Setup Reduction Module

Slides:



Advertisements
Similar presentations
Chapter 8 Setup Reduction.
Advertisements

Setup reduction / quick changeover
Business Process Management and Modeling. Two Key Aspects Tools for Today: Utilize effective methods to gather information and model workflows Tools for.
System Development Life Cycle (SDLC)
Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
SMED principles applied to Formula 1 racing
Productive Maintenance
1 Setup Reduction For CNC Principles Copyright 2001.
Lean Manufacturing Cellular Manufacturing One Piece Flow for Workteams
Achieving Changeover Flexibility Brigham Young University Prepared by: Kortney J. Jurado.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
 2000, QualityToolBox.com, LLC, all rights reserved 1 A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment,
Just-in-Time and Lean Systems
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
System Development Life Cycle (SDLC)
Setup Time Reduction Using: Single Minute Exchange of Die G.V. Clarke Lean Quality Assoc., LLC 7/20/20151Copyright-Lean Quality Associates, all rights.
SETUP IMPROVEMENT. Setup: Definition The setup includes everything, all elements and time from the last good piece of the previous job until the first.
How to Effectively Implement Set-up Reduction in Any Organization.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Quick Changeovers & SMED
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Chapter 8: Systems analysis and design
Chapter 8 Setup Reduction.
Analyze Improve Define Measure Control Improve L EAN S IX S IGMA L EAN S IX S IGMA Ensuring Value (Part 2)  Quick Changeover / Set-up Reduction.
LEAN system.
© Copyright 2012 Tag and Label Manufacturers Institute, Inc. All Rights Reserved. Title of Presentation | Presenters Name Set Up and Waste Reduction Young.
Single Minute Exchange of Dies
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
Operation Analysis INSY 3021 Auburn University Spring 2007.
Drill Press 09 Setup Reduction Kaizen Blitz September , 2002 Casey Backyard ProductsDrill Press 09 Setup Reduction Kaizen Blitz.
Single Minute Exchange of Die OR Quick Changeover
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
 System Development Life Cycle System Development Life Cycle  SDLC Phases SDLC Phases Phase 1: Preliminary Investigation Phase 2: Feasibility Study.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Lean Training Quick Changeover.
The techniques involved in systems analysis Explanation of a feasibility study:Explanation of a feasibility study: –economic, –legal, –technical, –time.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Production.
Project Chiron SMU TEAM ALCON
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
IET 330 Industrial Design Group 4 Improving Efficiency and Productivity at SealMaster Elizabeth McClain Richard Cantrell.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Changeover Plan & Tools Hancor Changeover Team Notes for Discussion December 2, 2004.
Quick Changeover/ SMED Process May 16, 2011 Jason Cox Chief Technical Officer Cox Machine, Inc.
Operations Management JIT & Lean Systems
Objectives What is Changeover?
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Changeover Single Minute Exchange of Dies
UNIT-III Operations Management PREPARED BY CH. AVINASH.
LEAN ORGANIZATION SUMMARY
Quick Changeover.
Total Productive Maintenance and Quick Changeover
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Just-In-Time and Lean Production
Setup Reduction -- Creating More Production Time Dr. Richard A
Project Chiron SMU TEAM ALCON
Quick Changeovers Definitions Analysis and Methods GEOP 4316.
PROJECT SCOPE Scope : SMT Machine in both plant I and plant III.
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Quick Changeover Techniques
Project Chiron SMU TEAM ALCON
Summer Training Department of Industrial Engineering
SMED ( One Step Setup) A STRATEGY FOR PERFORMANCE EXCELLENCE
Quick Set-Up Technique
What If Process is Your Problem?
Quick Set-Up Technique
Presentation transcript:

Setup Reduction Module The benefits of quick changeover Meet customer needs CIPP Buyouts (more time for output) Smaller lot sizes Reduced inventory Reduced cost On time delivery Production smoothing Waste elimination Higher quality Increase cash flow Flexibility in scheduling Reduce lead time Increase profitability

Definition of Setup Time The amount of time taken to change a machine from the last part of a production lot to the first good part of the next production lot. Including gauging and fine tuning Clock time, not labor time.

Typical Setup Process Gathering necessary items 25% Exchanging parts 10% Positioning parts 20% Making adjustments 45% The biggest opportunity for improvement is in reducing the look time for gathering items and eliminating the need to make adjustments.

Setup Reduction Terminology Internal Setup Work that must be done while the machine is stopped External Setup Work that can be done while the machine is running Equipment List List of all tools, gages, fixtures, etc. necessary to complete the setup Intermediate Jigs Plates, spacers, or frames that eliminate the need to make major changes during the setup SMED Single minute exchange of dies-----the goal of all setup reduction projects

Setup Reduction Step 1 Separate the work that must be done while the machine is stopped (internal setup) from the work that can be done while the machine is running (external setup). Create a list of all setup activities and label whether they are internal or external. Example: Move material into work area E Loosen 6 cap screws I Remove chuck jaws I Remove work stops I Change inserts I Get part prints E

Setup Reduction Step 2 Reduce internal setup by doing more work externally. Determine the baseline time necessary to complete each setup element. Next determine the true function and purpose of each internal setup element and brainstorm ways to do them externally or eliminate. Prepare dies, fixtures, and gages outside the machine environment while the old parts are still being machined. Necessary tools should be gathered and laid out in proper sequence of use while the machine is still running old parts. Use setup carts when appropriate. Minimize the number of adjustments by standardizing, using dowel pins, and precision locators etc. Duplicate tooling and equipment can be pre-adjusted while the old parts are running.

Setup Reduction Step 3 Streamline all internal and external elements that have been recognized as still necessary. Make sure that the setup elements are being done in the most advantageous order and means possible. Simplify or eliminate the need for adjustments and tweaking by developing gadgets, set blocks. Use quick change tooling such as chuck jaws, commonize nuts, bolts, and hardware. Use a setup team approach if necessary to reduce the time the machine must be down during the setup. Involve many disciplines such as toolmakers, processors, operators, quality, and IE’s

Setup Reduction Step 4 Fine tune all elements of the setup by training the operators and timing the new setup process. Again look for ways to reduce the time of the longest elements. Retime and observe until the operator has the new process nailed. “Operating Room” analogy Once the new setup procedure is defined create a SOP (Standard Operating Procedure) that is laminated and posted at the machine for use by all operators.

Key Activities Set an improvement target Observe the setup as is Brainstorm improvements Create action item list Prioritize implementation Assign Tasks to team members Develop new procedure Perform & time new procedure Train all operators Repeat the setup---practice and retime until all operators are efficient at the new procedure Create SOP, laminate and post

Setup Reduction Techniques Use color coded equipment Commonize components Commonize wrenches Use air or cordless tools Use hydraulic or air clamping Use digital pictures to document SOP Use precision locators Die carts Shadow boards Organize and label all equipment Use a video camera Use PERT to define the critical path Eliminate the setup altogether by using dedicated machines if possible