Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100% How long did it take you.

Slides:



Advertisements
Similar presentations
HTML Basics Customizing your site using the basics of HTML.
Advertisements

In this class you will learn COMPUTER BASICS and how to use DIFFERENT APPLICATIONS details.
The Complete Solution Are You Ready?
They tell me that I'm a BIM Coordinator. How did that happen and what does it mean? Brett C. Gatti Design Technology Leader.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
Measuring Concrete Work
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
EGR 105 Foundations of Engineering I Fall 2007 – Week 1 Introduction.
Using “BIM” Features on a real Project John McCann - Vipond UK Art Dove - Hydratec Inc.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100% How long did it take you.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Work Breakdown Structure –Early compilation of significant work items w/ associated cost and schedule considerations –Overview of project –First look.
1 Solver Finding maximum, minimum, or value by changing other cells Can add constraints Don’t need to “guess and check”
Comprehensive Building Modeling Presented By: Bariham Hossny Gheith by Larry Rocha
Estimating With Electronic Documents Kevin R. Miller, Ph.D. Brigham Young University
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
Document management New: SharePoint and SharePoint Online support Excel Add-in New: Office 365 support via export, filtering APIs, dimension descriptions,
From Program Analysis Research to Industrial Programming Language Development Andy Maule.
TM Scheduling - Lab Clay Hickling GHD. Revit Technology Conference 2010 Clay Hickling – BIM Project Master - GHD Used Revit for past 6 years Currently.
Sigma Factor EMS Modern Energy Monitoring & Control System
Do now: These cuboids are all made from 1 cm cubes
Computer assisted design of Sprinkler System Piping assemblies and sub-structures Hilti BU Installation Systems ¦ ¦
Introduction to BIM BIM Curriculum 01.
BIM and Preconstruction King Saud University Engineering College Civil Engineering Department -CE 613- Presented by Dr. Khalid Al-Ghtani.
Quantities 2 Plans Prepared by Heath Bielefeldt Wisconsin Department of Transportation
Copyright (c) 2003 CPTTM 1 Common fears of a software development manager Common fears of a software development manager: –Deadline.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Estimating With Electronic Documents Kevin R. Miller, Ph.D. Brigham Young University
SLA of an Outsource Process - 1 Service Level Agreements (SLAs) of an Outsource Process Michael Day MBA 731 October 29, 2007.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Recordkeeping for Good Governance Toolkit Digital Recordkeeping Guidance Funafuti, Tuvalu – June 2013.
Miscellaneous Excel Combining Excel and Access. – Importing, exporting and linking Parsing and manipulating data. 1.
Talking to non-technical people about data (Especially if they’re your boss) OSCON July 22, 2015 Linda Powell, CDO CFPB.
Lesson Plan – Triangles Mental and Oral Starter Using mini white boards pupils to draw rectangles with the given areas. Main Activity Using mini white.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Estimating With Electronic Documents Kevin R. Miller, Ph.D. Brigham Young University & Ron Covarrubias Northstar Management.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Using Google Drive. Accessing Google Drive Go to drive.google.com or click Drive in the black bar when you are signed in to any Google page There are.
Introduction  Today I’m going to look at some spreadsheets and analyse they show.  The two spreadsheets I’m looking at are Belgrave school’s test.
© Copyright 2004, Alan Marshall 1 Introduction COURSE OVERVIEW.
Business computing Session 7 Excel, Links, Graphics, Goal seeking.
Bentley OnSite: Overview Construction / Engineering / Inspection Solutions from Bentley Civil.
Verification & Validation. Batch processing In a batch processing system, documents such as sales orders are collected into batches of typically 50 documents.
The Benefits of Using BIM Software in Building Design and Construction By Jared Heber.
CR3683-L Integrating Autodesk® Quantity Takeoff and Timberline Estimating Kevin R. Miller Associate Professor, Brigham Young University Jason Dodds, Autodesk.
INTEGRATED DESIGN SYSTEM  AUTOCAD  STAAD  STR. DESIGN SYSTEM  MICRO SOFT EXCEL.
Chapter 18 Determining Sales Forecasts. Main Ideas  Importance of Forecasting Sales  Sales History  Maintaining Sales Histories  Sales Variances 
CSE403 Software Engineering Autumn 2001 Prototyping Gary Kimura Lecture #5 October 10, 2001.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Warm-Up #1 11/30 1. Write down these 3 formulas:
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
CIS 234: Project 2 Issues Dr. Ralph D. Westfall May, 2010.
T20 - Gradebook Understanding & Using CoolSIS v
IRC Research and Technology Forum B uilding I nformation M odeling by Bill Wiseman, P.E. Sr. V.P. Hixson Inc. Director of Operations.
Sourcing Event Tool Kit Matrix Pricing & Tiered Pricing User Guide
P2 Exam Tips Feedback from the examiners
From Program Analysis Research to Industrial Programming Language Development Andy Maule.
Estimating With Electronic Documents Kevin R. Miller, Ph. D
Page Title Sub Title Photos Diagrams Drawings
Applications of Technology
Microsoft Office 2003 Illustrated Introductory, Premium Edition
Intro To Design 1 Elementary School Library: User Sub-System Class Diagrams Software Engineering CSCI-3321 Dr. Tom Hicks Computer Science Department.
Tips to Help You Get The Seller to Take Your Lead on Price
Insert 3D Models in Microsoft Word 2016
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
ESTIMATE TAKE-OFF & RELATED MATH WORKSHOP - Part 2
Presentation transcript:

Kevin R. Miller BYU Construction Management

Estimating today When was the last time you estimate a set of plans that were 100% How long did it take you to do the takeoffs?

Risk Who bears the risk today if the plans aren’t complete? How do you cope with plans that aren’t complete? Hard Bid Negotiated, Design-Build

Benefits of Takeoff Process (Traditional Plans) Become familiar with the project Find problem areas and identify risk and constructability issues Value engineering

Down side of Takeoff (Traditional Plans) Time consuming (Detailed Estimates) May miss something Transferring quantities from takeoff sheets to Estimating software tedious and non productive

What do we want from the Model? Accurate quantities Less takeoff time Better visualization of project Subs to understand the project and their scopes. Competitive edge Clash detection Visual means to communicate to clients

General Sales Pitch Push the button. Costs are generated. The 4/5 D model is generated. All the work is done. Looks good, sales software. Not necessarily doable without a lot of extra work.

Model World Today Not the magical pushing a button and the estimate is done. No such thing as a 100% Model Costs come from your estimating database not Means or some other source The liability that exists with 2D drawings exist with 3D models With BIM – Risk shouldn’t change or shift

Models cont Takeoffs consume less time More time verifying what is modeled is constructable Better understanding of design intent

Estimating from the Model or Not? Do I really want to work from the Model? No, I want static drawings that don’t change so there is an accurate history of the costs for the project No, I don’t want the potential to change the drawings because I’m and estimator, not a modeler No, the file size of the model would really slow me and my computer down. DWF file (a read-only copy of the model) addresses the above concerns

What can we really get from the Model? Counts Lengths Areas I have concerns about the wall areas and volumes Use Length * Height for areas Use Length * Height * Width for volumes Do these concerns mean don’t use the model? NO, just understand how the quantities are being calculated. When in doubt, check the quantity calculation.

Timberline/MC2 Opportunities QTO integrates seamlessly into Timberline. QTO integrates with MC2. Use Timberline/MC2 for complete estimates instead of jumping to Excel (Conceptual/Budget not Bid day) Cleanup and optimize the estimating DB Too much legacy junk in estimating DB’s Every item in the DB should have a formula in order to link QTO integrates better with Timberline than Timberline does

What is needed to Estimate From the Model 3D model 2D modeled sheets Allows you to perform takeoff for the things not modeled. DWF file format May use PDF, jpg etc files but they will not link to the 3D model.

Model Estimating in the Classroom Takeoffs taking less time Test scores are going up and takeoffs more accurate.

Contact: Kevin R. Miller Office: