AFFORDABILITY Underground Cable costs 2-3 times more economical than overhead lines and pylons  EirGrid is misleading the public on statements to the.

Slides:



Advertisements
Similar presentations
4. First look Initial analysis of contrasting timeseries (Figure 2) shows: Shorter timescales have a smaller range of mass fluxes with lower maxima and.
Advertisements

Accounting and finance Budgeting and variance analysis.
Case Study: Experience of Bramford to Twinstead David Holland & John Foster Suffolk & Essex Amenity Groups.
Access Rights Workshop 17th March 2014
East West Interconnector Background Security Of Supply Promote Competition in The Electricity Sector Accommodate Growth Of Renewable Energy Reduce Dependence.
Understanding Electrical TransmissionDemonstration A1 A Guide to the National Grid Transmission Model Demonstration A1 How is electricity generated and.
Building of Research Team in the Field of Environmental Modeling and the Use of Geoinformation Systems with the Consequence in Participation in International.
Direct Government Payments and Agricultural Land Values: Alabama in Perspective Charles Barnard Economic Research Service The views expressed in this presentation.
The Impact of Changing Economic Conditions Since 2005 on the Forest Sector W. Brad Smith U.S. Forest Service Research & Development Washington, DC FIA.
The environmental impacts of renewable energy Prof. Luigi Toro Sapienza University of Rome Dept. Of Chemistry.
Agriculture in Norway Norsk Landbrukssamvirke. Norway 4.8 million inhabitants Part of Europe, but not member of the EU Agreement with the EU (EEA) – full.
Some electrical connection design issues for offshore wind farms Paul Gardner, Helen Snodin, & Nigel Scott Garrad Hassan and Partners
Economic Indicators. Concepts  Variables that provide information about the state of the economy.  Every economic indicator has a story to tell.  Need.
Farm Management Chapter 20 Land  Control and Use.
Robert Smith Statistics Canada October 20, 2010 Environmental and Socio- Economic Linkages – Drivers, Impacts, Adaptation and Instruments Discussants comments.
Scale and Distance.
Economic Impact Assessment of Occupational Safety & Health Legislation in Ireland “THE SUCCESSFUL WORK SAFELY AND HEALTHILY” November 2008.
Are High Tension Power Lines Necessary? JALEEL STERLING ASHLEY CARLONI DAVID BERNHART ELIZABETH ANDERSON.
Chapter 3 part II Data and Signals
Issues on Living Wages in the UK Stephen Machin March 2003.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Aswin Balasubramanian Imaya Senthilnathan
GOING NOWHERE FAST? Roy Samaan 14 March 2011 UP 206 A Effects of Service Reduction on Transit Quality.
WORKING PARTY ON NATIONAL ACCOUNTS Paris, 3-5 October 2007 Revisions in Quarterly GDP of OECD Countries: An Update Document STD/CSTAT/WPNA(2007)15 Richard.
Geo479/579: Geostatistics Ch13. Block Kriging. Block Estimate  Requirements An estimate of the average value of a variable within a prescribed local.
Lecture 5 - Financial Planning and Forecasting
By Amanda Weinstein and Mark Partridge Swank Program in Rural-Urban Policy Presented at the Leadership.
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
Conveyancing What role can it play in identifying and remediating homes above 200 Bq/m 3 ? Stephanie Long Senior Scientist, Radon Advice.
Contingent valuation: how accurate is it when valuing impacts on property values? Judith Callanan RMIT University Melbourne, Australia.
The Impact of Changing Economic Conditions Since 2005 on the Forest Sector Richard W. Guldin and W. Brad Smith U.S. Forest Service Research & Development.
Dr. Shannon L. Ferrell Assistant Professor Oklahoma State University Department of Agricultural Economics Oil, Gas, Wind and Agriculture: Can’t We All.
Workplace Injury Insurance – Claims estimates Information for employers September 2006.
DATA COLLECTION AND ANALYSIS n GENERAL DATA: SOCIAL CONSIDERATIONS n POPULATION CHARACTERISTICS SUCH AS AGE, FAMILY SIZE, HOUSEHOLD INCOME, ETC. n PRESENCE.
1 UK Climate Projections 2009 Regional Data – West Midlands.
Dr. Michael Duffy, Iowa State University Extension Economist Iowa Land Value Survey 2014.
How USDA Forecasts Production and Supply/Demand. Overview  USDA publishes crop supply and demand estimates for the U.S. each month.  Because of the.
SALES COMPARISON APPROACH  THE PROCESS IN WHICH THE MARKET ESTIMATE IS DERIVED BY ANALYZING THE MARKET FOR SIMILAR PROPERTIES.  A MAJOR PREMISE OF THE.
 Transmitting power at high voltage and in DC form instead of AC is a new technology proven to be economic and simple in operation which is HVDC transmission.
1 Module 6, Part 3: PPE (Property, Plant and Equipment) 1. Costs to Capitalize 2. Depreciation 3. Asset Sale or Impairment 4. Disclosure 5. Ratios.
Compiled by E.I. See Montgomery County Public Schools, Maryland Curriculum 2.0 – Grade
MODELING DEFORESTATION AT THE LANDSCAPE LEVEL FROM ANALYSIS AT THE PROPERTY-FARM LEVEL: FINDINGS AND FORECAST FROM THE ALTAMIRA CASE Bruce Boucek, Stephen.
Land Acquisition and Resettlement: Investment Risks.
Agricultural Policy Effects on Land Allocation Allen M. Featherstone Terry L. Kastens Kansas State University.
Scale and Distance. Map Scales Large scale maps show the most detail but only cover a small area e.g. road maps, town plans. Small scale maps show less.
Benefits of the East West Interconnector
© 2004 South-Western Publishing 1 Chapter 10 Foreign Exchange Futures.
Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.
Inventories Revsine/Collins/Johnson/Mittelstaedt: Chapter 9 McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Questions on cycle representativeness (French position) EU – WLTP 17 th of September 2013.
© 2004 South-Western Publishing 1 Chapter 10 Foreign Exchange Futures.
1 Chapter 6: Reporting & Analyzing Operating Assets Part 3: Property, Plant & Equipment.
Monthly Market Watch for Maricopa County Anoverview of what is happening in the Maricopa County real estate market (using January 2009 statistics) Provided.
HOW POWER GETS TO OUR HOMES. 1.-POWER STATION Power stations make electricity. They usually burn coal or natural gas to work the generating machinery.
Geography of Canada Time Zones & More on Scale.
 The more you use these ratios and the more you practice using them the easier it will be to remember the calculations, apply them in your exam and.
Effect of new Regulated Charges Daniel Horgan Head of Industrial & Commercial Sales at Energia.
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without.
HVDC Transmission.
Florida Algebra I EOC Value-Added Model June 2013.
CITY OF STOCKTON CITY COUNCIL AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTORS : AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTORS : 9.02Agricultural.
"Housing and Planning Bill: The End of Affordable Housing
Electricity is produced at the power station.
Scale and Distance.
Write an Impact Statement for Your Extension Forestry Program
MENU OF TOOL TOPICS (Choose 4 out of the 11 listed)
Menu of Tool Topics (Choose 4 out of the 11 listed)
Texas Woman's University
What is a scale? Scale is the ratio of the size of objects on a map compared to their size in the real world. 4 cm:1 km For example on a map with the scale.
Life Cycle Costing.
Presentation transcript:

AFFORDABILITY Underground Cable costs 2-3 times more economical than overhead lines and pylons  EirGrid is misleading the public on statements to the media regarding cost comparisons of underground cable and overhead lines  EirGrid currently quoting from various reports that underground cables construction costs will be 3.5 times that of overhead transmission lines and pylons  But EirGrid possess the actual costs of both technologies:  Many overhead line projects already completed  Major underground and undersea project recently completed  East-West interconnector HVDC cable  Construction costs for both are very similar, based on EirGrid figures:  Average Overhead line construction costs published by EirGrid for Grid Link, Grid West and the North-South interconnector = €2.1Million per kilometre  Average underground and undersea cable cost for the East-West interconnector is €2.2 Million per kilometre  EirGrid refuses to factor in devaluation costs, delay costs, tourism and landscape costs and health related costs and concerns  NEPPC has carried out a detailed analysis of property and land devaluation  Combined devaluation costs for North-South interconnector = €310 Million  EirGrid agree delay costs of €30M per year, currently running at 7 year delay  = €210 Million  Total overhead line costs = €798 Million  = 3 times higher than underground cable costs SUMMARY - KEY FACTS Underground makes sense Briefing Doc. 101

Affordability – Main Components  Construction costs are the main focus of most reports.  Operational costs are sometimes examined.  But impact costs, such as farm and property devaluation and project delays also carry real costs to affected parties. Transmission Costs Perspective Electricity Bill Breakdown  PSO levy imposed is 5% of bill  Transmission costs represent only 6% of bill

Eirgrid Statements & Claims on Underground Construction Cost Ratios 2007: Undergrounding is 25X more than Overhead Lines 2012: Undergrounding is 3X more than Overhead Lines 2015: Undergrounding is 1.5X more than Overhead Lines Which way is this going? PROJECTLENGTH KM CONSTRUCTION COST €M CONSTRUCTION COST €M per KM North-South Grid Link Grid West Average2.1 PROJECTLENGTH KM CONSTRUCTION COST €M CONSTRUCTION COST €M per KM East-West Average2.2 EirGrid Published Project Costs Overhead Lines Underground Cables

Property & Land Devaluation  Major studies carried out over the last fifty years all around the world  Power lines have a statistically significant negative impact on property values.  Properties negatively affected for up to 2.5 km away  Value of detached properties at a distance of less than 100m from overhead transmission lines was 38 percent lower than comparable properties (UK Study, 2007)  Non-residential holdings  Per acre values from more than 1,000 agricultural property sales were percent lower for properties with easements for transmission lines than for similar properties without easements  North-South Interconnector: Detailed corridor Devaluation Study performed by NEPPC Overhead Line Costs: N-S Interconnector EirGrid published construction costs Sources:  Construction & Delay costs – EirGrid  Property & Land devaluation – NEPPC  Tourism & Health costs – not included  EirGrid estimated landowner compensation: €9Million ??

256 Km long 34 km undergrounded along roadside from Rush in Dublin to Woodland in Meath Underground N-S Interconnector Same Technology as E-W Interconnector: Construction Costs East-West Interconnector 256 km length €570M cost = €2.22M per kilometre North-South Interconnector 140 km €2.22M per kilometre = €310M cost* *Overestimate, as 70% of E-W line is subsea cable (extra lead sheathing)

Underground Cable Costs: N-S Interconnector EirGrid E-W Interconnector Reference €M Underground cable vs. Overhead lines full costs N-S Interconnector * Does not include tourism or health impacts 798 * Data Sources: Construction & delay figures: EirGrid Devaluation figures: NEPPC