REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
ColUSM #51 30 th January, 2015 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, Q. Deliege, V. Baglin, F. Savary.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.
New HV test specification for the LHC N. Catalan for the EI section.
MQXF state of work and analysis of HQ experimental current decays with the QLASA model used for MQXF Vittorio Marinozzi 10/28/
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
CRYOGENICS AND POWERING
Overview of the recommendation on LHC Splices Consolidation Frederick Bordry, head of the CERN Technology Department, has called for a series of three.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Quench-based magnet sorting at the MEB presented by L. Bottura Workshop on Beam generated heat deposition and quench levels for LHC magnets March 3 rd,
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
The integration of 420 m detectors into the LHC
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Quadrupoles and orbit correctors bus bars routing along the inner triplet string MQXF Workshop at CERN– February the 3 rd 2016 H. Prin With acknowledgements.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
Two-beam module layout
Click here to add footer 1 Ludovic Grand-Clément & Hervé Prin 08/12/2014.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Closing Session Report
Considerations from machine protection and the ELQA teams
Cold mass design, assembly plans and QA/QC at CERN
LHC Enhanced Quench Protection System Review
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
The HL-LHC Circuits: Global View and Open Questions
MMI^2T limits for magnets, what are they and how where they developed
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
Consequences of warming-up a sector above 80 K
Arc magnet designs Attilio Milanese 13 Oct. 2016
Powering the LHC Magnets
Hollow e- lens, Cryogenic aspects
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Circuits description and requirements - Closed Session-
The 11T cryo-assembly: summary of design and integration aspects
Detailed global view on protection and detection of the circuits
3 issues identified in review
WP3 Meeting – December the 10th 2015 H. Prin
Shortening the long RQF/RQD busbar segments in points 1 and 5
F.Pasdeloup, H.Prin, L. Williams
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO WITH INPUTS AND CONTRIBUTIONS FROM: R. PRINCIPE, R. DENZ AND S. RUSSENSCHUCK

GENERAL ELECTRICAL CONSIDERATIONS From the electrical point of view: The cryogenic by-pass represents an additional segment of the busbars added to the magnet circuits The cryogenic by-pass creates an electrical singularity in magnet circuits Electrical integrity of the main magnet circuits and the spool magnet circuits in point 3 is affected Electrical modifications can impact on operations A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 2

RISK ANALYSIS DURING THE DESIGN PHASE Analysis of the 13 kA busbar circuit vs.: Electrical continuity resistive (Cu and SnAg) Electrical continuity (s.c. cable and wire splices) Insulation Robust and simple solutions, stable in time Criticity and sensibility Mechanical issues (Lorentz forces) See also: The Risk Analysis of the LHC 13 kA circuits, available at EDMS Continuous exchange of information between the TE-MSC and EN-MME on electrical issues since the very beginning of the cryogenic by-pass project A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 3

LESSONS LEARNT WERE TAKEN INTO ACCOUNT FEW EXAMPLES (MANY OTHERS AVAILABLE) Dipole line MQ double lyra Kapton damaged Bus bar routing in the SSS A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 4

RISK ANALYSIS DESIGN PHASE: THE CHECK LIST Check the DESIGN CONSISTENCY construction process compromising the quality of the circuit (continuity resistive or supra, quality of insulation in the long term) i.e. quality of the electric joint in the classical interconnection i.e. quality of the contact in the splice of the SSS quadrupoles (examples and pics available by tomorrow) Avoid COMPLEX ROUTING busbar partially filled in SnAg, continuity of the resistive circuit i.e. see coil connections in the SSS quadrupole magnets, some parts manually filled badly compromising the soldering process (pics available by tomorrow). Polyimide exposed to friction (insulation concerns) Busbars locally positioned with INADEQUATE COMPONENTS Shape and material (sharp angles, G11, examples) Assembly (examples) Standard components to be improved (spider, supports in the pipe M1+3 and M2). Adequate dimensioning and positioning of the components to compensate the Lorentz forces (mainly M1+3). Electromagnetic field interactions: busbars in the vicinity of the vacuum pipe (calculation required to estimate the influence on the beam). Busbar movements (single bar) vs. the cryobypass structure assembly phase (compression, extension, possible conflicts) thermal and magnetic cycles Relative movements between busbars A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 5

New design of the fixtures to manage the Lorenz forces reduce the relative movement and to position the bars Reuse of validated designs like central part of the busbars A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 6

Insulating layer (PEHD, rayton) behind the Quad lyras Spider design to be modified Insulating layer (PEHD ?) inserted between Dip and Quad lyras Insulating protection (with smooth profiles) at M1+3 and M2 A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 7

Magnetic shielding around the beam pipe A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 8

Analysis of the busbar maximum movement (assembly phase and thermal) Electrical insulation box separating M1 and M3 busbars A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/2011 9

New, additional coupling among M1-M3- auxiliary busbars PROTECTION ISSUE: ELECTRO-MAGNETIC COUPLING BETWEEN BUS-BARS A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

PROTECTION ISSUE: ELECTRO-MAGNETIC COUPLING BETWEEN BUS-BARS Cross-talk between superconducting circuits due to inductive and capacitive coupling Only an issue during fast current discharges with some 100 As-1 Estimates indicate that over the concerned bus-bar length ca 180  V apparent voltage may be induced nQPS nominal threshold for splice protection will be U TH = 300  V with 10 seconds reaction time permitted Two cases to be considered: M1 versus M3 and spools versus M1/M3 A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

PROTECTION ISSUE: ELECTRO-MAGNETIC COUPLING BETWEEN BUS-BARS Case1: M1 and M3 Potential trigger of nQPS (splice protection only) systems during fast discharges Concerned systems do no activate quench heaters Global circuit protection will initiate fast circuit discharge if any of the main circuits is triggering -> no issue for LHC exploitation Case 2: M1/M3 and spools Between M1/M3 and spools A trip of a spool piece circuit must not cause a fast discharge of one of the main circuits Spool piece bus-bars are currently routed close to M1 and M2 So far no major problems observed but no guarantee for the new case (needs to be verified experimentally) Eventual coupling effects could be mitigated /ruled out by additional instrumentation A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

PROTECTION ISSUE: REVISED PROTECTION SCHEME In principle the protection of the new bus-bar segments and splices could be assured by the existing protection units but … Neighboring QPS locations have to be modified introducing a singularity in the QPS protection scheme By this the protection of the original segment will be weakened No possibility other than raising thresholds to overcome problems related to cross-talk or other EMC related perturbations (e.g. collimator operation …) Change of thresholds not recommended for LHC running with nominal powering parameters No separate protection or diagnostics for the newly installed components New type of cryostat etc. -> enhanced diagnostic capabilities desired A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

PROTECTION ISSUE: REVISED PROTECTION SCHEME Implement dedicated protection module allowing decoupling and supervision of the busbars and interconnections routed through the new cryostats Add two redundant twisted pairs per interconnection in lines M1, M2 and M3 12 x 2 twisted pairs per QTC  design is critical for the overall electrical integrity and protection efficiency One or two IFS boxes required depending on integration Additional taps can be used as well for the quality assurance and electrical warm No additional taps required for spool piece bus-bars protection Nevertheless very useful for diagnostics -> implementation to be considered A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

FIELD ERRORS: POSSIBLE IMPACT ON OPERAIONS Detailed calculations were performed by S. Russenschuck A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

FIELD ERRORS: POSSIBLE IMPACT ON OPERAIONS Field components in standard interconnection region and in the new cryogenic by-pass No issue for the field quality, if we consider the length of this cryostat with respect to the length of all standard interconnection. A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

OTHER OPERATIONAL CONSIDERATIONS Risks for operation start-up The new cryogenic by-pass introduces significant modification to the main and spool LHC magnet circuits around point 3 Additional QPS hardware to be installed, integrated and tested New cabling Risks for operation More hardware in the tunnel impacts always on reliability & maintenance Increased coupling between busbars in conjunction with existing and new noise sources can cause additional, spurious trips impacting on the machine integrated luminosity A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/

CONCLUSIONS The new cryogenic by-pass introduces an electrical singularity to several magnet circuits in point 3 Protection issue can be mitigated by implementing dedicated protection module allowing decoupling and supervision of the busbars and interconnections routed through the new cryogenic by-pass Lessons learnt during the LHC project were taken into account in the electrical design principles of the new cryogenic by-pass reuse of validated designs like central part of the busbars Improved design of all known weak points like: lyres, interfaces and transitions, fixtures, etc. Electrical modifications of circuits introduced by the new cryogenic by-pass seem to be of no major operation concern A. Siemko - Electrical circuit modification Review of the cryogenic by-pass – 26/05/