Eastern Wind Integration and Transmission Study Overview January 28 th Webinar Dave Corbus National Wind Technology Center National Renewable Energy Lab.

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
På väg mot en elförsörjning baserad på enbart förnybar el i Sverige En studie om behov av reglerkraft och överföringskapacitet Version 4.0 Lennart Söder.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Queue Reform at the Midwest ISO NARUC February, 2008.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Michael Milligan, NREL (speaking for a large team at GE, 3TIER and NREL) Westconnect, Apr 21, 2009 Western Wind and Solar Integration Study Update.
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Eastern Wind Integration and Transmission Study
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Debra Lew NREL WestConnect Planning Meeting Western Wind and Solar Integration Study Update.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Production Cost Model Fundamentals
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
John Norden, Manager, Renewable Resource Integration ISO New England Inc NASUCA Mid-Year Meeting June 30, 2009 Roadmap to Renewable Integration in.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
Debra Lew, NREL (speaking for a large team at GE, 3TIER and NREL) UWIG Western Wind and Solar Integration Study Update.
Western Wind Integration Study May 23, Agenda 10:00am - Introductions 10:15 –Overview of study - NREL –Analysis to be conducted and examples of.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Integrating wind resources: siting decisions in the Midwest Julian Lamy (speaker) Ines Azevedo Paulina Jaramillo.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Dena Grid Study II Integration of Renewable Energy Sources in the German Power Supply System from with an Outlook to 2025 Jaakko Iivanainen.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Contents Introduction Focus area Wind scenarios
Wind Management at MISO
GSR022: Review of Security and Economy Required Transfer Conditions
ISO New England Net Load Analysis with High Penetration Distributed PV
Mid-Continent Area Power Pool
RE Grid Integration Study with India
Gordon van Welie, President & Chief Executive Officer
Presentation transcript:

Eastern Wind Integration and Transmission Study Overview January 28 th Webinar Dave Corbus National Wind Technology Center National Renewable Energy Lab

Eastern Wind Integration& Transmission Study Objectives Evaluate the power system impacts and transmission associated with increasing wind capacity to 20% and 30% of retail electric energy sales in the study area by 2024 ; Impacts include operating due to variability and uncertainty of wind; reliability Build upon prior wind integration studies and related technical work; Coordinate with JCSP and current regional power system study work; Produce meaningful, broadly supported results through a technically rigorous, inclusive study process.

Region Definition Study area includes: PJM Midwest ISO Mid-Continent Area Power Pool Southwest Power Pool TVA New York ISO ISO New England Other interested parties

Project Organization DOE Sponsor NREL Project Manager Technical Review Committee Stakeholders AWS Scientific Wind Modeling EnerNex Team EnerNex/MISO/Ventyx Project Team - Analysis

Key Issues & Questions include What system operational impacts and costs are imposed by wind generation variability and uncertainty? What are the benefits from long distance transmission that accesses multiple wind resources that are geographically diverse? What are the benefits from long distance transmission that move large quantities of remote wind energy to urban markets? How do remote wind resources compare to local wind resources?

Key Issues & Questions include How much does geographical diversity help reduce system variability and uncertainty? What is the role and value of wind forecasting? What benefit does balancing area cooperation or consolidation bring to wind variability and uncertainty management? How does wind generation capacity value affect reliability?

Joint Coordinated System Plan (JCSP) The 2007/2008 Joint Coordinated System plan included MISO, PJM, SPP,TVA, MAPP, NYISO,ISO-NE plus other interested parties The JCSP performed a long term planning study incorporating both economic (2024) and reliability (2018) analysis of system performance for the combined JCSP areas The EWITS uses some of the model assumptions including the generation expansion (EGEAS modeling) Final summary report in progress

Wind Integration Methods & Best Practices Capture system characteristics and response through operational simulations and modeling; Capture wind deployment scenario geographic diversity through synchronized weather simulation; Match with actual historic utility load and load forecasts; Use actual large wind plant power statistical data for short- term regulation and ramping; Examine wind variation in combination with load variations; Utilize wind forecasting best practice and combine wind forecast errors with load forecast errors; Examine actual costs independent of tariff design structure. Examine impacts of BA consolidation and fast markets.

Key Tasks- Eastern Wind Integration & Transmission Study Mesoscale modeling Transmission Study Integration Study

Key Tasks - Mesoscale Modeling –Identify wind sites –Develop high quality wind resource data sets for the wind integration study area Mesoscale modeling 3 years of time series data ( ) 10-minute data at 2 km spatial resolution –Develop wind power plant outputs

Mesoscale Grids

579 GWs of Wind Sites from Wind Site Selection process for EWITS

Offshore Wind Great resource Well correlated with load and close to load centers More expensive!

Deep Water Wind Turbine Development Current Technology

Supply v. CF

Size Distribution Maximum onshore plant sizes were normally distributed between 100 MW and 1000 MW Additional “mega” sites (>1000MW)

Power Conversion Testing Approach Power conversion takes into account –Turbine power curve for site IEC class –Air density, turbulence –Wake and non-wake losses –Time filtering to replicate the “spatial smoothing” of the output of a real wind plant Plant NameState Rated Capacity (MW) Turbine Type Hub Height (m) Blue Canyon IOklahoma74.25NM72 (1.65MW)67 m Lake BentonMinnesota103.5Zond m Storm Lake IIowa112.5Zond m Validation Sites

Validation Example Diurnal Patterns

Validation Example Mean Ramps

Mesoscale Output/ Power Conversion DATETIME80M SPEEDDIRECTIONDENSITYTKE ….

Why 20% and 30% Wind?

Regional Wind Requirements

Scenario Development and Siting Four Different Scenarios –Three 20% and one 30% wind scenarios Scenario that emphasizes development of local resources with lower capacity factors Scenario that emphasizes high capacity factor wind development in the Midwest with larger transmission component All of four scenarios require a lot of wind and transmission! –Some offshore wind required NREL/AWS provided 700 GWs of wind plants and wind sites for the scenarios were picked from these –Scenario sites were selected from the “Superset” of 700 GWs of sites

Four EWITS Scenarios Scenario 1, 20% wind penetration – “Lowest Cost Wind”: Utilizes high quality wind resources in the Great Plans, with other development in the east where good wind resources exist. Total capacity in MISO, MAPP, and SPP is approximately 185 GW Scenario 2, 20% wind penetration – “Hybrid, with Offshore”: Some wind generation in the Great Plains is moved east, with capacity increased in PJM, NYISO, and ISO-NE. Some offshore development in the Northeast and Mid- Atlantic.

Four EWITS Scenarios Scenario 3, 20% wind penetration – “Load-weighted Wind Development, Aggressive Offshore”: More wind is moved east toward load centers, necessitating even more utilization of off-shore resources. Scenario 4, 30% wind penetration – “Aggressive On- and Off-shore”. Meeting the 30% energy penetration level uses a substantial amount of the higher quality wind resource. Lots of offshore is needed to reach the target energy level, and the capacity in MISO, MAPP, and SPP goes back up to 188 GW.

EWITS Scenario Installed Wind Capacity by Region

20% wind Scenarios

30% Wind Scenario

Scenarios and Siting Things to keep in mind during the study How much capacity can be reasonably exported (imported) at each area? Assume constant energy between scenarios rather than constant number of plants: –Typical Great Plains capacity factor/Ohio C.F.= 45/30 = 1.5 –~Roughly 2 MW of wind in Great Plains produces the same energy as 3 MW of wind in Ohio.

EWITS Scenario 1 Generation Siting

EWITS Scenario 2 Generation Siting

EWITS Scenario 3 Generation Siting

EWITS Scenario 4 Generation Siting

Key Tasks- Develop Transmission Plan –JCSP reference future and 20% wind and 30% wind scenarios Builds on JCSP work –Analyze different transmission alternatives for different wind scenarios 765 AC and HVDC High in-state wind versus high wind exports

Develop Preliminary Transmission Plans Use JCSP 20% wind scenario transmission overlay as the starting point to develop initial plans for EWITS four scenarios Determine type, size and route of transmission lines Determine costs and land requirements Determine potential substation and DC terminal locations

Scenario 1 20% Lowest Cost Wind

Scenario 1 Constrained Case Annual Gen Weighted LMP

Scenario 1 Constrained Case Annual Load Weighted LMP

Scenario 1 Generation Difference: Copper Sheet Minus Constrained Cases

Scenario 1 Top 24 Interfaces with Largest Annual Energy Difference

Joint Coordinated System Plan Overlay – 20% Wind Scenario

4. Wind Integration Study Evaluate operating impacts –Regulation –Load Following –Unit Commitment Evaluate reliability impacts (ELCC/LOLP) EWITS is first and foremost a wind integration study –What are the integration costs and issues for 20 and 30% wind? –How is other generation affected?

Production Simulation Methodology  Case comparison approach –Actual wind vs. “ideal” wind –Objective is to determine relative value of two resources providing same amount of annual/daily energy  Issues –Approach is established as best way to accomplish objective –Not been attempted on this scale before

Hourly Modeling  Objective –Chronological simulation of operational planning and power system operation –Mimic Day-ahead unit commitment and scheduling based on load and wind generation forecasts Real-time operation with actual wind and load  How do we simulate the Eastern Interconnection in 2024? –Period-ahead planning (e.g. day-ahead unit commitment) –Real-time operations (at minimum of hourly granularity) –Operational structures Conventional control areas? Existing markets?

Hourly Modeling  PROMOD capabilities –Reserve modeling Types Treatment (e.g. variable by hour?) –Commit based on forecast, simulation based on actual quantities? –Features for treatment of uncertainty?  Modeling Transactions –Day-ahead and “real time” –Relevant program features

Intra-Hour Impacts  Objective –Determine operating reserves required to manage control area with wind generation –Feed requirements forward into hourly modeling  Variability of wind generation adds to existing variability, increasing requirements for RT ancillary services  Analytical approach –Based on high-resolution (< 10 min) load and wind generation data

LOLP and ELCC Analysis  Objective –Determine contribution of wind generation to Eastern Interconnection reliability –Assess reliability value of transmission only(?)  Issues –Transmission overlay could have significant impact on existing LOLE zones –Transmission will serve as capacity resources for some zones; may make some zones very reliable, such that ELCC of wind would be minimal  Predecessor tasks –Requires PROMOD to determine new area import limits –GE MARS model to be developed from PowerBase –Resource constraints may necessitate staging

Reliability Analysis  GE MARS –Monte-Carlo based chronological reliability simulation –Now in use at MISO  Objectives –Calculate ELCC for wind generation based on comparative LOLE cases –Zone-by-zone basis  Input data –Network, resource, and load data input developed from PowerBase –Wind as load modifier

Downloading EWITS Wind Data Download Time-series Data All data (using ftp site) EWITS ftp site (ftp://ftp2.nrel.gov/pub/ewits) Instructions for ftp Data for individual sites using interactive website EWITS Interactive Website Frequently-Asked Questions (FAQs) about time-series data EWITS FAQ

Downloading EWITS Wind Data EWITS Interactive Website / EWITS Interactive Website /

Eastern Wind Integration & Transmission Study Schedule Nov 07 – Feb 08Study Development March 2008Award Wind Mesoscale Modeling Contract July 2008Award Wind Integration Contract April – Oct 2008Develop Wind Data Sets Sept 08 – June 2009Evaluate Operating & Reliability Impacts; Develop Transmission Plan August 2009Complete Study

Your Input is Important! EWITS Website Suggestions on questions to address in study or other comments/input Contact Dave Corbus at ( ) or Matt Schuerger at