALUE 10.4% IRR???

SALE DETAILS 640 Acres Sale Price $1,581,257 Land Contributory Value: $2,000/Acre Residual Wind Lease Contribution: $301,257 Number of Turbines: 5 Lease Period at time of sale: Development

FINDING THE PIECES

CONSTRUCT THE TIMELINE

THINGS TO WATCH FOR

RENTS

Possible Expenses to Consider?

CALCULATE THE IRR IRR = 17.36%

SUBJECT DETAILS 320 ACRES ROYALTY PAYMENTS – SAME AS SALE TERMS – SAME AS SALE NUMBER OF TURBINES – 2 STAGE ON DATE OF APPRAISAL –DEVELOPMENT

CONSTRUCT THE TIMELINE

APPLY IT 17% IRR NPV = $131, ACRES X $2,500/ACRE = $800,000 + CV OF WIND LEASE: $131,000 TOTAL VALUE = $931,000

What Ifs: Justin’s Fuzzy Logic What if the Subject already had turbines producing and had 5 years of payment history? What if the Subject sat right next to an expanding wind farm but did not yet have a lease in place?

Things to Consider Make certain you have measured value as it contributes to the whole package, i.e. avoid flat out summation. –Extract Rates as they relate to contributory value, not as they stand separate and apart from the land. Extract and Apply in the exact same way. –If you include bonus payments in extraction, include them in application, etc. Step Away from the ledge at the end of the day and think through your conclusions. Are they logical?

QUESTIONS