ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.

Slides:



Advertisements
Similar presentations
Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Advertisements

Front end test stand — WP2
ISIS Accelerator Division
The RAL Front End Test Stand David Findlay ISIS Accelerator Division Rutherford Appleton Laboratory Oxfordshire, UK STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
Solid Target R&D Programme Colliding the proton beam with a dense target is currently the only known way to produce enough muons for the neutrino factory.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Proton Driver Status ISIS Accelerator Division John Thomason.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
M W PooleASTeC Ten Years On Origins of ASTeC Mike Poole Former ASTeC Director.
4 th September 2006 UK Neutrino Factory C.R. Prior CCLRC-ASTeC and Trinity College Oxford On behalf of the UK Neutrino Factory Collaboration CCLRC Adams.
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
Snapshot of UK graduate training Philip Burrows John Adams Institute for Accelerator Science Oxford University Philip Burrows TIARA Kickoff Meeting, CERN,
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation,
F Project X Overview Dave McGinnis October 12, 2007.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Alexander Aleksandrov Oak Ridge National Laboratory
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Developments of the FETS Ion Source Scott Lawrie.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
Introduction to NS-FFAGs and EMMA Rob Edgecock STFC Rutherford Appleton Laboratory.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
Beam losses on ISIS and induced radioactivity from MICE David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
First Line Diagnosis FLD Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement.
Proton Driver Developments and the Neutrino Factory Christopher R Prior ASTeC Intense Beams Group STFC Rutherford Appleton Laboratory, U.K.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ISIS operational update
UK Neutrino Factory Conceptual Design
Proton Driver Scenarios at RAL and CERN
The RAL Front End Test Stand
Towards a Common Proton Driver for a Neutrino Factory
Accelerator R&D for Future Neutrino Projects
1- Short pulse neutron source
European Spallation Neutron Source ESNS
Progress towards Pulsed Multi-MW CERN Proton Drivers
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
Presentation transcript:

ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October 2011

ISIS, FETS, ASTeC (IBG),RAL Electron-proton dipole ASTeC, DL Dipole moment ~1 C.m ~10 30 Debye unitsElectric field at 1 m: ~10 GV/m

3 Overview of talk ISIS Science programme Accelerator R&D Upgrades Front End Test Stand Rôle of ASTeC

4 But first — protons in the UK At AERE 1 /Harwell/NIRNS 2 /RHEL/RAL: Harwell synchrocyclotron (1949, 165 MeV, 1 µA) PLA (Proton Linear Accelerator, 1959–1969) 50 MeV, 3-tank — originally was to be 600 MeV Harwell ~7 MV tandem accelerator Harwell VEC (Variable Energy Cyclotron, 1965–1980s) Nimrod, 7 GeV proton synchrotron (1964–1978) ISIS, 800 MeV proton synchrotron (1984– ) 1 Atomic Energy Research Establishment (1946) 2 National Institute for Research in Nuclear Science (1957)

Harwell tandem

PLA — Proton Linear Accelerator

Never built Aimed down runway

PLA tank going into Building R12 at RAL

PLA tank in R5.1 — as part of new injector for Nimrod

Remedial work on other tanks for new injector for Nimrod

PLA tank in R5.1 — as part of injector for ISIS

Cockcroft at ground-breaking ceremony for Nimrod

Construction of Nimrod synchrotron hall

4.6 MVA alternator ( HP motor + 24 ton flywheel) × 2

First beam from Nimrod

17 ISIS World’s most productive spallation neutron source (if no longer highest beam power) Flagship STFC facility [Sci. Tech. Facilities Council] Driven by UK’s high-power proton accelerators UK has largest national neutron user community of any country Accelerator physics at ISIS necessary for continuing operations — and also for enabling entire programmes on materials R&D Need to plan for upgrades

18 ISIS Fundamental purpose — to investigate structure and dynamics of molecular matter Neutron sources complement light sources Neutrons: ~0.1 eV → ~1Å StructureAtomic motionsParacetamol

Global challenges ISIS Energy Living with environmental change Global threats to security Ageing: Life-long health and wellbeing Digital economy Nanoscience: through engineering to application Impact of ISIS science

ISIS from air

22 RFQ: 665 keV H –, 4-rod, 202 MHz Linac: 70 MeV H –, 25 mA, 202 MHz, 200 µs, 50 pps Synchrotron:800 MeV proton, 50 Hz 5 µC each acceleration cycle Dual harmonic RF system [Chris Prior] Targets:2 × W (Ta coated) Protons: 2 × ~100 ns pulses, ~300 ns apart Moderators:TS-1: 2 × H 2 O, 1 × liq. CH 4, 1 × liq. H 2 TS-2: 1 × liq. H 2 / solid CH 4, 1 × solid CH 4 Instruments:TS-1: 20TS-2: 7 (+ 4 more now funded) ~340 staff

–35 kV H – ion source

665 keV 4-rod 202 MHz RFQ

70 MeV 202 MHz 4-tank H – linac

1.3– –6.2 MHz 70–800 MeV proton synchrotron

Superperiods 9, 0 and 1 of 800 MeV synchrotron

EPB1 and EPB2 to TS-1 and TS-2 above synchrotron Protons to TS-1 Protons to TS-2

ISIS TS-1 experimental hall, 20 instruments

ISIS TS-2 experimental hall, 7 instruments + 4 under way

TS-1 tungsten target, plates

TS-2 tungsten target, solid cylinder

ISIS Upgrades 4) Upgrade 3) + long pulse mode option 0) Linac and TS-1 refurbishment 1) Linac upgrade, ~0.5 MW on TS-1 2) ~3 GeV booster synchrotron: MW target 3) 800 MeV direct injection: 2–5 MW target

2) ~3 GeV RCS fed by bucket-to-bucket transfer from ISIS 800 MeV synchrotron (1MW, perhaps more) 3) Charge-exchange injection from 800 MeV linac (2 – 5 MW) 1) Replace 70 MeV ISIS linac by new ~180 MeV linac (~0.5 MW) ISIS MW Upgrade Scenarios ASTeC staff vital to success

Based on MW ISIS upgrade with 800 MeV Linac and 3.2 GeV RCS Assumes a sharing of the beam power at 3.2 GeV between the two facilities Both facilities can have the same ion source, RFQ, chopper, linac, H − injection, accumulation and acceleration to 3.2 GeV Requires additional RCS machine in order to meet the power and energy needs of the Neutrino Factory Common proton driver for neutron source and neutrino factory

NF on Harwell Oxford site muon linac cooling phase rotation bunching RLA 1 muon FFAG RLA 2 decay ring to Norsaq 155 m below ground decay ring to INO 440 m below ground UKAEA land now not to be decommissioned until at least 2040 (unless we pay for it!) Extensive geological survey data available, but needs work to interpret implications for deep excavation and ground water activation

37 FETS — Front End Test Stand Actually the second front end test stand at RAL First test stand was built to test RFQ to replace ISIS Cockcroft-Walton

ISIS 665 kV Cockcroft-Walton (1984–2004)

665 keV 4-rod 202 MHz RFQ RFQ test stand ion source, LEBT, RFQ, diagnostics

40 Front End Test Stand (FETS) Key technology demonstrator for next generation of high power pulsed proton accelerators ISIS upgrades Neutrino factories Future spallation neutron sources Accelerator-driven systems Waste transmutation... Only dedicated high-power proton accelerator hardware R&D project in the UK

41 Key components of FETS High-intensity, high-duty factor, H – ion source (60 mA, 2 ms, 50 pps) Magnetic low energy beam transport (LEBT) 324 MHz 4-vane RFQ Medium energy beam transport (MEBT) Very high speed beam chopper Comprehensive beam diagnostics Collaboration — ISIS, ASTeC, Imperial College, Warwick University, ESS Bilbao consortium, Royal Holloway, [Huddersfield, UCL]

In R8 at RAL

43 Ion source and LEBT optimisation 60 mA H – beam current demonstrated Low measured emittance at high current in the FETS LEBT

44 RFQ design + manufacture RFQ cold model Weld test models under investigation at Imperial Integrated electromagnetic, thermal, fluid flow and mechanical design

45 Beam chopper Essential for all high-power proton accelerators with rings FETS chopper Two-stage for wide-band functionality Basis for ESS design

46 4 metres

47 Helical prototypePlanar prototype Re-bunching cavities

48 Beam diagnostics Already in use Current transformers Faraday cup Slit-and-cup scanners for time-resolved 2D emittance Scintillators for beam profiles Pepper-pot for 4D phase space Being developed Laser photo-detachment (“laser wire”)

49 At present Cutting metal for RFQ Increasing laser power for laser wire Continuing ion source development … In future Commission RFQ Demonstrate high-quality beam chopping Spin out hands-on accelerator expertise …

50 ASTeC Re-packaging of long-held national lab. skills — larger package than in the past Skills  NINA, SRS, Nimrod, ISIS, Diamond,... “ASTeC” skills enabled / continue to enable Nimrod  ISIS ESS designs (1990s, early 2000s) ISIS second harmonic RF upgrade TS-2 FETS ISIS Accel. Theory Group  ASTeC Intense Beams Group (IBG) — IBG still in ISIS R2 building

51 ASTeC— has enabled ISIS Happy birthday! And many happy returns! — is enabling FETS — will enable ISIS upgrades