Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.

Slides:



Advertisements
Similar presentations
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Advertisements

Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AAE450 Spring 2009 Mass Savings and Finite Element Analysis (FEA) Preparation for Orbital Transfer Vehicle (OTV) 100 gram Case Tim Rebold STRC [Tim Rebold]
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
B. Donakowski UCB/SSLFIELDS iCDR – MEP Mechanical 1 SPP FIELDS MEP Main Electronics Package Mechanical Packaging Bill Donakowski
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
SPP FIELDS V5 Antenna Mechanical Peer Review Draft 2 David Glaser, Paul Turin, Jeremy McCauley, John Bonnell, Dennis Seitz SSL UCB 7/17/13.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
Southwest Research Institute NSF Conference on Small Satellites Plasma Instrument Miniaturization and Integration: Approaches and Limitations C.J. Pollock,
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
ASPOC & PICAM IWF/ÖAW GRAZ1 Main task  Development of hard- and software for flight instruments Main research topics 1.Magnetospheric MultiScale  Development.
AAE450 Spring 2009 Support structure for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
1 C osmic dust R eflectron for I sotopic A nalysis CRIA LAMA (A cria is a baby llama)
After considerable pushing and shoving, this configuration show some promise. I have taken some liberties with the geometry and turned mounts inside-out.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
1 SPP FIELDS MEP Main Electronics Package Preliminary Design Review Bill Donakowski UCB/SSL 13/14 NOVEMBER 2013 MAVEN PFDPU Flight.
Main Electronics Package
Magnetospheric MultiScale Mission (MMS) Overview
PAO 1 Telecon THEMIS Public Affairs FGM Instrument.
Test-as-You Fly SpaceWire for Solar Probe Plus
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
1 SPP FIELDS MEP Main Electronics Package Peer Review Bill Donakowski UCB/SSL 18 NOV 2014 MAVEN PFDPU Flight Unit SPP MEP Baseline.
SPACECRAFT OVERVIEW/STATUS
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 535 IDPU Chassis Bill Donakowski Mechanical Engineer UCB/SSL.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
PDS M/C November 2012 PPI MAVEN Report PDS4 Mission Report: MAVEN PDS Management Council November 28, 2012 J. Mafi.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Juno Steve Levin Juno Project Scientist April 1, 2016.
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
Gyeongbok Jo 1, Jongdae Sohn 2, KyeongWook Min 2, Yu Yi 1, Suk-bin Kang 2 1 Chungnam National University 2 Korea Advanced Institute of Science.
Summary FM design overview (As built) Documentation FM2 performances.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Double Star: Table of Contents
Double Star: Table of Contents
Bill Donakowski Mechanical Engineer UCB/SSL
Spacecraft Interface and I&T
Mission overview: two spacecraft that target key radiation belt regions with variable spacing
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
Summary FM design overview (As built) Documentation FM performances.
University of California, Berkeley
iSHELL Design Review Cryostat & Optics Bench
1. Introduction and Overview
MMS plug-ins for SPEDAS
GLAST Large Area Telescope:
SNS PPU Cryomodule Space Frame
Presentation transcript:

Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed

MMS Observatory w/SA Removed Mission Overview July 13 & 14, MMS I&T Pre-CDR Peer Review

July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 3 SMART IS Components Mission Overview DIS DES ASPOC FEEPS EDI SDP HPCA EIS IS safe/arm panel X -X -Y +Y ADP DSS FEEPS Mag boom SCM & AFG Mag boom DFG SMART Components ADP - Axial Double Probe AFG - Analog Flux Gate Magnetometer (mounted on boom) ASPOC - Active Spacecraft Potential Control CEB - Central Electronics Box (Fields) CIDP - Central Instrument Data Processor DES - Dual Electron Spectrometer DFG - Digital Flux Gate Magnetometer (mounted on boom) DIS - Dual Ion Spectrometer EDI/GDU - Electron Drift Instrument/ GunDetector Unit EIS - Energetic Ion Spectrometer FEEPS - Fly’s Eye Energetic Particle Sensors HPCA - Hot Plasma Composition Analyzer IDPU - Instrument Data Processing Unit (FPI) SCM - Search-Coil Magnetometer (mounted on boom) SDP - Spin-Plane Double Probe CIDP, IDPU, and CEB are mounted under the IS deck

July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 4 Clampband Locations Active Ring Simulator - Future Work Spacecraft Separation System RUAG PAS1666S mm clampband, shear lip design Spacecraft Separation System RUAG PAS1666S mm clampband, shear lip design Spacecraft Separation System RUAG PAS1666S mm clampband, shear lip design Launch Vehicle Separation System Atlas D mm clampband, shear pin design - Also supplied by RUAG

July 13 & 14, 2010MMS I&T Pre-CDR Peer Review5 Observatory - Dimensions +X-X +Y -Y (3150 mm) [124.0”] (3478 mm) [136.9”] (3680 mm) [144.9”] (3690 mm) [145.3”] (3033 mm) [119.4”] +Y -Y +X-X maximum dimension = 3690 mm [145.3”] [12’ 1.3”]

July 13 & 14, 2010MMS I&T Pre-CDR Peer Review6 Observatory - Dimensions Active SOLAR ARRAY PANEL (.850 m 2 ) Passive Sep Plane (1230 mm) [48.4”] (680 mm) [26.7”] (66 mm) [2.6”] (110 mm) [4.3”] (1250 mm) [49.2”] (133 mm) [5.2”] (930 mm) [36.6”] (1666 mm) [65.6”] (1054 mm) [41.5”] Thrust Tube +X -X +Z -Z ORIGIN (216 mm) [8.5”] (167mm) [6.6”] (490 mm) [19.3”] (526 mm) [20.7”]

July 13 & 14, 2010MMS I&T Pre-CDR Peer Review7 Launch Configuration 4 Meter Fairing #1 #2 #3 # mm [193.5”] 5936 mm [233.7”] LV I/F Four observatories will be stacked on top of each other will be clocked 180° from each other separation system details in covered in the Mechanical PDR

Instrument Suite Harness IS harness is the responsibility of SwRI SwRI is using the GSFC Pro-E model for harness routing and transfer of harness tie- down locations –as harness segments are fabricated, the mass of each segment will be added to the model Spacecraft is providing production break connector brackets where IS harness joins SC harness –brackets are attached to the thrust tube Harness between IS deck and SC deck is routed along the thrust tube and is attached via threaded inserts in the thrust tube ribs Some IS harness is routed across SC deck (FEEPS, magnetometers) –these areas are shown on the deck MICD Harness tie downs on the IS deck are bolted to the deck in post cured inserts and with bonded TC105s Purge lines are also routed using the same model July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 8

CEB CIDP IDPU AEB DIS #4 DIS #3 DIS #2 DIS #1 DES #2 DES #3 DES #4 DES #1 ASPOC #1 ASPOC #2 FEEPS EDI #2 EDI #1 SDP #4 SDP #2 SDP #1 SDP #2 HPCA EIS IS safe/arm panel +X -X +Y -Y purge manifold S-Band Antenna Test/thermal pwr distribution panel vent Instrument Deck Components July 13 & 14, 2010MMS I&T Pre-CDR Peer Review9 Instrument Deck Components ADP - Axial Double Probe AEB - Axial Electronics Box ASPOC - Active Spacecraft Potential Control CEB - Central Electronics Box (Fields) CIDP - Central Instrument Data Processor DES - Dual Electron Spectrometer DIS - Dual Ion Spectrometer EDI/GDU - Electron Drift Instrument/ Gun Detector Unit EIS - Energetic Ion Spectrometer FEEPS - Fly’s Eye Energetic Particle Sensors HPCA - Hot Plasma Composition Analyzer IDPU - Instrument Data Processing Unit (FPI) SDP - Spin-Plane Double Probe - 19 IS instruments- SC vent - 4 IS electronics boxes- S-band antenna - IS safe/arm panel- 6 thrusters - IS purge manifold - IS test/thermal pwr distribution panel ` (blue = SC components mounted on instrument deck) thruster

July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 10 Remaining Integration install solar arrays & magnetometer booms install ADP receiving element & orbital debris shields

GPS Hat Coupler S-band Hat Coupler (+Z direction) DES Sensor Head SCM and AFG (mounted on mag boom not shown) DES Sensor Head GPS Hat Coupler DES Sensor Head DSS Stimulator DES Sensor Head GPS Hat CouplerGPS Hat Coupler GPS Hat Coupler S-band Hat Coupler (-Z direction) DFG (mounted on mag boom not shown) Star Sensors (really on underside of spacecraft deck) EIS HPCA Total of 24 Add-On Stimulus GSE for Thermal Tests Adding 1 foot clearance for TVAC GSE. The current minimum width needed with TVAC GSE attached = 157.5” or 13.1 feet 145.5” or 12.1’ FEEPS FEEPS (mounted on spacecraft deck) Stimulus and GSE Locations July 13 & 14, MMS I&T Pre-CDR Peer Review