1 IFTWG Overview Project Selection and Cost Benefit Analysis Michael P. Onder, Team Leader Office of Freight Management and Operations USDOT-FHWA CVFM.

Slides:



Advertisements
Similar presentations
Implementing a Behavior Based Safety Process at Rockwell Automation
Advertisements

Maryse Robert, Director Department of Economic and Social Development Executive Secretariat for Integral Development San Pedro Sula, Honduras, September.
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Building the case for Windows 8.1 Flexible Workstyle deployment Windows 8.1 Business Value Workshop Microsoft Consulting Services can help you build the.
Advancing Alternative Energy Technologies Glenn MacDonell Director, Energy Industry Canada Workshop on Alternatives to Conventional Generation Technologies.
COMMUNITY RESOURCE MAPPING Train the Trainer MAST - NH December 15, 2006 Facilitated by: Kelli Crane.
Cross Town Improvement Project Randy W. Butler Transportation Specialist US Department of Transportation Federal Highway Administration Office of Freight.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
Transportation leadership you can trust. presented to FHWA’s Talking Freight Seminar presented by Michael Williamson Cambridge Systematics, Inc. April.
Environmental Performance and Energy Efficiency of Supply Chains: Carbon Footprint Project Progress Update Angelina Ermakov, Transportation Working Group.
University of Southern California Enterprise Wide Information Systems Functionality and the Reference Model Instructor: Richard W. Vawter.
Chapter 5: Supply Chain Performance Measurement and Financial Analysis
Certified Business Process Professional (CBPP®)
The topics addressed in this briefing include:
UN/CEFACT Pioneering Paperless Trade: The way covered and the way ahead Experience of Innovative Compliance in Supply Chain Security UN/CEFACT Executive.
The BIM Project Execution Planning Procedure
Electronic Freight Manifest Initiative ITS JPO Lead: Kate Hartman Technical Lead: Mike Onder, Office of Freight Management and Operations.
What is Business Analysis Planning & Monitoring?
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
Simon Brewin Overview of the National Supply Chain Reform Task Force.
Enterprise IT Decision Making
QS 702 Phase II: Encouraging the Integration of Technology Into Higher Education.
Cross Town Improvement Project. Performance Metrics.
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
1 SHRP 2 Implementation Outcomes and Products July 28, 2010 Accelerating solutions for highway safety, renewal, reliability, and capacity.
Industrial Engineering Roles In Industry
Industrial Control Security & Access Control Facilities Management UNECE International Forum on Trade Facilitation Geneva, Switzerland May
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
FHWA Reorganization Update Program Performance Management Standing Committee on Performance Management Meeting Detroit, MI October 14, 2011 Peter Stephanos.
Bi-national Collaboration in Delivering Port-of-Entry Highway Infrastructure Improvements Case Study: Pembina-Emerson Port-of-Entry and Innovations in.
Action Plan Intermodal & ITS Experts Group June 2011 Update.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Clean, Green, and on the Same Team! How Economic and Workforce Development are Partnering to Serve an Emerging Regional Industry.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
Systems Development AIMS 2710 R. Nakatsu. Overview Why do IT projects succeed and fail? Two philosophies of systems development –Systems Development Life.
ATLANTIC Project Intermodal Freight Efficiency and Security 6 March 2002 Canadian Workshop.
___________________________________________________________________________ 2008/TPTWG30/IEG/01 Agenda Item: 7.0 Action Plan for the Intermodal & ITS Experts.
Freight Council Webinar February 21, 2006 Anthony T. Furst Director, FHWA Office of Freight Management and Operations The Framework for National Freight.
Strategic Mobility 21 Focused on Making Decision Relevant Data A Logistics Multiplier in All Domains Strategic Mobility 21 Focused on Making Decision Relevant.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
National Freight Advisory Committee DEC 9, 2013 UPDATE.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Tools: Project Charter (Tab 4)
Technology and the National Freight Action Agenda U.S. Department of Transportation Richard M. Biter Deputy Director US DOT, Office of Intermodalism November.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
EPA Geospatial Segment United States Environmental Protection Agency Office of Environmental Information Enterprise Architecture Program Segment Architecture.
Presents: Information for participants: Your microphone will be muted for the formal presentation. If your audio portion the presentation is not working,
FHWA Office of Freight Management Freight Technology Assessment Tool.
Trusted Trader Initiatives - Beyond the Border Action Plan Transportation Border Working Group April 17, 2012.
RESPONSIBLE CARE ® SECURITY CODE Daniel Roczniak Senior Director, Responsible Care American Chemistry Council June 2010.
Systems Development AIMS 2710 R. Nakatsu. Overview Two philosophies of systems development –Systems Development Life Cycle (SDLC) –Prototyping Alternative.
Government and Industry IT: one vision, one community IAC Shared Interest Groups (SIGs) Review October 26, 2009.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
1 Recommended Next Steps For Improving Quantitative Information California Water Plan Advisory Committee Meeting August 17, 2005.
Washington State Work Zone Rule  Work Zone Rule Implementation  New Work Zone Policy Cathy Nicholas, FHWA - WA Division Office Frank Newboles, WSDOT.
Del Mar College Utilizing the Results of the 2007 Community College Survey of Student Engagement CCSSE Office of Institutional Research and Effectiveness.
Office of Major Project Development (OMPD) Overview November 2015.
Info-Tech Research Group1 Info-Tech Research Group, Inc. is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Scale and Scope of Highway Safety Manual Implementation in the Project Development Process For the Federal Highway Administration (FHWA) By Science Applications.
Change Management A process for process change by Cory R. Peters Exelon PowerLabs.
1 Make Effective Use of SAP: Action Items Training/Continuing Ed/User Forums –Examine training requirements v. training completed –Promote user group participation;
PORT OF TACOMA. Request adoption of Resolution , developing a Port of Tacoma Drayage Truck Improvement Program to improve the local and regional.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Engagement Follow-up Resources
Engagement Follow-up Resources
Strategic Planning in Dynamic Times
MODULE 11: Creating a TSMO Program Plan
Presentation transcript:

1 IFTWG Overview Project Selection and Cost Benefit Analysis Michael P. Onder, Team Leader Office of Freight Management and Operations USDOT-FHWA CVFM Presentation August 31, 2005 IFTWG Intermodal Freight Technology Working Group

2 IFTWG Historical Summary: 1998 Formed by joint recommendation Industry, government, military, vendors Chartered to address consensus needs Based on operational/ process analysis Met regularly 2-3 times/year w/ITS America Communicated program/ project information Formulated, planned, reviewed project results Identified/sponsored pilot demonstrations Injected technology into business practices Formulated to facilitate technical/operational evaluation “Business case” analysis incorporated for sustainability analysis 2003 Meetings Two Annual meetings to coincide with IANA meeting Intercessional Web Cast Outreach to CHCP Project Planning Process Revamped to expand industry participation Introduced Working Group Project Vetting Process Selection Process implemented Introduced Analysis Tools focused on Business Process and Cost Benefit Analysis

3 Working Group Philosophy: The IFTWG is a Forum: For key members of the stakeholder community to collaborate across organizational and institutional boundaries For identifying, vetting, analyzing, and evaluating technological / procedural solutions to challenges within the intermodal freight transportation community For promoting the application and adoption of technology to improve freight movement

4 Stakeholders: Industry –Members: Union Pacific Railroad, American Presidents Line, Hanjin Shipping, Norfolk Southern Railroad, Landstar, Limited Brands –Roles: Real-world test bed, project champions, assets Government –Members: FHWA, TSA, RITA, CBP, Joint Program Office ITS –Roles: Facilitation, reduction/removal of barriers to collaboration Vendors –Members: Trac Lease, TTX, The Greenbrier Companies, QUALCOMM INC., Embarcadero Systems Corporation, Optimization Alternatives –Roles: Practical, responsive evaluation-ready solutions

5 Methods and Tools: Open discussions –Sharing of concerns and priorities –Exchange of ideas Transparent operations –Documented meetings –Open access to leaders –Project Selection Process Rigorous analysis –Project selection and feasibility methodologies –Evaluation of results

6 Project Selection

7 IFTWG Analysis Tools Business Process Mapping “AS IS” Business Processes captured in the supply chain relative to the identified project Business Process Maps include: –Supply Chain Phase (Shipment, Transport, Delivery) –Organization/Party Performing the Work –Information Flows of data –Physical Flows of freight moving

8

9 IFTWG Analysis Tools Cost Benefit Methodology “AS IS” Metrics Qualitative – Industry Standard Performance Metrics Linked to each Business Process Quantitative – Cost Drivers Assigned to each Business Process –Examples: Time to perform the task (Transport Time, Order to Delivery) Number of Occurrences (Shipments, Orders)

10 Cost Benefit Methodology “AS IS” Metrics Qualitative Performance Measure Qualitative Performance Measure Selected

11 Cost Benefit Methodology “AS IS” Metrics Processes Selected Processes Selected and Associated with Qualitative Performance Measure

12 Cost Benefit Methodology “AS IS” Metrics Quantitative Cost Drivers Quantitative Cost Driver associated with Business Process “AS IS” Value of Cost Driver Captured

13 IFTWG Analysis Tools Cost Benefit Methodology “TO BE” Design Expert Panel Evaluation of “TO BE” Project with Technology Deployed –Inputs Performance Metric Improvements –Inputs Cost Driver Improvements User Inputs into CBM Tool –Total Cost of the Project –Cost of Capital –Planned Life of the Project

14 Cost Benefit Methodology “TO BE” Design Qualitative Performance Measure Potential Technology Rated by Qualitative Performance Measure

15 Cost Benefit Methodology “TO BE” Design Quantitative Cost Drivers Cost Driver Improvements for each Technology Selected

16 IFTWG Analysis Tools Cost Benefit Methodology Final Output Qualitative Performance Score –Categories: Reliability, Responsiveness, Flexibility, Assets, Safety, Security –Score given as a total and an average Quantitative Results –Net Present Value –Internal Rate of Return –Payback Period –Benefit Cost Ratio

17 Cost Benefit Methodology Final Output Quantitative Results Qualitative Results

18

19 Summary: IFTWG members proposed 8 projects from the annual meeting in San Antonio in 2004 –Six from industry, One from Government, One from the consultant community Selection Process rendered Two Top Projects in 2005– from industry stakeholders. Chicago Cross Town Improvement Project –Potential Partners include: Class One Railroads, Drayage Companies, TSA, FHWA, FRA Terminal Optimization Project –Potential Partners include: Drayage Companies, Ports, Railroads, CHCP, MARAD Projects to be presented to USDOT as either exploratory or stand alone Tier II Projects when CBM Analysis is complete

20 The End Please write or call: Michael P. Onder, Telephone: