THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Project Management 6e..
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8: Scheduling Resources and Costs
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Scheduling Resources and Costs Chapter 8.
Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.
RESOURCES Roger D. H. Warburton © Kanabar / Warburton,
12-1 Resource Management Chapter 12 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
Resource Management Chapter 12.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management 6e..
Resource Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Reducing Project Duration
Project Management Cost and Resources
Project Management: A Managerial Approach
Operations Management
Software project management (intro) Resource allocation.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Organization Strategy and Project Selection
6 Resource Utilization Teaching Strategies
OPSM 639, C. Akkan Resource Planning Resources affect the schedule, cost and performance of a project. Resources are –Individual people, departments/teams,
Resources Management Dr. Ahmed Elyamany.
Copyright 2009 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Where We Are Now. Where We Are Now Developing the Project Plan The Project Network A flow chart that graphically depicts the sequence, interdependencies,
7-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 7 Project Time Management.
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Developing a Project Plan Chapter 6.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
Resource Management. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall12-2 Types of Constraints  Time  Resource  Mixed Copyright.
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
1 ISE Ch. 8 pt. 2 Resource-constrained scheduling: Computer demonstration EMR Project  The development of a handheld electronic medical reference.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
The Resource Problem Resources and Priorities
Scheduling Resources and Cost
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Copyright 2012 John Wiley & Sons, Inc. Chapter 9 Resource Allocation.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Organization: Structure and Culture
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
12-1 Resource Management Chapter 12 © 2007 Pearson Education.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Scheduling Resources and Costs
Scheduling Resources and Costs
Project Management -- Scheduling Resources and Costs
Scheduling Resources and Costs
Chapter 8 Scheduling Resources.
ENGINEERING MANAGEMENT (GE 404)
Scheduling Resources CHAPTER EIGHT. Scheduling Resources CHAPTER EIGHT.
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Resource Management Chapter 12
Chapter 9 Resource Allocation © 2012 John Wiley & Sons Inc.
Manajemen Industri Teknologi informasi
Scheduling Resources and Costs
Resource Management Chapter 12
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Scheduling Resources and Costs
Presentation transcript:

THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–2

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–3 The Resource Problem Resources and Priorities –Project network times are not a schedule until resources have been assigned. The implicit assumption is that resources will be available in the required amounts when needed. Adding new projects requires making realistic judgments of resource availability and project durations. Resource-Constrained Scheduling –Resource leveling (or smoothing) involves attempting to even out demands on resources by using slack (delaying noncritical activities) to manage resource utilization.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–4 Types of Project Constraints Technical or Logic Constraints –Constraints related to the networked sequence in which project activities must occur. Physical Constraints –Activities that cannot occur in parallel or are affected by contractual or environmental conditions. Resource Constraints –The absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–5 Constraint Examples FIGURE 8.1

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–6 Kinds of Resource Constraints People Materials Equipment Working Capital

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–7 Classification of A Scheduling Problem Classification of Problem –Using a priority matrix will help determine if the project is time or resource constrained. Time Constrained Project –A project that must be completed by an imposed date. Time is fixed, resources are flexible: additional resources are required to ensure project meets schedule. Resource Constrained Project –A project in which the level of resources available cannot be exceeded. Resources are fixed, time is flexible: inadequate resources will delay the project.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–8 Resource Allocation Methods Limiting Assumptions –Splitting activities is not allowed—once an activity is start, it is carried to completion. –Level of resource used for an activity cannot be changed. –Activities with the most slack pose the least risk. –Reduction of flexibility does not increase risk. –The nature of an activity (easy, complex) doesn’t increase risk.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–9 Resource Allocation Methods (cont’d) Time-Constrained Projects –Projects that must be completed by an imposed date. –Require the use of leveling techniques that focus on balancing or smoothing resource demands by using positive slack (delaying noncritical activities) to manage resource utilization over the duration of the project. Peak resource demands are reduced. Resources over the life of the project are reduced. Fluctuation in resource demand is minimized.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–10 Botanical Garden FIGURE 8.2

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–11 Botanical Garden (cont’d) FIGURE 8.2 (cont’d)

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–12 Resource Allocation Methods (cont’d) Resource Demand Leveling Techniques for Time-Constrained Projects –Advantages Peak resource demands are reduced. Resources over the life of the project are reduced. Fluctuation in resource demand is minimized. –Disadvantages Loss of flexibility that occurs from reducing slack. Increases in the criticality of all activities.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–13 Resource Allocation Methods (cont’d) Resource-Constrained Projects –Projects that involve resources that are limited in quantity or by their availability. –Scheduling of activities requires the use of heuristics (rules-of-thumb) that focus on: 1.Minimum slack 2.Smallest (least) duration 3.Lowest activity identification number –The parallel method is used to apply heuristics An iterative process that starts at the first time period of the project and schedules period-by-period any activities scheduled to start using the three priority rules.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–14 Resource-Constrained Schedule through Period 2–3 FIGURE 8.3

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–15 Resource-Constrained Schedule through Period 2–3 FIGURE 8.3 (cont’d) ES resource load chart

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–16 Resource-Constrained Schedule through Period 2–3 FIGURE 8.3 (cont’d) Resource-constrained schedule through period 2–3

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–17 Resource-Constrained Schedule through Period 5–6 FIGURE 8.4 Resource-constrained schedule through period 5–6

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–18 Resource-Constrained Schedule through Period 5–6 FIGURE 8.4 (cont’d) Final resource-constrained schedule

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–19 Resource-Constrained Schedule through Period 5–6 FIGURE 8.4 (cont’d) New, resource-constrained network

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–20 Computer Demonstration of Resource- Constrained Scheduling EMR Project –The development of a handheld electronic medical reference guide to be used by emergency medical technicians and paramedics. Problem –There are only eight design engineers who can be assigned to the project due to a shortage of design engineers and commitments to other projects.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–21 EMR Project: Network View of Schedule before Resources Leveled FIGURE 8.5

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–22 EMR Project before Resources Added FIGURE 8.6

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–23 EMR Project—Time Constrained Resource Usage View, January 15–23, 2005 FIGURE 8.7A

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–24 Resource Loading Chart for EMR Project, January 15–23, 2005 FIGURE 8.A7B

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–25 EMR Project Network View Schedule after Resources Leveled FIGURE 8.8

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–26 EMR Project Resources Leveled FIGURE 8.9

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–27 The Impacts of Resource-Constrained Scheduling Reduces delay but reduces flexibility. Increases criticality of events. Increases scheduling complexity. May make traditional critical path no longer meaningful. Can break sequence of events. May cause parallel activities to become sequential and critical activities with slack to become noncritical.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–28 Splitting/MultitaskingSplitting/Multitasking Splitting/Multitasking –A scheduling technique use to get a better project schedule and/or increase resource utilization. Involves interrupting work on an activity to employ the resource on another activity, then returning the resource to finish the interrupted work. Is feasible when startup and shutdown costs are low. Is considered the major reason why projects fail to meet schedule.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–29 Splitting/MultitaskingSplitting/Multitasking FIGURE 8.10

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–30 Assigning Project Work Factors to Consider in Assigning Work: –Don’t always pick the same people for the toughest assignments. –Choose people with an eye to fostering their development through participation on the project. –Pick people with compatible work habits and personalities but who complement each other. –Team-up veterans with new hires to share experience and socialize newcomers into the organization. –Select people who may need to learn work together on later stages of the project or other projects.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–31 Multiproject Resource Schedules Multiproject Scheduling Problems –Overall project slippage Delay on one project create delays for other projects –Inefficient resource application The peaks and valleys of resource demands create scheduling problems and delays for projects. –Resource bottlenecks Shortages of critical resources required for multiple projects cause delays and schedule extensions.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–32 Multiproject Resource Schedules Managing Multiproject Scheduling –Create project offices or departments to oversee the scheduling of resources across projects. –Use a project priority queuing system: first come, first served for resources. –Centralize project management: treat all projects as a part of a “megaproject.” –Outsource projects to reduce the number of projects handled internally.

Copyright © 2006 The McGraw-Hill Companies. All rights reserved. McGraw-Hill/Irwin 8–33 Key Terms Heuristic Leveling/smoothing Multitasking Resource-constrained projects Resource profile Splitting Time-constrained projects