Facility Investment Program HRSA-10-029 Post-Award Technical Assistance Call December 16, 2009.

Slides:



Advertisements
Similar presentations
Capital Development – Building Capacity (CD-BC) Program HRSA
Advertisements

MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Contract Staff Training Contract Management 2007.
Capital Development – Immediate Facility Improvements (CD-IFI) Program HRSA Notice of Award Technical Assistance.
1 of 61 EHBs v2.0 Overview Health Resources and Services Administration (HRSA) Presented To: Grantees EHBs version 2.0 – Overview for Grantees.
U.S. Department of Veterans Affairs Veterans Health Administration Supportive Services for Veteran Families (SSVF) Program SSVF Grantee Uniform Monitoring.
Preservation Tax Incentives for Historic Buildings A Joint Program of the following agencies: Department of the Treasury Internal Revenue Service Department.
State Auditor’s Office March 10, 2010 Brad White, CPA Single Audit Coordinator.
The U.S. Department of Housing and Urban Development (HUD) requires states to have a system in place for reviewing approved CDBG projects Each state’s.
ADMINISTRATIVE MANAGEMENT OF HRSA GRANTS
Marcy Mealy Procurement Specialist CDBG Program
Managing Your Grant: A Roadmap to the Finish Line Carol Gelormine Manager of Grant Accounting Division of Finance & Treasury Catherine Bruno Post-Award.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
Circular A-110 Everything You Didn’t Want to Know.
Affordable Care Act Patient Center Medical Home – Facility Improvements (PCMH-FI) Grant Program HRSA Post-Award Technical Assistance.
Washington Metropolitan Area District Office SBA.
1 CDBG Procurement Requirements For Local Officials.
Grants Management Overview 2013 Minority Fellowship Program Grantee Meeting April 23-24, 2013 Salvador Ortiz; Maria Martinez;
Capital Improvement Program HRSA General Overview May 5, 2009.
May Capital Improvement Program HRSA Equipment Projects: IT/Equipment and HIT May 8, 2009.
FY 2013 Health Center Outreach and Enrollment Assistance Supplemental Funding Opportunity Announcement HRSA Health Resources and Services Administration.
U.S. Small Business Administration
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Health Center Planning Grants: An Overview of Final Reporting Requirements & Grants Close Out Avni Shridharani, MHS Senior Advisor Bureau of Primary Health.
Closeouts and Equipment Disposition Marianne Eggers, NOAA GMD.
Outreach Program Grants Administration 101 Kathryn Umali, MPH, CHES U.S. Department of Health & Human Services (HHS) Health Resources & Services Administration.
Capital Improvement Program Post-Award Technical Assistance Call July 7, 2009.
Foundation Financial Services Post Award Nancy Gomez Post Award Analyst.
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
Grant Requirement Reminders Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
School-Based Health Center Capital HRSA Post-Award Technical Assistance Call January 10, 2013.
Facility Investment Program HRSA Application Technical Assistance Call June 25, 2009 —Revised June 26, 2009.
Solving the Matching Dilemma Session 32 Tuesday, May 24, 2011 National Extension and Research Officers Administrative Conference Anchorage, Alaska.
Cost Principles – 2 CFR Part 200 Subpart E U.S. Department of Education.
Monitoring & Oversight Adult Education and Literacy (AEL) Programs Brenda B. Williams Project Manager Texas Workforce Commission Regulatory Integrity Division.
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
May 6, Capital Improvement Program HRSA Alteration/Repair/Renovation and Construction Projects May 6, 2009.
Got the Grant What’s next??????????? Joy R. Knipple Team Leader, National Institute of Mental Health July 26, 2006.
U.S. DEPARTMENT OF LABOR EMPLOYMENT AND TRAINING ADMINISTRATION ARRA GREEN JOB AND HEALTH CARE / EMERGING INDUSTRIES NEW GRANTEE POST AWARD FORUM JUNE.
Labor Standards Pam Truitt  September 10, Key Regulations & Statutes  Davis-Bacon Act  Copeland Act (Anti-kickback Act)  Contract Work Hours.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Fiscal Year (FY) 2013 National Training and Technical Assistance Cooperative Agreements (NCA) Non-Competing Continuation HRSA 5-U NCA TA Website:
Close-Outs Presented by Stacy Tedder NOAA Grants Management Division January 31,
Using the HRSA EHB to Report 2009 Uniform Data System (UDS) Data “New Start” Grantee Technical Assistance Call December 15, 2009.
Fiscal Year 2015 Health Infrastructure Investment Program (HIIP) Funding Opportunity Announcement: HRSA Objective Review Committee Application Technical.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
U.S. DEPARTMENT OF LABOR EMPLOYMENT AND TRAINING ADMINISTRATION ARRA GREEN JOB AND HEALTH CARE / EMERGING INDUSTRIES NEW GRANTEE POST AWARD FORUM JUNE.
FY 2015 Health Center Outreach and Enrollment Assistance Supplemental Funding Opportunity Announcement HRSA Health Resources and Services Administration.
Arkansas Association of Federal Coordinators September 23, 2011.
FY 2011 Budget Period Progress Report Cheri Daly
Health Center Capital Development Quarterly Progress Report Technical Assistance Call March 2013.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
“SPEAR” W ORKSHOP O CTOBER 19 & 30, 2015 ANGELLE GOMEZ S UBAWARD R ISK A SSESSMENT / MONITORING.
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
PY 2005 Grant Officer Overview U.S. Department of Labor Employment and Training Administration Office of Grant and Contracts Management.
National Center for Research Resources NATIONAL INSTITUTES OF HEALTH T r a n s l a t I n g r e s e a r c h f r o m b a s i c d i s c o v e r y t o i m.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
POST-APPROVAL MANAGEMENT CONFERENCE CHICAGO REGIONAL OFFICE POST-APPROVAL MANAGEMENT CONFERENCE CHICAGO REGIONAL OFFICE.
1 On-Line Financial Management Workshops Cost Classification, Administrative Costs & Program Income June 2009.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
Juanita Syljuberget Alabama Cooperative Extension System May 23, 2012.
Metra Construction Contractor Prevailing Wage Workshop
SUBRECEPIENTS POST-AWARD PROCEDURES
Sponsored Programs at Penn
Grants Management 101 Part A
Health Center Outreach and Enrollment (O/E) Quarterly Progress Report (QPR) Training October 9, 2013.
Presented by Dr. McArthur Floyd
Presentation transcript:

Facility Investment Program HRSA Post-Award Technical Assistance Call December 16, 2009

December Objectives  Describe the outcome of the Facility Investment Program (FIP) applications  Discuss critical compliance requirements  Review the terms and conditions of the FIP Notice of Grant Awards (NGA)  Explain the process for FIP post-award submission and review

December FIP Stats  On December 9, HRSA awarded $508.5 million in FIP awards to 85 health center grantees  The funded applications includes 108 projects are proposed at –80 or new/expanded health center sites (construction projects) –28 improved/upgraded health center sites (alteration/renovation projects)  The breakdown of the number of projects per funded application –1 project = 65 –2 projects = 17 –3 projects = 3

December ARRA General Requirements  New grant number: C80  Separate PMS sub-account: ARRAFIP-C80-10  Funds must be accounted for and reported separately (from section 330 funds and from other ARRA funds) –Applicants must not co-mingle or pool Federal, State, or local funds –If other sources of funding exists, FIP funds should be drawn down proportionately to approved total costs  Quarterly reports

December Review of FIP Applications  The Division of Independent Review managed the objective reviews by an Objective Review Committee (ORC)  FIP proposals were subject to internal and technical reviews (as applicable): –Completeness –Eligibility –Service Area Overlap –Architectural & Engineering Reasonableness –Federal Interest –Environmental Review –Historic & Cultural Preservation

December Types of FIP Projects  Health centers proposed up to three of the following types of FIP projects –Alteration/renovation: includes work required to modernize, improve, and/or change the interior arrangements or other physical characteristics of an existing facility or install equipment. This type of project should not increase square footage. –Construction (new site or expansion of existing site): includes—(i) adding a new structure to an existing site that increases the total square footage of the facility; and (ii) permanently affixing structure (e.g., modular units, prefabricated buildings) to real property (i.e., land).

December Ineligible FIP Costs  Costs incurred prior to February 17, 2009  Any costs related to a Capital Improvement Program (CIP) project awarded under HRSA FIP awards must not be used to replace any funds that have been awarded for a CIP project. As a reminder, the proposed FIP project must be separate and distinct projects from what was funded under the CIP initiative  Operating costs (e.g., funding direct services, clinical full-time equivalents, rent, mortgage payments, refinanced credit facilities)  Land or facility purchase costs are not eligible uses of FIP grant funding. Eligible projects may contain land/facility purchase costs; however, individual project budgets must show sufficient resources other than FIP funding to cover those expenses.  Per section 1604 of the Recovery Act: None of the funds appropriated or otherwise made available under the Recovery Act may be used by any State or local government, or any private entity, for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool

December Equipment Purchases  Equipment should only be purchased in conjunction with an approved FIP alteration/renovation or construction project  Equipment must be used at the approved project site  Grantees should have provided a detailed equipment list to identify the equipment to be purchased with the FIP project; final equipment list is required  Equipment must be maintained, tracked, and disposed of in accordance with 45 CFR Parts and December 20098

9 Federal Interest  The Federal government always retains interest in property constructed, acquired, or improved with Federal funds –For ALL construction projects, applicants must file a Notice of Federal Interest (NFI) –For alteration/renovation projects, Federal Interest exists for the useful life attributable to the alteration/renovations funded under this grant Grantees are required to file a NFI for projects with allowable costs more than $500,000 (excluding moveable equipment) Grantees are not required to file a NFI for alteration/renovation projects with total project costs less than $500,000, excluding moveable equipment costs –Federal Interest still exists –Must maintain documentation regarding protection of all Federal Interest December 20099

10 December Leasehold Improvements  If the project site is leased and it is: –A construction project, or –An alteration/renovation project with a net project cost (total project cost less moveable equipment costs) greater than $500,000; The grantee must provide a signed Statement of Agreement from the facility owner (either with the application or in response to NGA condition) that addresses the following components: –Approval of the scope of the FIP project. –Agreement to provide the applicant health center reasonable control of the project site for at least 10 years. –Agreement to file an NFI in the land records of the local jurisdiction before the project begins.  For all leased property, the requested FIP project amount can not exceed 25 percent of the fair market value (FMV) of the property or 50 percent of the remaining lease, unless the remaining lease is for 30 years or longer. –Additional property value/lease documentation may be requested as a condition on the NGA.

December Environmental and Historic Preservation Requirements  An Environmental Assessment (EA) under the National Environmental Policy Act (NEPA) is a concise public document that provides sufficient evidence and analysis for determining whether HRSA should issue a Finding of No Significant Environmental Impact (FONSI) for proposed FIP projects  The National Historic Preservation Act (NHPA) is intended to protect and preserve historical and archeological sites within the US; HRSA grant funding that is used for construction and alteration/renovation projects is subject to Section 106 review  While some applicants submitted draft EAs and Section 106 consultation letter from the State Historic Preservation Officer, additional information may still be required; please carefully review your NGA  Technical assistance on these two topics is available at December

December Procurement Rules  Grantees are reminded to comply with procurement regulations that apply to Federal grantees –Technical assistance on this topic is available at  ALL goods and services greater than $100,000 must be competitively bid  Remember to include ARRA specific terms on contract bid and award documents.  The simplified acquisition threshold applies to work < $100,000 –Recipients should keep in mind that they still need to get more than one quote (not bids) for the work to determine that the costs are reasonable, and the threshold shall not be broken down into several purchases or artificially reduced to smaller quantities to permit negotiations under simplified acquisition procedures December

December December Wage Determination  All health centers receiving funding through ARRA are required to comply with the Davis-Bacon Act  Davis-Bacon and Related Acts (DBRA) requires all contractors and subcontractors performing on federally funded or assisted contracts in excess of $2,000 for construction, alteration, or repair (including painting and decorating) to pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits for corresponding classes of laborers and mechanics employed on similar projects in the area  Prevailing wage rates and fringe benefits are determined by the Secretary of Labor for inclusion in covered contracts  Technical assistance on this topic is available at

December Use of FIP Space  Grantees must use FIP funding to renovate/construct the space that will be utilized directly by the health center to support health center operations consistent with the 330 program*  FIP funds may not be used to support space which will be utilized and/or rented by other entities*  Utilizing Federal funds to augment appropriations (e.g., charging rent for space constructed with Recovery Act funds) is an ineligible use of Federal funds  Use of the space for mortgage/financing, or change in use of space (leasing, sale, etc.) must have prior approval from HRSA *If other sources of funding are contributing to the project, then the proportion of the space supported with non-FIP funds may be rented to other entities or support non-330 activities (e.g., if 30% of the total project is supported by non-FIP funds, then 30% of the space may be rented out) December

December Other Policy Requirements  FIP projects must: –Be compliant with Americans with Disabilities Act (ADA) and other accessibility requirements –Be compliant with all applicable Federal, State, and local codes and ordinances for the type of facility proposed AND –Have the necessary permits in place before the renovation/construction is undertaken December

December Starting Projects  Grantees must carefully review all terms and conditions of the NGA  Grantees must respond to conditions and HRSA must issue a revised NGA that clearly approves the project and lifts conditions before ground can be broken on a project  Prior to receiving final HRSA approval, grantees may only incur costs related to preparation/preliminary work –Site plans, architectural and engineering schematics, environmental and historic preservation requirements, etc. December

December December Understanding the NGA  Project/budget period for the FIP = 12/09/09 through 12/08/11  FIP activity code = C80  Recipients need to keep in mind—There is no ongoing support of FIP grant activities after the end of the 2-year project/budget period  Contact the assigned Project Officer –For additional details and clarification on resolving conditions –To request additional time to submit post-award deliverables

December December Resolving Conditions on FIP Awards  HRSA has posted a document available online at to assist grantees with resolving conditions on FIP awards  The submissions functionality with the Electronic Handbook (EHB) is active—individual deliverables can be uploaded to each corresponding condition  Revised NGAs will not be issued until all applicable conditions have been met for each FIP project

December Condition Deliverables and Due Dates DeliverableDue Date Schematic drawingsJanuary 8, 2010 Revised budgetJanuary 8, 2010 Revised equipment listJanuary 8, 2010 Capitalization statementJanuary 8, 2010 Site / concept planJanuary 8, 2010 EID checklistJanuary 8, 2010 NFIBefore FIP work begins Lessor statement of agreementJanuary 8, 2010 Lease / property documentationJanuary 8, 2010 December

December Condition Deliverables and Due Dates Environmental Assessment Conditions DeliverableDue Date Consult with Project Officer regarding submitted environmental assessmentJanuary 8, 2010 Environmental assessment requiredMarch 9, 2010 Historic Preservation Conditions DeliverableDue Date Consult with Project Officer to determine if SHPO / THPO is requiredJanuary 8, 2010 SHPO / THPO consultationFebruary 7, 2010 December

December NGA Terms  Grant-specific terms  Program terms (including Recovery Act terms)  Standard terms  Reporting Requirements

December December Proposed New Sites  HRSA has processed most of the new site requests proposed through FIP applications –Approved site address is listed in the NGA –Please review your NGA to find out if additional site information is needed  Grantees are reminded that they are required to verify the new site is operational within 60 days of the project completion

December  HRSA may take action to withdraw the approval and funds for the approved FIP project(s) –the identification of previously undocumented environmental or historic preservation issues that lead the HRSA to conclude a construction project cannot be carried out; –the conclusion that the project cannot be completed as proposed (e.g., information submitted through the required ARRA reporting indicates that the grantee's progress is sufficiently noncompliant with the approved scope, costs or timeline presented in the application and that completion as proposed will not be possible); or –the conclusion that the grantee is noncompliant with a requirement of the application guidance (e.g., the FIP project is not separate and distinct from a CIP project; grantee does not resolve concerns to the satisfaction of HRSA) Term: Special Consideration

December December Next Steps and Timelines  Responding to terms/conditions  Releasing terms/conditions  Draw down of funds Recipients can proceed with preliminary FIP work but must wait to break ground until the project has been cleared by HRSA (preliminary work includes site plans, architectural and engineering schematics, environmental and historic preservation requirements)

December Roles—C80 Project Officer  Monitor conditions  Review of revised schematics and concept / site plans  Assist with pre-implementation  Ongoing monitoring and technical assistance  Closeout

December Roles—C80 Grants Management Specialist  Review revised budgets, capitalization threshold, Federal Interest, lease documentation  Process prior approval requests  Approve Project Director changes  Ongoing monitoring and technical assistance  Closeout

December December FIP Reporting  Health Center Quarterly Report (HCQR) and Section 1512 report for FIP is due January 10 –TA resources are available at  Impact of FIP funding –Number of new/improved sites –Projected number of health center jobs created and retained –Projected number of construction-related jobs created –Project completion status (percent complete) –Actual versus projected budget information—uses of FIP grant funds –Earned value management (for grants over $1 million)  Financial Status Report (FSR)

December FIP Monitoring—Required  The following documentation must be submitted during the course of the project –Pre-certification letter (30 days from date A/E services are secured) –Certification of final design letter (30 days from date design documents are completed) –Bonding and insurance coverage certification (30 days from scheduled contract award date) –Contract information (30 days from contract award date) a copy of the selected contract, certified by the hired architect the formal recommendation of award a statement of determination that the selected contractor is not on the U.S. General Services Administration Lists of Parties Excluded from Federal Procurement or Non-Procurement Programs (debarred list) if the contract is awarded to any qualified bidder other than the lowest bidder, provide proper documentation for your decision a copy of the award letter(s) December

December FIP Monitoring (as necessary)  Additional documentation may be requested to verify the status of the project: –Photos of current status –Milestone chart/construction schedule –Field observation reports –Application and certificate for payment (AIA G702) –Specific documentation (such as permits and invoices) as necessary December

December December FIP Closeout Report  A closeout report is required within 90 days of the completion of the FIP project  The closeout report must include the following items: –Photos of the completed project, including “before” photos –A final budget –A final equipment list –A certificate of occupancy –A certificate of substantial completion –Property insurance –Earned value management (for grants over $1 million)

December C80 Grant Handbook  A new grant handbook for the C80/FIP grant has been created in the grantee’s portfolio in EHB  The project director needs to ensure he/she has added the FIP grant to the portfolio and that the correct grantee staff are assigned to roles and functions in the C80 Grant Handbook  The following EHB Help Resource can guide you through these processes: – F=grants_management#HowToAddhttps://grants.hrsa.gov/webexternal/help/hlpPage.asp?h F=grants_management#HowToAdd

December Electronic Document Submissions in EHB  For FIP, grantees should submit all documents required as a condition of award on the NGA directly to EHB  HRSA Program or Grants Office Personnel may also request other information through the EHBs  By default, the project director will have access to all reports and submissions  All other users must be given privileges to view, edit, or submit by the Project Director or other user with the ability to Administer User Privileges in the Grant Handbook  A presentation on EHB 2.0, including specific details on electronic submissions, is available at

December Grantee EHB Roles and Responsibilities  The Project Director (PD), whose name appears on the Notice of Grant Award (NGA), is responsible for managing access to non-financial reports for a grant  Other roles and privileges: hF=grant_handbook_administer# hF=grant_handbook_administer#

December December EHB Help Resources ResourceTypePurpose Electronic Handbooks URL Call the HRSA Call Center at 877-Go4-HRSA/ ; (9:00 AM to 5:30 PM ET M-F) Phone and/or For assistance accessing EHB or with user names and passwords Do not use this for program questions Call the BPHC Help Desk at (8:30 AM to 5:30 PM ET M-F) Phone and/or For program specific help and system issues Program help by phone or

December December FIP Post-Award Technical Assistance  Technical assistance materials will be posted at –TA call presentation materials and transcripts –Frequently asked questions –Sample budget justification –Draft Environmental Assessment guidance –Section 106 delegation and consultation –Procurement –Wage determination requirements –Federal Interest