O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.

Slides:



Advertisements
Similar presentations
RPC & LVL1 Mu Barrel Online Monitoring during LS1 M. Della Pietra.
Advertisements

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Releases & validation Simon George & Ricardo Goncalo Royal Holloway University of London HLT UK – RAL – 13 July 2009.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
GNAM and OHP: Monitoring Tools for the ATLAS Experiment at LHC GNAM and OHP: Monitoring Tools for the ATLAS Experiment at LHC M. Della Pietra, P. Adragna,
CSC Online and Offline DQA Status Ken Johns, Venkat Kaushik, Xiaowen Lei (U. Arizona)
11 CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)
CSC DQA and Commissioning Summary  We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility  We are ready for.
First year experience with the ATLAS online monitoring framework Alina Corso-Radu University of California Irvine on behalf of ATLAS TDAQ Collaboration.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
CLEO’s User Centric Data Access System Christopher D. Jones Cornell University.
Hall D Online Data Acquisition CEBAF provides us with a tremendous scientific opportunity for understanding one of the fundamental forces of nature. 75.
CERN - IT Department CH-1211 Genève 23 Switzerland t Monitoring the ATLAS Distributed Data Management System Ricardo Rocha (CERN) on behalf.
Central DQM Shift Tutorial Online/Offline. Overview of the CMS DAQ and useful terminology 2 Detector signals are collected through individual data acquisition.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
ATLAS ONLINE MONITORING. FINISHED! Now what? How to check quality of the data?!! DATA FLOWS!
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
Trigger Offline Monitoring Report Valeria Bartsch (Sussex), Ricardo Gonçalo (RHUL) Trigger General Meeting – 26 th May 2010.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Monitoring for the LHC experiments Irina Sidorova (CERN, JINR) on.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
Friday Oct 30Monday Nov Data09_cos Data09_calophys Data09_cos Data09_calophys Data09_calophys Some of the last.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
Offline shifter training tutorial L. Betev February 19, 2009.
TRIGGER STATUS AND MENU OPTIMIZATION LHCC Referee Meeting with ATLAS – 7 th July 2009 Ricardo Gonçalo (RHUL) on behalf of the ATLAS TDAQ.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Trigger Offline Expert Report Simon George (RHUL), Ricardo Gonçalo (RHUL) Trigger General Meeting – 25 th November 2009.
Run Coordination Summary of the May 14, 2004 Run Coordinator Meeting CT-EC2 Run Preparation Meeting May 17, 2004 Slide 1 Peter Loch University of Arizona.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – April 12, 2007 Outline: Reminder of plans Status of infrastructure.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
K. Jon-And, Stockholm University1 Tilecal Team 5 meeting 8 November 2005.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
Prompt Calibration Loop 11 February Overview Prompt calibration loop in SCT –Provides ATLAS with conditions data used for the bulk reconstruction.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Magnoni Luca Early Stage Researcher WP5 - ATLAS.
Trigger Offline Monitoring Report Experts: Jiri Masik, Ricardo Gonçalo Shifters: Iwona Grabowska-Bold, Holger von Radziewski, Gustavo Otero y Garzon, Michael.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.
Performance DPDs and trigger commissioning Preparing input to DPD task force.
Trigger Input to First-Year Analysis Model Working Group And some soul searching… Trigger Open Meeting – 29 July 2009.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
1 Cosmic commissioning Milestone runs Jamie Boyd (CERN) ATLAS UK Physics Meeting-- J Boyd Jan
14 th IEEE-NPSS Real Time Stockholm - June 9 th 2005 P. F. Zema The GNAM monitoring system and the OHP histogram presenter for ATLAS 14 th IEEE-NPSS Real.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
A Validation System for the Complex Event Processing Directives of the ATLAS Shifter Assistant Tool G. Anders (CERN), G. Avolio (CERN), A. Kazarov (PNPI),
M. Caprini IFIN-HH Bucharest DAQ Control and Monitoring - A Software Component Model.
MET Slice Monitoring Xiaowen Lei, Venkat Kaushik Ken Johns.
Joe Foster 1 Two questions about datasets: –How do you find datasets with the processes, cuts, conditions you need for your analysis? –How do.
ADC Operations Shifts J. Yu Guido Negri, Alexey Sedov, Armen Vartapetian and Alden Stradling coordination, ADCoS coordination and DAST coordination.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
TGC online DQ GNAM + RODSampler status 11/09/2009 GNAMs + ROD sampler: 6/6 GNAM segments running. 1 RODSampler application running. 1/6 GNAM segment (efficiencies.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
TGC L1 Trigger On-Line Monitoring Tel Aviv University:
Central DQM Shift Tutorial Online/Offline
Monitoring of L1Calo EM Efficiencies
F. Bellini for the DQM core DQM meeting, 04th October 2012
MICE Computing and Software
Offline shifter training tutorial
Offline shifter training tutorial
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
TriggerDB copy in TriggerTool
Level-1 Calo Monitoring
HLT Jet and MET DQA Summary
CMS Pixel Data Quality Monitoring
DQM for the RPC subdetector
Presentation transcript:

O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team

Introduction

Aims: – The offline trigger monitoring shifter has two main tasks: Monitor the D EBUG S TREAM analysis Monitor the trigger D ATA Q UALITY Practicals: – The trigger shifter is in constant contact with a Trigger Offline Expert on call A small team of experts rotate to make sure there is always someone on call Will also be able to answer the shifter’s questions/doubts The expert will direct the shifter’s work – Especially in case non-standard operations are needed – One shift per day from 9am to 3pm in the TDAQ S ATELLITE C ONTROL R OOM (SCR) Look for category “T RIGGER O FFLINE M ONITORING S HIFTER ” (task 46640) in OTP It will be possible to do this shift remotely once the all the tools are available and the LHC is running smoothly – probably sometime in 2011 Organization: – The activity is overseen by Alessandro Di Mattia and is an essential part of the T RIGGER O PERATIONS area It makes sure that the trigger is working without problems and that the data collected is good for analysis

Offline Monitoring and Reconstruction in Tier0 ATLAS Trigger/DAQ DEBUG Streams PHYSICS Streams Trigger Reprocessing in Tier0 CASTOR Pre-reprocessing Analysis Post-reprocessing Analysis Data Quality from Tier0 Histos Data Quality from Tier0 Histos DEBUG stream analysis Trigger DATA QUALITY

D EBUG S TREAM M ONITORING

ATLAS Trigger/DAQ DEBUG Streams Trigger Reprocessing in Tier0 CASTOR Pre-reprocessing Analysis Post-reprocessing Analysis Debug Stream analysis: Events generating error conditions either in the DAQ infrastructure or the HLT software are sent to debug streams: – debug_EFHLTTimeout – debug_efdProcTimeout – debug_L2ForcedAccept – etc They are reprocessed in the Tier0 and a set of analysis histograms are produced pre- and post-reprocessing to help diagnose the error

Debug Stream Monitoring: Webpage dedicated to the use of the offline shifter and expert on call Automatically displays the recorded runs and provides a nice way to keep the information about past runs Provides access to the debug stream contents and to analysis histograms before and after reprocessing

The HLT reprocessing is controlled by the TOM interface which is also used to do ad-hoc re-processings of old runs to test new software, debug errors etc Running jobs can be monitored in the conTZole Task Lister: monitoring-caf.cern.ch/taskLister.htmlhttps://atlas-tz- monitoring-caf.cern.ch/taskLister.html

T RIGGER D ATA Q UALITY A SSESSMENT

Offline Monitoring and Reconstruction in Tier0 ATLAS Trigger/DAQ PHYSICS Streams Data Quality from Tier0 Histos Data Quality from Tier0 Histos Trigger DATA QUALITY The trigger software is monitored online – each trigger algorithm running on each working node publishes monitoring histograms …and offline – monitoring algorithms run in Tier0 during event reconstruction and produce histograms from online trigger data Slice experts take care of checking the monitoring data from each run at the moment This will be increasingly the task of the offline trigger shifter

Go to Click on the stream and run that you like, e.g /L1Calo Look under HLT: each link corresponds to a trigger domain: e.g. HLT->EFID

Once you determine if a run is good or bad, update the corresponding Data Quality (DQ) flags – only the “ShiftOFFLINE” flags are updated by the shifter To update DQ flags go to:

The flags are then combined with the DQ flags set online and automatically by DQMF and used to select data for analysis using the Good Run Lists

D OCUMENTATION