N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker.

Slides:



Advertisements
Similar presentations
1. 2 Joy Nichols, Jennifer Lauer, Doug Morgan, and Beth Sundheim Harvard-Smithsonian Center for Astrophysics Eric Martin Northrop Grumman Space Technology.
Advertisements

Aerospace Engineering Department Texas A&M University, May/17/2002 VISNAV 3D (In Brief) Texas A&M University Aerospace Engineering Department May/17/2002.
M3 Instrument Design and Expected Performance Robert O. Green 12 May 2005.
Automated Celestial Systems for Attitude & Position Determination George Kaplan Astronomical Applications Department Astrometry Department U.S. Naval Observatory.
PRIMA Astrometry Calibration and Operation Plan PRIMA Astrometry Calibration and Operation Plan VLT-PLA-AOS draft Scope of the Document 
“T e s t I n g E I n s t e I n ’ s U n I v e r s e”
Adaptive Optics and Optical Interferometry or How I Learned to Stop Worrying and Love the Atmosphere Brian Kern Observational Astronomy 10/25/00.
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Amplitude Control: Closing the Loop in a Zero Path Length Difference Michelson Interferometer Michael G. Littman, Michael Carr , Laurent Pueyo, Jeremy.
James Webb Space Telescope and its Instruments George Rieke (MIRI Expert) & Marcia Rieke (NIRCam Expert) Steward Observatory, University of Arizona The.
James Webb Space Telescope and its Instruments John Stansberry Steward Observatory, University of Arizona The First Light in the Universe: Discovering.
Josephine San Dave Olney 18 August, July 1999NASA/GSFC/IMDC2  Appears to be Feasible  Requirements  Coarse Pointing baselined on NGST  Future.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Current progress of developing Inter-satellite laser interferometry for Space Advanced Gravity Measurements Hsien-Chi Yeh School of Physics Huazhong University.
The Relativity Mission, Gravity Probe B Experimental Design, Sources of Error, and Status Mac Keiser Snowmass 2001 July 4, 2001.
G O D D A R D S P A C E F L I G H T C E N T E R 1 GW Interferometry at Goddard Space Flight Center Jordan Camp NASA / Goddard Space Flight Center Jan.
A SEMINAR ON HUBBLE SPACE TELESCOPE PRESENTED BY: HARI OM ELECTRONICS & COMMUNICATION REG NO SECTION-C ROLL NO.– 123.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y APS Formation Sensor.
Final Version Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Eric Stoneking Paul Mason May 17, 2002 ACS.
BRITE-Constellation currently consists of two satellites, UniBRITE and BRITE-AUSTRIA (TUGSAT-1) and two satellites to be funded by the Canadian Space Agency.
Printed by ACS 2 Gyro Mode Data Analysis Cheryl Pavlovsky, Marco Sirianni, Ken Sembach, ACS Instrument Team and the 2 Gyro Mode Team.
HESSI Imaging Capability Pre Environmental Review Brian R. Dennis GSFC Tuesday, February 29, 2000.
Final Version John Martin May 13-17, 2002 Opening Comments Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
1 Solar-B Data Co-Alignment Plan T.Shimizu (NAOJ) Solar-B MO&DA Working Group Solar-B 4 th Science
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
The Observations of LAMOST Jianrong Shi NAOC 1/
1 of 28 A design study of a Cryogenic High Accurate Derotator.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
PLANETARY PROBE LASER PROPULSION CONCEPT 7 TH INTERNATIONAL PLANETARY PROBE WORKSHOP JUNE 2009, BARCELONA LE, T. (1), MOBILIA, S. (2), PAPADOPOULOS,
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
Gary Chanan Department of Physics and Astronomy University of California, Irvine 4 February 2000.
1 WB/lct CCD OVERVIEW Kepler will have 42 CCDs 2,200 column x 1,024 row full frame CCDs Field of View (FOV) > 100 square degrees (113 w/ vignetting)
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
To a brief summary E. Verroi and G. Naletto. The main problem is the instability of count rates in the 4 channels  Bad possibility of pointing the star.
GW Workshop - Linthicum, MD Dec No ITAR protected information Group 4: Alternative Measurement Concepts RFI Assessment Summary Evaluation Team:
Henry Heetderks Space Sciences Laboratory, UCB
Aura Science Team Meeting Mission Operations Working Group HIRDLS – Jim Craft, Chris Hepplewhite Oct 1 - 5, 2007 JPL, Pasadena, Ca.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Multiple Spacecraft Observatories for 2020 and Beyond: Breaking a Tradition of Four Centuries Webster Cash University of Colorado.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
FGS Astrometry in 2 Gyro Mode E. P. Nelan STScI B. E. McArthur McDonald Observatory, U. of Texas.
Large Dynamic Range Co- Phasing System Development for Segmented Telescope Mirrors Juan F Simar – ARC Phd Student Centre Spatial de Liège Université de.
SuperNova / Acceleration Probe System Engineering Mike Roberto and Mike Amato November 16, 2001.
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Telescopes Resolution - Degree to which fine detail can be distinguished Resolution - Degree to which fine detail can be distinguished Fundamentally an.
Super Star Tracker ISAL Study 28 January - 8 February 2002.
Extended Detector Cutoff Considerations WFIRST Project Office May
May 23, 2002John Mather, NGST1 Adaptive Structures and Scientific Missions John Mather Senior NGST Project Scientist May 23, 2002.
STARDUST 20 Nov 2003CERR - Shyam Bhaskaran1 of 10 STARDUST Project CRITICAL EVENTS READINESS REVIEW COMET P/WILD 2 ENCOUNTER Autonomous Nucleus Tracking.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y APS Formation Sensor.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Webster Cash Keith Gendreau and The Maxim Team MAXIM The Black Hole Imager.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker.
MAXIM Pathfinder IMDC Study 13 May Science Team Keith Gendreau Code 662 GSFC Webster CashUniversity of Colorado Ann ShipleyUniversity of Colorado.
Incorporating Hubble Servicing with NASA’s Long-Term Vision
LAI-FKSI Optical Sensitivity at 2µ wavelength
Lecture 19 Relativity Chapter 26.1  26.5 Outline
Polar Orbiting INfrared Tracking Receiver Overall Mission Review
Image Stabilization System (ISS)
SDO Flight Dynamics Subsystem
First Assessments of EUVI Performance on STEREO SECCHI
Henry Heetderks Space Sciences Laboratory, UCB
Micro-Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF)
Main information on the «WORLD SPACE OBSERVATORY» project
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Super Star Tracker Introduction to the ISAL Study H. John Wood 8 February 2002 Revised 15 February 2002

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp28 February 2002Super Star Tracker Science Requirements Two proposed projects: MAXIM and Stellar Imager are used to provide requirements on a generic star tracker. The instruments will be located at the L2 Lagrange point and require a stable reference at the level of 30 micro arc-seconds. This level of tracking must be held stable for hours to days. Instruments consist of Objective and Detector spacecraft separated by up to hundreds of kilometers.

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp38 February 2002Super Star Tracker Derived Requirements A laser beacon is attached to the objective s/c which appears as a star as seen from the detector s/c. “Telescope Assembly” involves flying the two s/c into alignment with the target. “Coarse Track” involves using the beacon and precision information on the positions of the two s/c in the inertial frame of reference to center the beacon in the super tracker FOV. “Fine Lock” uses the laser beacon and the inertial information on the detector s/c in a feedback loop to guide the “Telescope ensemble” on the target at the required 30 micro are sec level.

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp48 February 2002Super Star Tracker Trade Studies Six options were considered by the science team Of the six options, four were looked at in detail in the ISAL study: – 1. Similar to the Hubble Space Telescope Fine Guidance Sensors (FGS) – 2. Similar to Gravity Probe-B (GP-B) – 3. Similar to GP-B but with accelerometers – 4. Similar to StarLight (Kilometric Optical Gyro w/ 4 km perimeter Sagnac Effect)

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp58 February 2002Super Star Tracker Option 2 Initial Design Concept Both s/c have state-of-the-art star trackers (currently 1 arc-sec with 5 degree FOV) The objective s/c has a laser beacon with milliwatt output – beam divergence is ~ 1 arc min The detector s/c has a 30 cm aperture Schmidt- Cassegrain telescope with a 4-fold field detector for tracking of the beacon at the micro-arc sec level The FOV of the beacon tracker is ~15 arc sec Detector s/c has gyros with micro-arc sec capability

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp68 February 2002Super Star Tracker Option 2 Concept Con’t The tracking loop operates on “angles only” measurements by the gyros and the beacon telescope – Control involves either angle or translation of the detector s/c The study provides flow diagrams showing how the tracking measurements are made and how they feed into the s/c guiding loop

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp78 February 2002Super Star Tracker Additional Concepts A ”Science Mode Control Loop” was developed using input from the science instrument in addition to the beacon and gyro angles A “Beacon/Gyro Mode Control Loop” using only beacon input and gyro angles was developed using rolls and translations of the detector s/c only – This mode did not use information from the science instrument

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp88 February 2002Super Star Tracker Feasibility of the Concepts The beacon tracker can be done with today’s technology and is discussed in the Optics Chapter by Dennis Evans The gyros are based on Gravity Probe B and have a roadmap to production

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp98 February 2002Super Star Tracker Additional Engineering The signal to noise ratio of the beacon tracer was studied by Eric Young to verify the optical design developed by Dennis Evans – The diffraction limited performance in object space of the 30cm diameter telescope/quad tracker looking at a mwatt-level laser at a distance of 100km is 45 µarcsec – This is more than adequate performance The thermal evaluation by Wes Ousley showed that extreme structural stability is required between the attitude sensor and the instrument – Either extremely low CTE material would have to be developed or temperature control to fractions of a milli Kelvin would be necessary

Introduction I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y H. John Woodp108 February 2002Super Star Tracker Conclusion The ISAL engineering team was generally pleased that the instrument concepts derived could be developed using existing and near- future technologies No unobtainable technologies were required and those currently beyond state-of-the-art had credible roadmaps to fruition Advancements in technologies discussed could change which option would be pursued