Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.

Slides:



Advertisements
Similar presentations
DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Saturday 24 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday 11/07: Recovery Plenty of accesses.
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHC Injection and Dump Protection
Wed :40 Lost S78 - QPS controller.
Week 36 plan Todo’s: And also: 12+b injection.
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Friday 14th December - morning
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Programme for Saturday 10 July
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 14:00 beam dump Access:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Sat morning Until 12:40: Loss maps at injection
Summary for LPC (March 7th, Ralph Assmann)
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Tuesday – Morning and Evening
Monday 10th December - morning
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Presentation transcript:

Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ diagnostics 10:30 PM65 lift doesn't work! 11:45 Lift back in action 13:05 Access over 13:30 Pre-cycle 14:40 Problem with TCSG.5L3.B1…  See Roberto Losito LHC status

Tuesday 10 th April - afternoon 15:15 beam in Two loss maps at 4 TeV unsqueezed – efficient  Q’ on the ramp 19:20 ramp 624 for physics  Short life time dip in squeeze warning on BLM (TCLA.B6L7.B2) around 2m  Up to 77 % of dump threshold during collisions BP on RS 5.2 s for BLMQI.5L7.B2I10_MQWA.E5L7 around 35% on TCLS.C6R7.B1 on RS 20.9s (note 30 minute lifetime for 10 seconds dumped beam on the 1.5e11 fill yesterday night) 20:00 Stable beams #2500  2.3e33 cm-2s-1, 1.33e11 ppb LHC status

Tuesday 10 th to Wednesday 11 th 01:45 #2500 lost to controls problem (fibre optics repeater) which impacted cryogenics  Cryo maintain lost in MSL2 and ITL2, sector 12.  2:20 rest of S12 tripped consequence of the loss of comm: the DFBs are no more under control and the temperature of some leads has increased. U_HTS of lead 3 is exceeded the 3 mV and the fast abort is sent. Pre-cycle, re-injecting around 6:15 08:00 Stable beams  Lift horizontal tunes to nominal before collisions – losses down to 42% of dump threshold going into collisions LHC status

TSCG The issue with the collimator TCSG.5L3.B1 was traced back to a mechanical problem with a roller screw on one motor axis of the left jaw. The repair would requires realistically half a day and could hardly be done immediately. We therefore propose to continue the operation without moving the left jaw from the its injection settings. The other jaw can be "ramped" with the usual functions (one-sided cleaning at top energy). Expect a small effect on the system performance  validate these new settings with off-momentum loss maps at flat- top (both signs) – done – loss maps OK LHC status Stefano Redaelli

TCSG Actions taken by collimation team  1. Flatten functions for left jaw during the ramp: constant at injection settings.  2. Updated interlock limits for left jaw and gap.  3. Updated energy limits for the gap.  4. Updated parking positions for left jaw only in order not to move it during the "precycle". Injection positions are not affected. No actions are required for squeeze and collision functions because these collimators reach their final positions at the end of the ramp. LHC status Stefano Redaelli

Orbit feedback reference problem Circumstances in which the problem arises understood although not the problem itself (yet)  Situation can be categorically diagnosed before starting ramp and squeeze Actions:  Manual checks before ramp and squeeze  Sequencer task to check set against requested (Laurette, Roman)  SIS interlock checking values of published reference orbit (Jorg) LHC status

Orbit feedback reference problem In the meantime, Maxim will take advantage of the current access to stress test development version with the sequencer with the help of Laurette. Also agreed that CCC will be is Maxim’s new office until the problem is solved so he will have a chance to better diagnose the issues! Problem probably understood  Race condition between server task and real-time task (missing mutex protection) – if confirmed – simple fix Meeting this morning to discuss strategy LHC status Jean-Jacques Gras

Q’ on ramp LHC status

On the list Raise thresholds of long RSs of MQWA BLMs etc. Bunch length ~1.2 ns on flat-top Lifetime dip in squeeze around 2 m – orbit? 840 bunches FMCM test at injection and 4 TeV with safe beams  Active filters of RDs on/off MZ EOF Losses either side experiments with TCL in/out SR TL stability studies  require 1.5h of beam extracted from the SPS onto the TED in TI2/TI8(beam not injected). Lene LHC status

LHC status

LHC status

LHC status