1 Timing and RF Distribution NLC -> ILC Josef Frisch.

Slides:



Advertisements
Similar presentations
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
COMMUNICATION SYSTEM EEEB453 Chapter 3 (III) ANGLE MODULATION
FREQUENCY SHIFT KEYING
Femtosecond Pump / Probe Operation and Plans at the LCLS
Introductory comments on: “ How will the low level rf systems required for bunch compression, cavity tuning, machine protection, etc. be designed so as.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Fiber-Optic Communications
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Synchronization System for LUX John Staples, LBNL 26 July 2004.
RF Synchronisation Issues
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Chapter 6 FM Circuits.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Additional RF system issues: Amplifier linearization Reference Phase distribution Master Clock Anders J Johansson Lund University.
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Phase noise measurements in TRIUMF ISAC 2 cryomodule K. Fong, M. Laverty TRIUMF.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
RF Synchronization, control and stability Takuya Natsui.
Motivation Yang You 1, Jinghong Chen 1, Datao Gong 2, Deping Huang 1, Tiankuan Liu 2, Jingbo Ye 2 1 Department of Electrical Engineering, Southern Methodist.
1 Chelmsford Amateur Radio Society Advanced Licence Course Murray Niman G6JYB Slide Set 6: v1.01, 1-Oct-2004 (4) Transmitters - Principles & Synthesisers.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
CE 4228 Data Communications and Networking
Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
Chapter 10 Optical Communication Systems
Volker Schlott SV84, LL-RF Workshop, CERN, October 11 th, 2005 Femto-Second Stable Timing and Synchronization Systems Volker Schlott, PSI Motivation –
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
1 Chelmsford Amateur Radio Society Advanced Licence Course Carl Thomson G3PEM Slide Set 22: v1.0, 1-Oct-2004 (10) Measurements-2 - Frequency Chelmsford.
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
Injection Locked Oscillators Optoelectronic Applications E. Shumakher, J. Lasri, B. Sheinman, G. Eisenstein, D. Ritter Electrical Engineering Dept. TECHNION.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
JgimenoIWM-12/1/2004 Fiber Optic module 1 STUDIES AND DEVELOPMENT OF A FIRST FIBER OPTIC MODULE PROTOTYPE Javier Gimeno Vicente.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
1/19/2006Frank Lenkszus Advanced Photon Source 1 ILC Timing Frank Lenkszus Controls Group Advanced Photon Source Argonne National Lab.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
FM TRANSMITTER Punjab Edusat Society. FM TRANSMITTERS Frequency modulation technique is used. In FM frequency of the carrier is varied in proportion with.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Prof. Alfred J Bird, Ph.D., NBCT Office – Science 3rd floor – S Office Hours – Monday and Thursday.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
April 12 | Comparison of Sophisticated Synthesizer Concepts and Modern Step Attenuator Implementations | 2 Comparison of Sophisticated Synthesizer Concepts.
FUNCTION GENERATOR.
LCLS_II High Rep Rate Operation and Femtosecond Timing
ILC Phase Reference Distribution R&D
RF Synchronisation Issues
WP02 PRR: Master Oscillator and RF Reference Distribution
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
PART 3:GENERATION AND DETECTION OF ANGLE MODULATION
CEPC RF Power Sources System
Transmitters Advanced Course requires a detailed knowledge of Transmitters and Receivers This session covers Transmitter Block Diagrams, Oscillators and.
LCLS RF Stability Requirements
High Precision SC Cavity Alignment Diagnostics with HOM Measurements
Status of TTF HOM Project Aug 9, 2005
Breakout Session SC3 – Undulator
Presentation transcript:

1 Timing and RF Distribution NLC -> ILC Josef Frisch

2 History RF phase and timing distribution concept developed for NLC Prototype of phase stabilized long fiber links tested Redundant high reliability design concept developed Many design concepts transfer to ILC Note: Presentation is a slightly updated version of the NLC system (without much reference of the current ILC timing / phase distribution designs). Discussion to focus on Availability / Reliability.

3 Requirements (for purposes of discussion – NOT a specification) RF phase distribution with stability to ~ 1 picosecond peak to peak. –The compressor has tighter requirements which may require a special system. Trigger timing distribution with stability to a fraction of a cycle of L-band: 100ps peak – peak (~30ps RMS). –This is to allow resynchronization circuits to reliably select a single cycle of L-band. Single point failure resistant.

4

5 Components: Fiducial Generator The machine is assumed synchronized to a 5 (or possibly 10) Hz fiducial. The fiducial generator would be enabled under software control, synchronized to the 60Hz power line, and to the 1.3GHz RF. This is a single point failure, but there is only one unit in the accelerator, so the failure rate is expected to be low.

6 Components: Master Oscillator This must be low noise 1.3Ghz oscillator. A variety of technologies are available, for example Sapphire disciplined by Rubidium or GPS. PSI specifies a sapphire based oscillator at –-120dBc/Hz at 100Hz –-152dBc/Hz at 1KHz –-160dBc/Hz at 10KHz and above. This should meet ILC phase noise requirements. The Master Oscillator is a single point failure, but there is only one unit, so failure rate is expected to be low.

7 Fiber Links Point to Point links using standard telecom fiber. 1550nm laser diode source, modulated at RF –357MHz for NLC test, 1300MHz OK for ILC. Fiber spool in oven for fiber length compensation.

8 Phase shift for 10 degree C fiber change, 1 month (note 1 degree X-band = 250 fsec).

9 Components: Fiber Transmitter (1) Use conventional Telecom laser diode at 1550nm, directly modulated with RF. –NLC tests done at 357MHz –Modern diodes OK for direct 1.3GHz modulation, and have (20dB) lower noise –Best to pulse diode so that reflected power measured with transmitter off. Note, must limit transmitter power to ~ 1mW, or get nonlinear effects in fiber which degrade performance. Fiber length compensation using ~5Km spool of fiber in oven –Requires few X 100 Watts: –Continuously cool, heat with fan and wire grid. Get ~10 second time delay from fiber. (with integration term). Easy to close feedback loop Reflected phase measurement same as for receiver. Use downmix and digitizer system. Fiber transmitter is broad band, so fiducial can be applied as a bipolar phase shift to the RF. System cost low – all conventional components (except oven!). Requires ~6 rack units per transmitter.

10

11 Components – Fiber transmitter (2) Ovens are “unpopular”: large and consume power Alternate scheme: Use wavelength tunable fiber working against the fiber dispersion. –Need approximately 4nm/C tuning range, with 0.5pm wavelength resolution. –Available commercially 100nm range, without mode hops,.02pm resolution. Cost ~$25K. (From New Focus). Expanded use of DWDM telecom systems may substantially reduce the price of tunable laser systems. Scheme was briefly tested for NLC and worked, but at that time wide band, hop free tuning was not available. Probably this is the technology of choice as the laser costs decrease.

12

13 Fiber Transmitter Reliability Transmitters are redundant. Auto fail over is performed by the phase comparison unit. Transmitters can detect broken fibers from reflected signal –In principal can automatically TDR fiber to help quickly find break or reflection.

14 Components: Fiber Long haul fibers can use standard SMF-28 telecom fiber. Need low reflections – want fusion splices, not connectors except at transmit and receive chassis. Note that standard SMF-28 fiber is about as radiation sensitive as a human: a few hundred Rads can degrade its performance. –This varies dramatically with the exact fiber composition. Need to test transmission system with real installed fiber.

15 Components: Fiber Receiver Simple Converts optical to electrical signal Re-generates fiducial Error checking on optical signals Redundant, fail over in phase comparison unit.

16

17 Phase Comparison Unit Located at the “crate” level –System design should allow accelerator operation with a failed “crate”. Local narrow band Phase Locked Loop –Lock to either fiber system –Standby system has phase shifted to match active system –Prevents sudden global phase shifts (MPS issue) Diagnostics to determine which fiber system is bad Must be relatively low cost – high multiplicity item.

18

19 Phase Compare Unit – detecting failed channel If channel signal level drops, or if fiducials are not detected. Phase noise relative to narrow band VCO If slow drift is detected, use head / tail monitors, or beam phase measurement to decide Phase shifter on standby channel allows smooth changeover

20 Phase Control Unit: Low Noise VCO Need good narrow band noise to allow phase memory between pulses Need low cost since this is a high multiplicity unit. Commercial multiplied VCXOs –Integrated phase noise few ps at 1Hz –Slew rate limit PLL feedback for MPS to prevent sudden beam phase shifts –Can detect noise in fibers at frequencies above ~30Hz

21 Head / Tail Monitor Phase detection to compare neighboring sectors. Used in conjunction with Phase Comparison units to detect failed fiber transmission systems.

22 Beam Phase Monitor Can use Monopole HOM modes. –(have a hammer, everything looks like a nail!) Data taken at TTF as part of HOM alignment / BPM experiments –Experiment was primarily looking at Dipole modes – Monopole modes were only used for testing system Directly digitize cavity HOM signals with fast (5Gs/s) scope Look at phase of HOM Monopole modes relative to 1.3GHz phase reference HOM modes are a good detector – high Q and mechanical stability (in helium) give accurate measurement.

23

24 HOM phase results / comments 1.4 ps RMS for each mode. Mode difference 1ps RMS -> mode noise of 700fs RMS Can probably do much better with an optimized system. HOM couplers also see 1.3GHz signal in cavity. –Provides a direct comparison of 1.3GHz vs beam time. Electronics specific to monopole modes would be low cost (standard down-mix / digitize system) Effect of Lorentz detuning not known – could be a major problem for this type of measurement. –If so, can always use conventional phase cavities.

25 Triggers Assume triggers derived from 1.3GHz countdowns, reset by Fiducial. –1.3GHz too fast for present day programmable logic – limit few hundred MHz –Can work at a divided down frequency –Expect faster programmable devices by time ILC is constructed Countdowns similar to SLAC PDUs (now running at 476Mhz). Due to need to reset frequency dividers running at 1.3GHz, need trigger stability <100ps!

26 Issues / Conclusions Base technologies for a redundant phase and timing distribution system for the ILC have been demonstrated –Compressor phase is the exception! Needs R+D. Much engineering required to build a complete system Various alternate technologies available –Example is fiber laser based phase / timing distribution system developed at MIT and DESY. –Need to do detailed engineering to evaluate trade- offs.-