The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
D. Passarelli, M. Merio, L. Ristori, B. Wands March 29, 2012
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
FE calculations for the bolted helium vessel May 6th 2015
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
DQW Cryogenic Magnetic Shield Internal Review Niklas Templeton 06/05/15.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
Ofelia Capatina on behalf of the CERN specification team
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
D. Passarelli, M. Merio, L. Ristori, B. Wands March 13, 2012
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
Cavity design Fundamental parameters : frequency, beta, number of cells (gaps), Eacc Optimisation : R/Q, surface fields / Eacc, Qex, damping of HOMs, kloss,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
ESS cavities interfaces
Page 1 Jean Delayen HyeKyoung Park Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Cavity support scheme options Thomas Jones 25/06/15.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Blade Tuner L. Lilje for the INFN colleagues. Disclaimer The slides were prepared by R. Paparella and N. Panzeri for Carlo Pagani who could not attend.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
Status of Activities at CERN
Cavity support scheme options Thomas Jones 1. Introduction Both cavities will be supported by the fundamental power coupler and a number of blade flexures.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
56 MHz SRF Cavity and Helium vessel Design
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Cavity support scheme options Thomas Jones 25/06/15 1.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Gravity load on SAS – comparison between real and mock-up April 13 th, 2016.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
CERN – Zanon discussions
Fredrik Fors Mechanical Engineering, JLab 04/22/2016
Stress and cool-down analysis of the cryomodule
at STFC Daresbury laboratory
T5.2: Harmonization - Material and Component Reference
Crab Cavity HOM Coupler Specification Drawings & Tolerances
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Fredrik Fors Mechanical Engineering, JLab 09/29/2016
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
CERN Cryomodule Requirements for Crab Cavities
UK RFD Pre-Series cryomodule
326MAE (Stress and Dynamic Analysis) 340MAE (Extended Stress and Dynamic Analysis)
Magnetic shielding and thermal shielding
Presentation transcript:

The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Helium Vessel and Tuning for the UK 4Rod Cavity Thomas Jones, STFC, Daresbury Laboratory

Contents Helium vessel conceptual design Helium vessel conceptual design Vessel manufacture Vessel manufacture Tuning Tuning Pressure vessel analysis Pressure vessel analysis Magnetic shielding Magnetic shielding 2

Helium vessel conceptual design Helium Vessel made from Grade 5 Titanium (Ti-6Al-4V) Helium 2-Phase line Input coupler port Modified Saclay II tuner Stiffening ribs Magnetic shield (Cryoperm) not shown Additional beam tube required for LHC installation Mounting for support system UK 4 Rod Cavity Port for He level probe 3 194mm 550mm 300mm

LOM coupler port Titanium bellows to allow cavity compression when tuning Nb-Ti transitions e-beam welded during cavity manufacture. Naked cavity prior to He vessel installation Rectangular flange to required for tuner. HOM coupler port 4

Sealing technology for beamlines and LHe lines yet to be determined. Currently shown as Conflat flanges. Bent 6mm thick Ti-6Al-4V sheet 40mm deep x 10mm thick Ti-6Al-4V Stiffening ribs 10mm thick Ti-6Al-4V End plates 30mm thick Ti-6Al-4V Mounting blocks for tuner Vessel Manufacture All joints in vessel to be TIG welded 5 420mm

Tuning concepts – RF analysis Longitudinal Tuning 1.1 MHz/mm Vertical Tuning 0.03 MHz/mm Plunger Tuner 0.1 MHz/mm

Tuning - FEA 11kN was applied to try to close the gap between rods. The maximum deformation in the cavity was 0.24mm, however, the movement of the rods was actually a rotation about Point A. The maximum stress it at the room temperature Yield of 75MPa. Coupler ports prevent full cavity deformation, as they are fully fixed to He vessel. 7 11kN A Maximum stress of 73MPa here. Bellows and flanges removed to simplify geometry

The FERMILAB Summary of Niobium material properties states that the acceptable stress limit for Nb at 2K is 137MPa. The danger with using this limit is that if the tuner ‘sticks’ at cryogenic temperatures when the module warms up the yield stress of Nb returns to 75MPa the cavity will be plastically deformed. This, however, may not be a disadvantage as it can be used to permanently tune the cavity. Below is the result of applying 20kN tuning force to the cavity beam pipe. The rods rotate about point A by 0.14°. The deformation perpendicular to the beam direction is 0.36mm (Next slide), the maximum deformation is 0.45mm and the maximum stress has reached 133MPa. Tuning - FEA Von-Mises equivalent stressTotal deformation 8 20kN 0.4mm A

Realistic Tuning – RF analysis Maximum lateral movement is 360 microns with a 130 MPa stress. This is a 0.14° rotation. Frequency tuning was studied in a simplified model. The frequency shift per mm of transverse offset is 0.3 MHz/mm so tuning range with current design is 108 kHz. Tuning in both directions would give +/-108 kHz, so total range of 216kHz. Using a tuner on both sides could give a total range of +/- 250kHz. Further work will be completed to improve the tuning range and also limit the force required by the tuners. This will involve thinning areas to give more deformation, while staying within pressure vessel regulations.

Tuning with Saclay II design Above images ref: Oliver Kugeler, ERL07, Daresbury, May Tuner successfully tested to 7KN, analysis of tuner will be required to ensure 10KN+ operation. Experience with tuner and piezo active tuning system gained on Daresbury International Collaborative Cryomodule project 10 Modified Saclay II tuner installed on DICC module built at Daresbury. Stiffness test of modified Saclay II design at Daresbury.

Tuning with Saclay II design Above images ref: Oliver Kugeler, ERL07, Daresbury, May Tuner successfully tested to 7KN, analysis of tuner will be required to ensure 10KN+ operation. Experience with tuner and piezo active tuning system gained on Daresbury International Collaborative Cryomodule project 11 Modified Saclay II tuner installed on DICC module built at Daresbury. Stiffness test of modified Saclay II design at Daresbury.

Saclay II design integration Piezo units Tuner width increased to suit He Vessel geometry Eccentric cam Stepper motor in its own magnetic shield Ribs support He vessel under tuning loads Use of an additional tuner on this side would increase tuning range, and give symmetric deformation, but will bring additional costs, practibility and synchronisation issues. 12

Pressure vessel analysis – Mesh, Load and Boundary conditions Fully fixed point Point fixed in upwards and lateral direction. Free in longitudinal Point only fixed in upwards direction. Outer He vessel modelled as Grade 5 Titanium Young’s modulus 113GPa Poisson’s ratio Cavity modelled as Niobium Reactor grade Type 1, UNS R Young’s modulus 100GPa, Poisson’s Ratio MPa applied to all internal surfaces, to simulate a 2 Bar internal pressure test. 13

Pressure vessel analysis – Results Max stress in Niobium 60MPa which is below allowable 70MPa calculated by Yield Stress/1.05. Ref: BS EN :2002, Part 3. Max stress in model 76MPa but in Ti-6Al-4V tank which has a Yield Strength of 820MPa. Largest deformation 0.58mm (shown in red) Vessel as designed is suitable for 2 Bar gauge internal pressure test. Note: If beam tube is evacuated during test gauge pressure of 1 Bar should be used as this means 2 Bar absolute pressure on cavity. Ref: BS EN :2002 +A11:2006 Unfired pressure vessel Part 3: Design 14 Bellows and flanges removed to simplify geometry. Bellows purchased will be rated for 2 bar internal gauge pressure and 1 bar external pressure.

Pressure vessel analysis – Validation DL FEA CERN FEA Same load of 0.2MPa applied to all surfaces as used by CERN in their structural assessment of the cavity. This was calculated by multiplying the relief valve pressure of 1.5 Bar by the relevant safety co-efficient of 1.43/1.1 (=1.3). Ref: CERN Strength assessment and design review of the CRAB/LHC superconducting Nb cavities. Shown below is an FEA of the naked cavity model by the Daresbury Laboratory compared to the CERN model. The results are within 5% error and therefore validate each other. 1.37mm Deformation1.33mm Deformation 15

Magnetic Shielding 16 1 layer of 2mm thick Mu Metal 1 layer of 1mm thick Cryoperm Analysis by Magnetic Shields LTD Shielding shown gives 36x attenuation of the external magnetic fields. Considering the Earths magnetic field only this gives a <14mG resultant field at the cavity.

Conclusions and Further work Concept for UK 4 Rod cavity He vessel has been designed. Concept for UK 4 Rod cavity He vessel has been designed. The concept uses a TIG welded Ti-6Al-4V tank with Nb-Ti transition pieces e-beam welded to the cavity. The concept uses a TIG welded Ti-6Al-4V tank with Nb-Ti transition pieces e-beam welded to the cavity. Analysis of tuning the cavity has been performed. Using the current design a tuning range of +/-250kHz could be achieved, but may be impractical. Analysis of tuning the cavity has been performed. Using the current design a tuning range of +/-250kHz could be achieved, but may be impractical. Further work will be performed to reduce the tuning force required on the cavities and to improve the range of tuning. Further work will be performed to reduce the tuning force required on the cavities and to improve the range of tuning. The viability of using a Saclay II tuner has been investigated. The viability of using a Saclay II tuner has been investigated. Finite Element analysis has been used to ensure the He vessel meets the British Standard for pressure vessels. Finite Element analysis has been used to ensure the He vessel meets the British Standard for pressure vessels. A scheme for the magnetic shielding has been devised, however, a 3D conceptual model of the shielding around the He Vessel is required. A scheme for the magnetic shielding has been devised, however, a 3D conceptual model of the shielding around the He Vessel is required. 17