Philip Burrows BDS, LCWS08 Chicago, 17/11/081 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Thanks to: Mike Woods, Manfred.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker KEK-DESY meeting 7 th March 2005.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
M. Woods (SLAC) BI Tests for the Linear Collider Turning the LOI into a Proposal SLAC ALCPG Meeting Jan. 9, 2004 M. Woods, SLAC LC-LEP Beam Tests at SLAC.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows LCUK Meeting, Oxford 29/01/04 UK LC-ABD Collaboration UK Beam Delivery System Plans Philip Burrows Queen Mary, University of London.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
S. Molloy, P. Emma, J. Frisch, R. Iverson, M. Ross, D. McCormick, M. Woods, SLAC, CA, USA S. Walston, Lawrence Livermore National Laboratory, CA, USA V.
Fermilab SUMMARY of DISCUSSION Work packages for EDR Main Linac: QUAD package and Instrumentation N.Solyak/K. Tsuchiya Installation and Alignment F.Asiri/A.Tetsuo/R.Ruland.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
LUCX FACILITY INTRODUCTION : PRESENT STATUS AND FUTURE PLANS A. Aryshev On behalf of QB group and THz collaboration Mini-workshop for advanced THz and.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Philip Burrows BDS Kick-off Meeting, SLAC, 13/10/071 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Mike Woods SLAC Thanks.
Global Design Effort Beam Delivery System Summary Andrei Seryi, SLAC ALCPG/GDE meeting October 25, 2007.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
1 R&D Plans for Impedance Driven Single-Bunch Instabilities (WBS 2.2.1) M. Venturini ( presented by M. Zisman) LBNL LCWS07 DESY, Hamburg May 30 - June.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
3/10/2006Marc Ross - SLAC1 RDR Instrumentation – Bangalore ILC-GDE meeting, 3/10/2006 Development and specification process Operations and Beam Dynamics.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
ILC Beam Instrumentation – Introduction Remarks –
Expected hardware status and Priority of the commissioning task
BDS Instrumentation Philip Burrows Mike Woods
CLIC-ILC BDS & MDI work.
Thermal emittance measurement Gun Spectrometer
Linac Diagnostics Commissioning Experience
Breakout Session SC3 – Undulator
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Philip Burrows BDS, LCWS08 Chicago, 17/11/081 BDS Instrumentation Philip Burrows John Adams Institute, Oxford University Thanks to: Mike Woods, Manfred Wendt (FNAL)

Philip Burrows BDS, LCWS08 Chicago, 17/11/082 Outline Reminder of RDR Updated instrumentation list Development of WBS

Philip Burrows BDS, LCWS08 Chicago, 17/11/083 Reminder of RDR Instrumentation was ‘technical system’ with pan-machine view Purview: meas. of beam-related parameters: eg. beam position, charge, size … NOT RF control, temperature, pressure, flow, currents … Boundary with Controls defined (NB feedbacks) Luminosity, energy, polarimetry explicitly excluded Did not consider monitors for beam-related backgrounds

Philip Burrows BDS, LCWS08 Chicago, 17/11/ RDR instrumentation master table

Philip Burrows BDS, LCWS08 Chicago, 17/11/ RDR instrumentation master table

Philip Burrows BDS, LCWS08 Chicago, 17/11/086 RDR BDS Instrumentation List Button / stripline BPMs120 < 100 um Warm C-band cavity BPMs um Warm S-band cavity BPMs um Warm L-band cavity BPMs421 – 5 um Laserwire IPs um Optical monitors (bunch size)11 Deflecting-mode (cold) cavities2100 um Beam current monitors10 Beam phase monitors2 Beam loss monitors (PMT/IC)100/10 Feedback systems12

Philip Burrows BDS, LCWS08 Chicago, 17/11/087 RDR BDS Instrumentation List Button / stripline BPMs120 < 100 um Warm C-band cavity BPMs um Warm S-band cavity BPMs um Warm L-band cavity BPMs421 – 5 um Laserwire IPs um Optical monitors (bunch size)11 Deflecting-mode (cold) cavities2100 um Beam current monitors10 Beam phase monitors2 Beam loss monitors (PMT/IC)100/10 Feedback systems12 NO SPARES!

Philip Burrows BDS, LCWS08 Chicago, 17/11/088 What was costed Pickup station (typically part of vacuum system) ‘Detectors’: PMTs, scintillators, lasers, calib. systems RF system + infrastructure for DMCs Mechanical setup, incl. motors, switches … Signal + control cables, connectors, patch panels Dedicated readout electronics (analogue + digital) Control, timing, calibration electronics Local software + firmware Intra-train feedbacks: dedicated DAQ

Philip Burrows BDS, LCWS08 Chicago, 17/11/ Boundary with Controls

Philip Burrows BDS, LCWS08 Chicago, 17/11/0810 BDS Feedbacks Train-to-train trajectory 5 Hz IP collision: intra-train (3 MHz) + 5 Hz IP luminosity: intra-train NB upstream feedbacks: End-of-linac trajectory: intra-train RTML feed-forward: intra-train Linac cascaded trajectory 5 Hz

Philip Burrows BDS, LCWS08 Chicago, 17/11/0811 Draft BDS Instrumentation WBS 1. BPMs 2. Emittance: transverse 3. Emittance: longitudinal 4. Beam current monitors 5. Beam phase monitors 6. Beam loss monitors 7. Beam feedback systems 8. Beam energy measurements 9. Beam polarisation measurement 10. Background monitors 11. Collision diagnostics

Philip Burrows BDS, LCWS08 Chicago, 17/11/0812 Draft BDS Instrumentation WBS 1. BPMs 1.1 Buttons 1.2 Striplines 1.3 Warm C-band cavities 1.4 Warm S-band cavities 1.5 Warm L-band cavities 2. Emittance diagnostics: transverse 2.1 Laserwires 2.2 Optical monitors (ODR, OTR, X-ray SR) 3. Emittance diagnostics: longitudinal 3.1 Deflecting-mode (cold) cavities 3.2 Other: electro-optic, diodes, Smith-Purcell …

Philip Burrows BDS, LCWS08 Chicago, 17/11/0813 Draft BDS Instrumentation WBS 4. Beam current monitors 5. Beam phase monitors 6. Beam loss monitors: 6.1 PMT 6.2 Ion chambers 7. Feedback systems: 7.1 IP position, angle, luminosity (intra-train + 5Hz) 7.2 Upstream trajectory (5Hz) 7.3 BDS entrance intra-train 7.4 Integration and interface to global system

Philip Burrows BDS, LCWS08 Chicago, 17/11/0814 Draft BDS Instrumentation WBS 8. Beam energy measurements: 8.1 Upstream spectrometer 8.2 Extraction-line system 8.3 Energy spread 8.4 E-z correlations 9. Polarimetry: 9.1 Upstream 9.2 Extraction-line

Philip Burrows BDS, LCWS08 Chicago, 17/11/0815 Draft BDS Instrumentation WBS 10. Background monitors: 10.1 BSR pairs/photons 10.2 SR photons 10.3 muons 10.4 neutrons 10.5 beam halo 10.6 EMI?

Philip Burrows BDS, LCWS08 Chicago, 17/11/0816 Draft BDS Instrumentation WBS 11. Collision diagnostics: 11.1 Luminosity 11.2 Beam offsets 11.3 Beam divergence angles 11.4 Beamcal 11.5 Gamcal 11.6 Beam waists 11.7 Dispersion 11.8 Bunch tilts ‘Standard diagnostics’: alignment, B-field monitors, vibrations …

Philip Burrows BDS, LCWS08 Chicago, 17/11/0817 Comments Some devices are high-volume, with ‘low’ unit cost: toroids, BPMs … Some devices are (unique) complex systems: laserwires, energy spectrometers, polarimeters, LOLA bunch-length monitor, feedback systems … Vast majority of effort will go into complex systems!

Philip Burrows BDS, LCWS08 Chicago, 17/11/0818 PRELIMINARY guess of status Button / stripline BPMsoff-shelf / engineering Warm C-band cavity BPMsengineering / R&D Warm S-band cavity BPMsengineering / R&D Warm L-band cavity BPMsengineering / R&D Laserwire IPsR&D / engineering Optical monitors (bunch size)R&D / engineering Deflecting-mode (cold) cavitiesengineering Beam current monitorsoff-shelf Beam phase monitorsR&D / engineering Beam loss monitors (PMT/IC)engineering Feedback systemsR&D / engineering

Philip Burrows BDS, LCWS08 Chicago, 17/11/0819 Comment In some cases (cavity BPMs, toroids … ) required performance may have been achieved for SINGLE-bunch mode Further R&D may be required to demonstrate TIME- RESOLVED performance bunch-by-bunch

Philip Burrows BDS, LCWS08 Chicago, 17/11/0820 Commissioning strategy If commissioning of BDS and/or IR is anticipated BEFORE the detector(s) are rolled on beamline it may be prudent to plan for appropriate instrumentation at the Machine Detector Interface NOT included so far

Philip Burrows BDS, LCWS08 Chicago, 17/11/0821 MDI ‘Diagnostics’ Electromagnetic interference antennae? Radiation damage monitors? Crab cavity phase Magnet vibrations Alignment Vacuum Temperatures Magnetic fields Power supply currents

Philip Burrows BDS, LCWS08 Chicago, 17/11/0822 Expressions of interest (Oct. 07) Button, stripline, cavity BPMsFNAL LaserwireUK Bunch length (also beam phase)UK, FNAL OTR/ODR monitorsUK, FNAL ToroidsFNAL Feedback systemsUK, FNAL E-spectrometerUK, UCB, JINR, DESY, SLAC, Notre Dame, Oregon PolarimeterIowa, INFN, SLAC, Tufts GamcalBNL, Yale, DESY BDS/IR alignment UK Shintake Monitor (ATF2)Tokyo

Philip Burrows BDS, LCWS08 Chicago, 17/11/0823 scope goals schedule milestones deliverables resources (personnel, materials, infrastructure) co-ordinator Work package outline

Philip Burrows BDS, LCWS08 Chicago, 17/11/0824 Review of performance requirements Document listing specifications resolution, timing, dynamic range, linearity … Review of state of the art / technologies Specification of baseline / alternate technology Conceptual engineering specification Drawing / manufacturer’s part number … Specification of R&D programme with deliverables Revised cost estimate Generalised scope of each task

Philip Burrows BDS, LCWS08 Chicago, 17/11/0825 Status/questions Work packages ‘on hold’ since Black December R&D ongoing: Laserwire, FONT FB, BPMs, bunch length meas., energy meas., polarimetry … much excellent progress! Decide on goals for TDP1, TDP2? Presumably costing will be redone for TDP2? Institute (monthly) instrumentation meetings?