1 Enterprise Risk Management for P&C Insurance Companies Shaun S. Wang Robert T. Faber.

Slides:



Advertisements
Similar presentations
1 PROVISIONS FOR PROFIT AND CONTINGENCIES (MIS-35) Seminar on Ratemaking Nashville, TNRuss Bingham March 11-12, 1999Hartford Financial Services.
Advertisements

Introduction to Enterprise Risk Management (ERM)
Tillinghast–Towers Perrin Montana State Fund The Role of Surplus Senate Bill 304 Study Committee September 23, 2003 Presented by: Robert F. Conger, FCAS,
Math 479 / 568 Casualty Actuarial Mathematics Fall 2014 University of Illinois at Urbana-Champaign Professor Rick Gorvett Session 1: Introduction and Overview.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 7 Financial Operations of Insurers.
1 Risk Management at Progressive Insurance How we got started Getting corporate support Capital Management Examples of deliverables The value risk management.
A Case Study: ERM Implementation at Erie Insurance Gene Connell, Senior Vice President – Actuarial Erie Insurance Group Casualty Actuarial Society Spring.
Assignment Four Underwriting. Definitions Underwriting – The process of selecting policyholders by recognizing and evaluation hazards, establishing prices.
Agenda Introduction to Credibility Difference between Policy Year, Accident Year, and Calendar Year Relationship Between Accident Year and Calendar Year.
1 Ken Fikes, FCAS, MAAA Introduction to Casualty Actuarial Science November 2005.
Sinners & Saints Bill McConnell (The Lloyd’s Actuary) & James McPherson (A Lloyd’s Actuary)
1 Math 479/568 Casualty Actuarial Mathematics Fall 2014 University of Illinois at Urbana-Champaign Professor Rick Gorvett Session 3: Economics and Insurance.
ROCKY MOUNTAIN CHAPTER RIMS RISK FORUM Thursday, September 22, 2011 Speaker - Barbara Benson Grinnell Vice President, Willis (985)
Loss Reserving in Argentina, Brazil and Mexico Eduardo Esteva New Orleans, Louisiana September 11, 2001.
The Role of the Actuary in a General Insurance Company Yangon, Myanmar 14 July 2014 Scott Yen.
Project Management For Class Plan Projects CAS Special Interest Seminar on Predictive Modeling October 11-12, 2007 Jonathan White.
Insurance Companies Chapter 2
New Products – The Intersection of Pricing, Reserving, Planning Betsy DePaolo Vice President & Actuary, Personal Insurance Travelers Insurance Casualty.
1999 CLRS Intermediate Case Study Discussion Material For GL Insurance Company.
CDS Operational Risk Management - October 28, 2005 Existing Methodologies for Operational Risk Mitigation - CDS’s ERM Program ACSDA Seminar - October 26.
André Lefebvre, FCAS, MAAA Director – ART Underwriting Winterthur International Casualty Loss Reserve Seminar September 18, 2000 Minneapolis, MN Actuary.
Basic Track I 2007 CLRS September 2007 San Diego, CA.
Dr. James Kallman, ARM 4 -1 Advanced PowerPoint Presentation ©2009 The National Underwriter Company.
Linkage of Risk, Capital and Financial Management John J. Kollar, FCAS, MAAA, CPCU, RWW November 12, 2007.
1 Practical ERM Midwestern Actuarial Forum Fall 2005 Meeting Chris Suchar, FCAS.
精算学与 精算考试 ( Society of Actuaries ) 2004 级本科生 2006 年 12 月 15 日 北京大学.
Ab Rate Monitoring Steven Petlick Seminar on Reinsurance May 20, 2008.
1 Casualty Loss Reserve Seminar September 14, 1999 Presented by: Susan E. Witcraft Milliman & Robertson, Inc. DYNAMIC FINANCIAL ANALYSIS What Does It Look.
Midland National Life ® Insurance Company North American Company for Life and Health Insurance ® Sammons ® Corporate Markets Group Sammons Securities Company.
© 2007 Towers Perrin June 17, 2008 Loss Reserving: Performance Testing and the Control Cycle Casualty Actuarial Society Pierre Laurin.
2007 CAS PREDICTIVE MODELING SEMINAR PROJECT MANAGEMENT FOR PREDICTIVE MODELS BETH FITZGERALD, ISO.
Traditional Actuarial Roles – Putting It All Together in an ERM (and EOM) Framework CAS Spring Meeting June 18, 2007 John Kollar, Russ Bingham, Hartford.
Integrating the Broad Range Applications of Predictive Modeling in a Competitive Market Environment Jun Yan Mo Mosud Cheng-sheng Peter Wu 2008 CAS Spring.
The Surety Industry and Workers Compensation Guarantees Casualty Actuarial Society Presentation by: Marsh Surety Practice Drew Brach, Managing Director.
1 Welcome To The IEI-Sponsored Insurance Workshop MTSU June 4-6, 2007.
Overview of Insurance Operations Types of Insurers Risk Transfer Process Objectives of Insurers Constraints of Achieving Objectives Measurement of Insurer.
Predictive Modeling for Small Commercial Risks CAS PREDICTIVE MODELING SEMINAR Beth Fitzgerald ISO October 2006.
Current Loss Reserving Developments CAS Annual Meeting November 15, 2005 Chuck Emma, Pinnacle Tom Ryan, Milliman John J. Kollar, ISO.
Modeling asset and Liability cashflows in a dynamic setting: Basic tools and risk measures 2000 CAS DFA Seminar Robert J. Walling Paratus consulting limited.
Ab Rate Monitoring Steven Petlick CAS Underwriting Cycle Seminar October 5, 2009.
2004 Hurricane Season Recap and Observations May 2005 CAS Meeting.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 3 Introduction to Risk Management.
November 14, 2001 François Morin, FCAS, MAAA, CFA Capital Management 2001 CAS Annual Meeting - Atlanta, Georgia.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Insurance Company Operations.
CLRS Intermediate Track III WC Case Study September 2008 Washington, DC.
Loss Reserving: Is It Broken? What Can Be Done Better? Casualty Loss Reserve Seminar September 14, 2004 Chuck Emma, Pinnacle Tom Ryan, Milliman John J.
©Towers Perrin Loss Reserve Adequacy and the Underwriting Cycle Casualty Actuarial Society General Meeting Montreal, Canada November 16, 2004 Michael E.
Actuaries in Non-Traditional Roles Gail Ross, CAS Past-President Manager & Senior Consultant- Milliman, Inc. Presented at the CAS/CIA Annual Meeting Montreal.
1 The Navigators Group, Inc. “Insuring a World in Motion” Cochran, Coronia & Co. Investor Meetings June 22, 2004 New York City Stanley A. Galanski, President.
1998 CASUALTY LOSS RESERVE SEMINAR 5B Intermediate Track IV Case Study Example 1: WC Insurance Company Example 2: GL Insurance Company September 29, 1998.
1 Chapter 20 Bank Performance Financial Markets and Institutions, 7e, Jeff Madura Copyright ©2006 by South-Western, a division of Thomson Learning. All.
CONTROLLING COSTS Choosing the Right Insurance Program Kevin D. Smith, CPCU, ARM Vice President Workers’ Compensation.
2005 Casualty Loss Reserve Seminar Loss Reserve Analysis and Statements of Actuarial Opinion Robert E. Farnam Senior Financial Analyst and Actuary A.M.
Randy Wadle, CEO. Client Profitability  Breaking Down the P&L  Billable Services  Measuring Cost of Service  Client Scorecards.
0 July , 1998 Boston, Massachusetts Presented by: Susan E. Witcraft Milliman & Robertson, Inc. Addressing Three Questions Regarding an Insurance.
Basic Track I 2008 CLRS September 2008 Washington, DC.
Enterprise Risks Management (ERM) John Kollar, Vice Chair, CAS ERMC CAS Representative to Risk Management Section Council May 16, 2005.
The Basics of Self Funding
Loss Reserving in Mexico
Casualty Actuaries of New England
The Financial Services Industry: Insurance Companies
PROFIT AND CONTINGENCIES (FIN-28)
Cost of Capital Issues April 16, 2002 John J. Kollar.
The Basics of Self Funding
No, Really, You Can Use DFA for Ratemaking, Too!
Overview of Insurance Operations
Small Cities Organized Risk Effort (SCORE) Target Funding Benchmarks
Small Cities Organized Risk Effort (SCORE) Target Funding Benchmarks
Establish the Price: Rating
Presentation transcript:

1 Enterprise Risk Management for P&C Insurance Companies Shaun S. Wang Robert T. Faber

Agenda ERM Research Project Summary of Research Findings Underwriting Psychology Our Proposed Actions

ERM Research Project Co-sponsored by Casualty Actuarial Society Risk Management Section (SOA & CAS) ERM Institute International, Ltd Researcher Team Shaun Wang (actuary, scholar) Bob Faber (executive, senior underwriter) Assisted by Project Oversight Team chaired by John Kollar (ISO)

Objectives & Time line Objectives: Propose a fresh ERM Theory that is applicable to all sectors Make ERM operational for P&C insurers Time Line Feb 16, started June 15, exposure draft August 1, completed

The Concept of Risk Dynamics The big Universe consists of many projects (risks and opportunities), external players (customers, competitors), external forces (financial, regulatory) An enterprise sits within the big universe selected projects, internal players & internal forces “risk dynamics” refers to the interactions of forces and players within and without the enterprise.

We define ERM as studies of the system of risk dynamics of the enterprise, including interactions among internal and external risk dynamics, and how players’ actions (including the risk management practices) can influence the behaviors of the risk dynamics, with the ultimate goal of improving the performance and resiliency of the system.

Element of ERM Framework 1) Analyze the business model 2) Define the scope of business operations, 3) Identify operating constraints by regulators and rating agencies, 4) Measure sensitivity to external and internal forces, 5) Develop business or risk strategies to interact with the various forces 6) Monitor the dynamics

P&C Insurer Risk Dynamics -- Players

Net Effect of Diversification Benefit/Penalty It depends on the nature of business model, & how you conduct the business Personal Lines: diversification essential for managing catastrophe exposure Commercial Lines: we observed dramatic differences in financial performance among companies with different underwriting/pricing practices

Empirical Studies A sample of 29 insurance companies: 1)Small Companies (14 companies) 2)Jumbo Regional (7 companies) 3)Large National (8 companies) Focused on WC and GL use gross loss ratios use gross loss triangles

Mean and Deviation of Loss Ratio in relation to Size of Written Premium - WC

Mean and Deviation of Loss Ratio in relation to Size of Written Premium - GL

Summary Result by Company Type

Loss Reserve Practices For a selected company and 1997 accident year, we observe booked loss ratios at 12/31/1997, 12/31/1998, up to 12/31/2004. Loss Development for Accident Year 1997 = {Estimated Incurred Loss as of 12/31/2004 } – {Initial Incurred Loss Ratio of12/31/1997 }

Workers Compensation Loss Development

General Liability Loss Development

Back Testing of the Chain-Ladder Development Method For each company and a given line of business (WC or GL), we use the loss triangle data up to the end of year 2000 as input. Applied the Chain-Ladder method to project future development to end of Compared the projected losses with the actual observed losses by the end of 2004.

Large National Companies

Small & Regional

Number of Insurer Upgrades vs. Downgrades, 1993 to 2003 (Source: Standard & Poor’s)

Leading Indicators vs Lagging Indicators Reserves can only be a lagging indicator. -at 12 months, are almost never in an adverse position to precipitate big change months at best for true indications Rate change indications on renewal are adequate only if: -constant policy form (SIRs, deductibles, limits, etc) dominates the book of business and -policies are rated on a true exposure basis, and -new business constitutes a small percentage of premium. By 1997, most companies were rate monitoring and were still surprised by the depth of unmeasured rate decreases for

Underwriting Psychology Underwriting psychology is more important to understand than underwriting philosophy. Most underwriters think frequency more than severity. It is more tangible. Most underwriters have not been in the position long enough to live with their tail. The adverse development always belongs to others. Especially in larger companies, underwriting is not a career path, management is. It is much easier to cut the rate on new business than on renewals. (You didn’t screw up the rating last year) Underwriters learn the unwritten rule early: No matter what management says, those with the bigger books of business get rewarded. Premium is measured by underwriter, loss ratio and development is not.

Price Monitoring True price monitoring can only take place when anchored firmly on a rate for the exposure base, attaching at first dollar. The goal of price monitoring is to project the loss ratio range. This can only occur if the proper rate level per exposure unit is known. Failing that goal, projecting the direction and magnitude of the change still has value. What has a higher priority with company management: expense ratio or price monitors

Terms and Conditions Experience rating by its very nature, using valued claims, can have a market or insured driven bias. Deductible and Self Insured Retention valuations have to take place exactly in accordance with price monitoring techniques. Changes in coverage have to be quantified, if only by estimate.

Quantification of Risk Risk level increases significantly as the attachment point rises. Deductibles and SIRs remove the more predictable part of the risk. Risk knowledge decreases as risk size increases. It is harder to establish exposure bases and there are more variables to balance. Balance of knowledge shifts to the buyer as size increases, increasing risk. Risk level increases with the inexperience of the underwriter on the book. (Note we did not say inexperience of the underwriter)

Monitoring Process Establish base rates per exposure units to be measured against. This does not fully recognize risk quality, but creates a hard base line. Measure renewals creating a history. Force identical quantification of all terms variation (composite rates, deductibles, SIRs, etc) against these base rates. Measure new business against the same standards Even when using experience rating as a methodology, measure the resulting rate against the same basis. Take tracking of rate level change to desk level.

Correcting the Decision-Making Process Effective price monitoring has to occur at the same location as effective underwriting; the underwriter’s desk. Price monitoring needs to become a real part of the evaluation process for rating agencies and analysts. (Remember the grading chart) Senior management and analyst emphasis on top line premium growth and expense control is often at odds with effective price monitoring.

ERM Implementation First line of defense starts at the desk- underwriter Track exposure data Track pricing data Integrate pricing / underwriting/ claims / reserving ERM For P&C Companies

29 Contact 1. Shaun Wang, Bob Faber,