Investigation into the I_MEAS fault trip of RTQX2.R5 at 13:30 June 3 rd and RTQX2.R1 at 7:28 June 7 th Quentin King Pierre Déjoué June 6 th 2011.

Slides:



Advertisements
Similar presentations
MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
Advertisements

Branching, Switching and tagging Francesco Furfari CNR-ISTI Italy.
UK egamma meeting, Sept 22, 2005M. Wielers, RAL1 Status of Electron Triggers Rates/eff for different triggers Check on physics channels Crack region, comparison.
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
Intraship Integration Control Instructor: TV Prabakar.
A Brief Overview of LabVIEW Data Acquisition (DAQ)
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 10 Monday 2/19.
SEG Software Maintenance1 Software Maintenance “The modification of a software product after delivery to correct faults, to improve performance or.
11 Lecture Slides ME 3222 Kinematics and Control Lab Lab 2 AD DA and Sampling Theory By Dr. Debao Zhou.
Software Reliability Growth. Three Questions Frequently Asked Just Prior to Release 1.Is this version of software ready for release (however “ready” is.
Software Quality Assurance Lecture #8 By: Faraz Ahmed.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Lesson 14: Installing and Uninstalling Programs how to install a new program what to do if the new program doesn’t work how to uninstall a program © CCI.
Reliability Andy Jensen Sandy Cabadas.  Understanding Reliability and its issues can help one solve them in relatable areas of computing Thesis.
8-Oct-154/598N: Computer Networks Shared Access Networks Token Ring ATM Fibre channel Myrinet.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Testing E001 Access to Computing: Programming. 2 Introduction This presentation is designed to show you the importance of testing, and how it is used.
1 Lab 5: Controls and feedback. 2 Lab 5: Control and Feedback This embedded system uses the Photo sensor to detect the light intensity of the environment.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
ICALEPCS 2005 Advanced uses of the WorldFIP fieldbus for diverse communications applications within the LHC power converter* control system Quentin King.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
NIA LOAD Genetics Initiative Progress Report 2007: NCRAD and LOAD Update Kelley Faber, MS, CCRC National Cell Repository for Alzheimer’s Disease.
By Tony Hoff ECE 4220 – Real Time Embedded Computing University of Missouri - Columbia Course Instructor: Dr. Guiherme DeSouza.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
L4T Bending Power Converters: ‘ Implications of monitoring the current to 5% and 0.5%’ L4 BCC - 10 Nov 2011 David Nisbet TEEPC.
09/01/2016James Leaver SLINK Current Progress. 09/01/2016James Leaver Hardware Setup Slink Receiver Generic PCI Card Slink Transmitter Transition Card.
Error Handling Tonga Institute of Higher Education.
3 rd Party Registration & Account Management SMT Update To AMWG February 23, 2016.
MP3 report – week /05/2010 – 09/05/ actions MP3/QPS team in CCC LMC: 12 th of May 2010.
Transmission test for waveguide Hideyuki Sakamoto Tracker Phone Meeting, 25 th May,2006 Contents Method Measured luminosity Results and next step.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 6 Report Wednesday 6 th August 2008 Jack Hickish.
M. Adinolfi – University of Oxford – MAPMT Workshop – Imperial College 27 June Status of the PINT chip M. Adinolfi University of Oxford.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
CSE 481b Winter Today  Writing Assignment Update  Final Reflective Statement  Due March 14  750 words  Final Project Presentations  Delivering.
How to make a Line Follow program Using EV3 software and an NXT light sensor.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Pitch-to-MIDI Converter Project Presentation - II By Scott Stroupe and Andrew Rogers.
LHC RT feedback(s) CO Viewpoint Kris Kostro, AB/CO/FC.
 Software reliability is the probability that software will work properly in a specified environment and for a given amount of time. Using the following.
Week 3 Data Structures and Common Tools. Common Tools in Labview Automatic Tool Selector Using the Operating Tool Using the Positioning Tool to Select.
Contents  Samplers and OASIS  New Controls Platform & Strategy  CTF3 Mini Pilot Project  Concluding Remarks IEFC Workshop, March 2011 Rende.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 4 Report Tuesday 22 nd July 2008 Jack Hickish.
Fault Tolerance Comparison
2007 IEEE Nuclear Science Symposium (NSS)
Alberto Valero 17 de Diciembre de 2007
Wednesday 3rd October - morning
Drives Training Foils Encoder Module Installation
Burst Test Test-Bed LHC120A-10V 4 Quadrant Converter: Burst Tests
USB Project (6th August)
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
DDEC Reports 8.02 New Features and Improvements
Introduction to Computers
Fix Error 550 Connect at Customer Service Number to Fix Error 550 under expertise of tech Support team experts.
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Fix iTunes Error 11 Give a Ring on: Apple Mac Customer Support.
Error Quicken Message CC-800. Quicken one step update error With, of the regular mistake, they confront is the blunder message CC-800 while they refresh.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
Thursday 10th May - morning
Make Tax Time Easier on Everyone
Fault Recovery Time for C100 Modules Spring ‘16
Mon Access for switching temperature probe DFB L7.
Monday 3rd September - morning
TE-EPC PIQUET BAD MANIPULATION
Cold compressor speed S45
Presentation transcript:

Investigation into the I_MEAS fault trip of RTQX2.R5 at 13:30 June 3 rd and RTQX2.R1 at 7:28 June 7 th Quentin King Pierre Déjoué June 6 th 2011

RTQX2.R5 tripped on June 3 rd and RTQX2.R1 tripped on June 7 th The FGC software tripped the converters following a bad acquisition on one measurement channel. The software reported an I_MEAS fault even though I_MEAS was always good. This was due to a bug in the software: the check on the difference between I_A and I_B was not suppressed following the recovery of the bad channel. The current measurement difference is calculated at 1Hz from 1 second averages of I_A and I_B (which are acquired at 1kHz) So at least 1 second of valid measurements are needed before the measurement difference can trusted I_MEAS trip Q. King 2

The bad acquisitions were on I_A I_MEAS trip Q. King 3

Two samples were bad I_MEAS trip Q. King 4

The software correctly switched from using the average of I_A and I_B to just I_B for 200ms and then switched back I_MEAS trip Q. King 5 I_B only

I_DIFF So I_MEAS was always good and the handling of the bad acquisitions of I_A was correct Unfortunately the I_DIFF limit was checked at the start of the next second because I_A and I_B were again valid, but the bad I_A samples were poisoning the 1s average used in the calculation of I_DIFF The I_DIFF fault limit is 0.5A and the two bad samples resulted in a calculated difference of 4.6A. I_MEAS trip Q. King 6

I_DIFF exceeded the 0.5A threshold I_MEAS trip Q. King 7

Why the bad acquisitions? The ADCs are external to the FGC and send their data over fibres There was a defect in the fibre termination tool so all the fibres used with these external ADCs have a problem with the quality of the light transmission Bad acquisitions have been seen occasionally for some time and all 80 fibres concerned will be re-terminated in future technical stops with a new tool (~10 minutes per connector) If it wasn’t for this bug, these occasional acquisition errors would not have been a problem due to the redundancy of having two channels I_MEAS trip Q. King 8

Software fix A new version (V390) of the FGC software has been released which fixes this problem by suppressing the use of a channel until good acquisitions have been received for 1200ms. This guarantees that 1s averages used for the I_DIFF calculation will always be valid. This has been tested in the lab and the software no longer suffers from the vulnerability. The new version was released to all non-operating FGCs in the LHC on Tuesday morning. All concerned systems (with external ADCs) were updated so this problem should be solved. I_MEAS trip Q. King 9