Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Highlights from tracker test at INFN-Perugia Claudia Cecchi Pasquale Lubrano Monica Pepe – Gino.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
Tenuta di Castelfalfi, 23/09/ Highlights from tracker test at INFN-RomaII Francesco Belli on the behalf of INFN-Roma2 Hardware Group Aldo Morselli.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Addition Facts
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
This module: Telling the time
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Version 1.0, 30 November 2004 Slide: 1 METEOSAT SECOND GENERATION (MSG) FIRE DETECTION Author:Jochen Kerkmann Contributors:P. Menzel.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
: 3 00.
5 minutes.
Week 1.
Analyzing Genes and Genomes
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Stepper Basics: Rev.09/04/2002 © 2002 Intelligent Motion Systems, Inc. 1 STEPPER BASICS Motor Dimensions IMS Motor Part Numbers Wiring Configurations 4,
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Highlights from tracker test at INFN-Perugia Claudia Cecchi Pasquale Lubrano Monica Pepe – Gino Tosti Stefano Germani – Lars Fuhrmann Antonino Cucchiara Sara Cutini – Dario Gasparrini Gianluca Scolieri

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Hardware activities at INFN Perugia -Hardware activities performed in Terni laboratories (SERMS) and G&A wafers Electrical tests ladders trays Thermal teststrays Stack tests whole tower in parallel

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Perugia Hardware Group (past and present...future??) F.Marcucci M. FiorucciA. TramacereS. Ciprini N. Marchili PasqualeClaudiaMonica Gino StefanoDario Gianluca

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Silicon wafers electrical test 3632 sensors tested from 18/11/02 to 24/05/04 Performed at Terni laboratories Test station installed on October 2002 with the help of Andrea Papi During installation Gianluca had great ideas for lunch time (Grottino del Nera)....but problems always came up around noon!!! We had to wait for the stack to test Terni gastronomy...

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Ladders electrical test Performed at G&A Francesco Belli introduced us to this funny activity!!! It was November about 600 ladders tested from 12/11/02 to 23/12/04 Hotel La Nuova Fattoria Our home for long time.... Note the snow!! Our home for long time.... Note the snow!! 2 broken.....

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Trays electrical tests Performed at G&A About 250 trays tested from 16/11/04 to 16/09/05 We went to Pisa to learnWe went to Pisa to be trained on 19 October And we learned...

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Trays thermal tests Performed at Terni laboratories About 250 trays cycled (33 cycles each lasting 34 hours from -15° to 45° ) from 23/12/04 to 18/09/05

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Stack tests Performed at Terni laboratories 13 towers have been tested from 31/01/05 to 17/08/05 And finally the day of the training we succeded to go to lunch in Valnerina all together

Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA Conclusions INFN Perugia tested: Tracker:Restaurants: 35% of the sensors 7 in Carsoli/LAquila 20% of the ladders 4 in Valnerina 75% of the trays5 in Terni 75% of the towers (stack) (for further info contact PG people)