1 2015 RTP Update RPG Meeting July 21, 2015. 2 2015 RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.

Slides:



Advertisements
Similar presentations
NERC Footnote b / 12 – Load Loss
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Regional Planning Group Project
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
April 16, 2010 Regional Planning Group RMR Exit for Spencer 5 – Remedial Action Plans Chris Ngai Jay Teixeira.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Eau Claire Area Study Northern MAPP Subregional Planning Group January 11, 2007 Daniel Kline.
2015 RTP Update January, 2015.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
West Texas Congestion Chad Thompson Congestion Management Working Group August
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
ERCOT PUBLIC 10/21/ RTP Update October 21, 2014.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
ERCOT PUBLIC 10/21/ LTSA Update October 21, 2014.
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,
Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
Jeff Billo Manager, Transmission Planning
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
October, 2009 Congestion Report Isabel Flores. 2 October, 2009 Background Provide trend of local congestion costs for last 13 months Costs shown in millions.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
ERCOT Transmission Planning Overview
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Freeport Area Master Plan Project -
2016 RTP Update June, 2016 RPG Meeting.
Nacogdoches to Lufkin SS 345 kV Line Project
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Local Area Planning Update to TRANSAC – September 15, 2016
RMR Exit for Spencer 5 – Remedial Action Plans
Local Area Planning Update to TRANSAC – September 26, 2018
Presentation transcript:

RTP Update RPG Meeting July 21, 2015

RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete for the 2018, 2020, and 2021 summer peak base cases  G-1+N-1 and X-1+N-1 contingencies are being studied for 2018 minimum load and 2016 summer peak base cases Contingency 2015 RTP Base Cases 2016 summer peak 2018 min load 2018 summer peak 2020 summer peak 2021 summer peak ** Set 1 (P0, P1, P7) Completed *Completed ** Set 2 (P2, P4, P5) Completed *Completed ** Set 3 (P3 G-1, P6.2 X-1) In progress Completed * Constraint management plan such as, but not limited to, tap setting and shunt adjustment need to be developed ** Set 1: P0 (N-0), P1 (breaker-to-breaker N-1), and P7 (multiple circuit on a single pole) Set 2: P2 (segment outage, bus outage, internal breaker fault), P4 (fault with stuck breaker), and P5 (fault with non-redundant relay failure) where load shedding is not allowed. Set 3: P3 (Generator outage + N-1), P6.2 (Transformer Outage + N-1)

RTP update  Secure 2018, 2020 and 2021 summer peak base cases and list of preliminary projects were posted in the MIS  The 2015 RTP scope has been updated and posted in the MIS Location: anning >> 2015 Regional Transmission Plan Postings anning

4 Transmission equipment upgrades (2018, 2020, and 2021 summer peak base cases) * Projects identified in the 2014 RTP which were needed in 2015 RTP Upgrade needs identified by kV RTP Previously Identified* Line Addition Line Upgrade Transformer Addition Transformer Upgrade Reactive Additions (Capacitor, Reactor, STATCOM) Other Upgrades (Terminal Equipment, Bus tie breaker) -5-52

RTP Reliability Projects Project Description 1) TNMP Flat Top TNMP 138kV project* a). Tap existing Barilla-Solstice 138kV line b). Convert Flat Top TNP- Barilla Draw Tap 69 kV to 138kV c). Convert Barilla Draw Tap-TNMP IH kV to 138kV d). New 138/69kV transformer at TNMP IH 20 2)Ben Davis-Murphy 138kV line upgrade 3) Bosque Switch–Olsen 138kV line terminal equipment upgrade* 4)Firewheel-Apollo 138kV line upgrade 5) Trinidad SES- Oak Grove Tap 138kV line upgrade* 6) Seagoville Switch-Crandall POI 138kV line upgrade 7) Liggett Switch - Hackberry 138kV double circuit upgrade* 8)Killeen Switch-Belton 138kV line upgrade* 9) Northwest Carrollton-Lake Pointe TNP 138kV line upgrade* 10) Hicks Switch 345/138kV transformer addition* *Projects identified in previous RTP Studies 345-kV new additions/upgrades, 138-kV new additions 138-kV upgrades, 69-kV projects not shown

RTP Reliability Projects Project Description 11)Corinth-Highlands TNP 138kV line upgrade 12) Holt Switch-North Andrews 138kV Line upgrade 13) Addition of second 345/138kV transformer at Twin Buttes* 14) Addition of second 345/138kV transformer at Vealmoor 15) Addition of shunt reactor at Clayton 345kV station 16)Whitney 138kV bus tie upgrade 17) Carrollton Northwest 138kV breaker upgrade 18)Vernon 138kV capacitor bank addition 19) Cedar Crest Switch 138kV breaker upgrade* 20)Trinidad to Winkler 138kV line upgrade 21)Addition of shunt capacitor at Jones Creek 22)Obrien-Clodine 138kV line upgrade 23)Stryker Creek-Douglas 138kV line upgrade* kV new additions/upgrades, 138-kV new additions 138-kV upgrades, 69-kV projects not shown *Projects identified in previous RTP Studies

RTP Reliability Projects Project Description 24) Addition of second shunt capacitor at Velasco 138kV station 25)Hardy-North Side 138-kV line upgrade 26)Clodine-Barker 138-kV line upgrade* 27) Switched shunts at MaGill and Bay City 138kV stations 28) Stryker Creek to Nacogdoches 138-kV line upgrades* 29) Addition of third 345/138-kV transformer at Zenith* 30)Tri Country-Parkway 138kV Line Upgrade 31) Fayette River Pump-Weimar 138 kV Line Addition 32)Flatonia-Hallettsville 138kV line upgrade 33) Hamwolf-Medical Center 138kV Line Upgrade 34) Addition of shunt capacitor at Milton 138kV station 35) George West 138/69kV transformer upgrade* 36)Crystal- Carrizo 138kV line upgrade 37) Cross Valley Project 345/138kV transformer addition* kV new additions/upgrades, 138-kV new additions 138-kV upgrades, 69-kV projects not shown *Projects identified in previous RTP Studies

RTP Reliability Projects *Projects identified in previous RTP Studies kV new additions/upgrades, 138-kV new additions 138-kV upgrades, 69-kV projects not shown Project Description 38)Escondido-Eagle Pass 138kV line upgrade* 39)Escondido-Brackettville 138kV line addition* 40) Melon Creek-Tatton 138kV line upgrade and 138/69 kV transformer addition 41) Valero-Champlin-Sagan-Weil Trc 138 kV line upgrades, 138 kV line addition, and 138/69 kV transformer addition 42)Oaks 138/69kV transformer upgrade 43) George West-George West Switching Station 138kV line addition 44) Three River-Beeville-Tuleta 138kV line upgrade 45)Normanna- Beeville 138kV line upgrade 46) Addition of shunt capacitor at Bessel 138 kV substation 47)North Hill-Zia 345kV line addition 48) Koch Up River Road 138/69kV transformer upgrade 49) Addition of STATCOM at Pharr 138kV station 50) Addition of second 345/138kV transformer at South McAllen 51)Addition of 345/138kV transformer at Molina

RTP Reliability Projects Project Description 52)Miguel 345/138kV transformer upgrades 53) Addition of second 345/138kV transformer at Palmito 54) Fayette River Pump-Fayette Plant 138kV line upgrade kV new additions/upgrades, 138-kV new additions 138-kV upgrades, 69-kV projects not shown *Projects identified in previous RTP Studies

10 Next steps Case conditioning Initial start cases, and contingency list ready Set 1 (P1, P7), Set 2 (P2, P4, P5) contingency analysis for the base cases Set 1 (P1, P7), Set 2 (P2, P4, P5) contingency analysis for the base cases Set 3* (P3: G-1+N-1, part of P6: X-1+N-1) contingency analysis for the base cases Other reliability studies (e.g. sensitivity, short circuit, cascading, multiple element outage (P6, EE), long-lead time equipment, constraint management plan, etc.) Other reliability studies (e.g. sensitivity, short circuit, cascading, multiple element outage (P6, EE), long-lead time equipment, constraint management plan, etc.) Economic case preparation and analysis 2015 RTP Report * 2018 min load and 2016 summer peak base case studies are in progress Green box: complete Yellow box: in progress