 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
The Principles Of Lean Repair Dr David J Horton Copyright© 2011 Beta Management Systems - All Rights Reserved.
Relationship with Stakeholders External Customer Owners/Investors Internal Customer Internal Supplier External Supplier Statutory Agencies/ Government.
Part of a Training Module Series Part of a Training Module Series Kaizen Orientation Training.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
John Deere Supplier Development 1 Kaizen Training Competing in the Marketplace “What factors are important to the customer?” John Deere - Supplier Development.
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
Just-in-Time and Lean Systems
INDUSTRIAL & SYSTEMS ENGINEERING
CSUN - Prof. David Shternberg
MSE507 Lean Manufacturing
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
CONTINUOUS IMPROVEMENT PROGRAM
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Value Stream Mapping.
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
How to Effectively Implement Set-up Reduction in Any Organization.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Value Analysis/ Flow Analysis
LEAN system.
JIT and Lean Operations
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
A STRATEGY FOR PERFORMANCE EXCELLENCE
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Assembly Line Balancing
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
 Discussion 40 minutes  Break 10 minutes  Discussion 40 minutes  Will understand what Standard Work is, and is not  Will be able to study and understand.
Implementation of Lean at Rheem Manufacturing
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
Introduction to OEE (Overall Equipment Effectiveness)
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
7 Design of Work Systems.
LESSON 4 Process Improvement – Lean
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
A STRATEGY FOR PERFORMANCE EXCELLENCE
Pull Manufacturing and Just In Time
Reducing Designated Storage Area
Welcome to my presentation
5S and Visual Control 5 Elements of 5S Why 5S? Waste
A STRATEGY FOR PERFORMANCE EXCELLENCE
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
FACILITY LAYOUT Facility layout means:
A STRATEGY FOR PERFORMANCE EXCELLENCE
Competing in the Marketplace
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Mistake Proofing & Poka-yoke
(Lecturer in Mech. Deptt.)
A STRATEGY FOR PERFORMANCE EXCELLENCE
Work Measurement and Lean Application
A STRATEGY FOR PERFORMANCE EXCELLENCE
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Implementation of Lean at Rheem Manufacturing
A STRATEGY FOR PERFORMANCE EXCELLENCE
Presentation transcript:

 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE

 2000, QualityToolBox.com, LLC, all rights reserved Executive Overview Participant manual Tools Workbook Knowledge Breakthrough Lecture notes Performance Excellence Series Training Module Elements

 2000, QualityToolBox.com, LLC, all rights reserved Table of Contents Knowledge Breakthrough Session 1.0Introduction…………………………3 Session 2.0Wastes Elimination…………………7 Session 3.0One-piece flow…………………….26 Session 4.0Single Minute Exchange of Dies…..65 Session 5.0Visual Control and Workplace Organization……………………… 78 Session 6.0Quality the first time, every time… 97 Session 7.0Total Productive Maintenance…...127

 2000, QualityToolBox.com, LLC, all rights reserved Is the continuous elimination of waste Continuous Improvement

 2000, QualityToolBox.com, LLC, all rights reserved What Does Kaizen Mean? KAI ZEN To modify, to changeThink, make good, make better = KAIZEN Make it easier by studying it, and making the improvement through elimination of waste. +

 2000, QualityToolBox.com, LLC, all rights reserved Why Kaizen Time CPI Project Time CPI Time Savings Process Improvement Project Implemented Maintenance of Process Performance Kaizen CPI (Continual Performance Improvement) Data Driven Methodology to Magnify Impact of Process Improvement Apply Control Techniques to Eliminate Erosion of Improvements Proceduralize/Standardize Improvements for Improved Maintenance of Critical Process Parameters Kaizen Use Small Teams to Optimize Process Performance by Implementing Incremental Change Apply Intellectual Capital of Team Members Intimate with Process CPI Projects Emphasize Control and Long Term Maintenance Kaizen Projects Emphasize Incremental Improvements

 2000, QualityToolBox.com, LLC, all rights reserved The Nine types of waste Overproduction Delays (waiting time) Transportation Process Inventories Motions Defective products Untapped resources Misused resources 9 Wastes

 2000, QualityToolBox.com, LLC, all rights reserved 1. Overproduction To produce more than is required * To produce before required * *Required by external and internal customers 9 Wastes

 2000, QualityToolBox.com, LLC, all rights reserved The Secret: Be Systematic Work with a versatile team Measure, evaluate Find the 5 Whys Follow up Standardize, make uniform Simplify Combine Prevent Make waste ugly Elimination of Wastes and Continuous Improvement

 2000, QualityToolBox.com, LLC, all rights reserved Exercise 1: Wastes Identification 1. List at least one example of each of the 9 categories of waste from a process within your organization. 2. Identify at least one possible cause for each of the specific wastes listed. 3. Propose one or more actions to reduce each of these wastes. 4. Identify methods of measurement to determine results of waste reduction efforts. Think Break

 2000, QualityToolBox.com, LLC, all rights reserved Exercise 1: Wastes Identification Think Break

 2000, QualityToolBox.com, LLC, all rights reserved Recognize our lead-times Identify their components Reduce them with the help of –the dedicated lines –a one piece flow Establish dedicated lines –in relation to family of parts –in relation to TAKT time Attain one piece flow We will learn to:

 2000, QualityToolBox.com, LLC, all rights reserved Delivery lead time This is life! If not, it’s torture… When the delivery lead-time is bigger than the manufacturing lead time: Manufacturing lead time Delivery lead time Manufacturing lead time

 2000, QualityToolBox.com, LLC, all rights reserved False appearance of a solution Solution… What is the solution? Generate and support stocks Delivery lead time Manufacturing lead time Delivery lead time Manufacturing lead time

 2000, QualityToolBox.com, LLC, all rights reserved Identify and eliminate all wastes in our manufacturing processes Example: manufacture a Total operations: 6 hours Mfg. lead-time: 40 days = 320 hours Difference:314 hours How to reduce the manufacturing lead time? Delivery lead time Manufacturing lead time ?

 2000, QualityToolBox.com, LLC, all rights reserved Example: manufacture a Total operations: 6 hours Mfg. lead-time: 40 days = 320 hours Difference:314 hours What are processes made of ? Delivery lead time Manufacturing lead time Storage, Transport, Waiting time 98%

 2000, QualityToolBox.com, LLC, all rights reserved Visual Control & the Workstation The 5 S To Sort Eliminate what’s not absolutely necessary To Sanitize Improvement of the workstation. Be organized to reduce clutter. To Straighten Ensure space for each thing, and a thing for each space. No more searching. To Sweep Maintain a clean and orderly space to make problems easily identifiable. Eliminate rejects and scrap.. To Sustain Maintain continuous effort. This is a way of life.

 2000, QualityToolBox.com, LLC, all rights reserved Visual Control & the Workstation Ergonomics Adapt the workstation to the employee - more security - more comfort Reduce waste - excessive fatigue - useless efforts and movement - less physical constraints

Kaizen for the Workplace Training and Sourcebook for Kaizen Worksheets

How to Use This Manual The continuous improvement tools that are presented in Sections 1-9 of this manual are shown in order of use. These forms MUST be completed in the order presented in this manual. Each section contains a brief description of the tool, its purpose, when to use it, who should use it, how to use it, and the expected results. Remember to focus on the elimination of waste. Strive to maximize yields and obtain cost reductions from existing machinery and equipment before “buying solutions”. Improve current systems and techniques before automation. Automating a system or practices without first having an understanding of the process will not solve underlying process problems. Perhaps the most important point to remember is that we must understand a process before we make any attempt in changing it. “No Tampering” is the first rule of continuous improvement. We can not tamper with a process without understanding it. By using these tools, we will all share a common and systematic approach for questioning, analyzing, proposing solutions, experimenting, and finally, implementing proven changes. “The problems that exist in the world today cannot be solved by the same level of thinking that created them.” Leadership Improvement Identify waste Measurement Kaizen Template

Time Observation Form

6. Once the actual cycle times are known, compare them to TAKT time. TAKT Time for measurable, repetitive task processes is calculated as follows: A. Calculate the total time available per shift, day, etc. excluding breaks and lunches. Let’s say that we have a full 8 hours available. 8 hours would equal 480 minutes or 28,800 seconds. B. Determine the required product quantity. [How many units have been sold] For this example, let’s use 395 units for the required production for this operation. C. Next, divide the total time available by the required production to arrive at the TAKT Time. 28,800 / 395 = 73 seconds per unit. D. Compare this TAKT time to the average cycle time of the observation. 1.If TAKT Time is greater than average cycle time, then we can conclude that the required production can be met within the total time available. However, we need to examine adding work from another process to minimize idle time. 2. If TAKT Time is less than average cycle time, then we can conclude that the required production cannot be met within the total time available. We must eliminate work through Kaizen or transfer work to another worker. How to use it