August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.

Slides:



Advertisements
Similar presentations
31/03/00 CMS(UK)Glenn Patrick What is the CMS(UK) Data Model? Assume that CMS software is available at every UK institute connected by some infrastructure.
Advertisements

ATLAS ATLAS PESA Meeting 25/04/02 B-Trigger Working Group Work-plan This talk:
20 Feb LVL1 muon trigger simulation meeting1 the OO codes for endcap muon trigger simulation Hisaya Kurashige KOBE Univ.
ATLAS Analysis Model. Introduction On Feb 11, 2008 the Analysis Model Forum published a report (D. Costanzo, I. Hinchliffe, S. Menke, ATL- GEN-INT )
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
Lucia Silvestris, INFN Bari and CERN/CMC Status Report on CPT Project 23 March 2001, CERN Meeting del Consorzio INFN Status Reports on CPT Project, on.
Simulation Project Organization update & review of recommendations Gabriele Cosmo, CERN/PH-SFT Application Area Internal.
Quality Control B. von Haller 8th June 2015 CERN.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
Argonne National Laboratory ATLAS Core Database Software U.S. ATLAS Collaboration Meeting New York 22 July 1999 David Malon
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
Alignment Strategy for ATLAS: Detector Description and Database Issues
2004 Xmas MeetingSarah Allwood WW Scattering at ATLAS.
LHC Computing Review - Resources ATLAS Resource Issues John Huth Harvard University.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
Event Data Model in ATLAS Edward Moyse (CERN) On behalf of the ATLAS collaboration CHEP 2004, Interlaken.
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, th LHCb Software Week.
Event Data History David Adams BNL Atlas Software Week December 2001.
ATLAS, U.S. ATLAS, and Databases David Malon Argonne National Laboratory DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National Laboratory.
DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
1 Planning for Reuse (based on some ideas currently being discussed in LHCb ) m Obstacles to reuse m Process for reuse m Project organisation for reuse.
19 November 98 1 Jürgen Knobloch ATLAS Computing ATLAS Computing - issues for 1999 Jürgen Knobloch Slides also on:
9 November 98 1 Jürgen Knobloch ATLAS Computing Overview of ATLAS Computing Jürgen Knobloch Slides also on:
ATLAS Data Challenges US ATLAS Physics & Computing ANL October 30th 2001 Gilbert Poulard CERN EP-ATC.
Detector Simulation Presentation # 3 Nafisa Tasneem CHEP,KNU  How to do HEP experiment  What is detector simulation?
CMS Computing and Core-Software USCMS CB Riverside, May 19, 2001 David Stickland, Princeton University CMS Computing and Core-Software Deputy PM.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
05/09/2001ATLAS UK Physics Meeting Data Challenge Needs RWL Jones.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
The CMS Simulation Software Julia Yarba, Fermilab on behalf of CMS Collaboration 22 m long, 15 m in diameter Over a million geometrical volumes Many complex.
- Early Adopters (09mar00) May 2000 Prototype Framework Early Adopters Craig E. Tull HCG/NERSC/LBNL ATLAS Arch CERN March 9, 2000.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
CMS Computing and Core-Software Report to USCMS-AB (Building a Project Plan for CCS) USCMS AB Riverside, May 18, 2001 David Stickland, Princeton University.
Atlas Computing Planning Helge Meinhard / CERN-EP Atlas Software Workshop Berkeley, 11 May 2000.
A New Tool For Measuring Detector Performance in ATLAS ● Arno Straessner – TU Dresden Matthias Schott – CERN on behalf of the ATLAS Collaboration Computing.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Computing R&D and Milestones LHCb Plenary June 18th, 1998 These slides are on WWW at:
Development of the CMS Databases and Interfaces for CMS Experiment: Current Status and Future Plans D.A Oleinik, A.Sh. Petrosyan, R.N.Semenov, I.A. Filozova,
NEC' /09P.Hristov1 Alice off-line computing Alice Collaboration, presented by P.Hristov, CERN NEC'2001 September 12-18, Varna.
Workshop decisions Helge Meinhard / CERN-EP Atlas software workshop 08 May 1998.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
Overview Methodology Design Architecture Outline of future work Ideas for discussion.
Software Week - 8/12/98G. Poulard - CERN EP/ATC1 Status of Software for Physics TDR Atlas Software Week 8 December 1998 G. Poulard.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ACOS Report ATLAS Software Workshop December 1998 Jürgen Knobloch Slides also on:
Detector SimOOlation activities in ATLAS A.Dell’Acqua CERN-EP/ATC May 19th, 1999.
L. Perini DATAGRID WP8 Use-cases 19 Dec ATLAS short term grid use-cases The “production” activities foreseen till mid-2001 and the tools to be used.
J. Knobloch, SW meeting ACOS Agenda Corrections to the Minutes, Matters arising. 2.Discussion and decisions arising from the Software.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
VI/ CERN Dec 4 CMS Software Architecture vs Hybrid Store Vincenzo Innocente CMS Week CERN, Dec
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
Concluding discussion on Commissioning, Etmiss and DPD
CALGO: Software Tasks cal software:
Stress tests for CLAS12 software
Status of Brunel team and next steps
AliRoot status and PDC’04
US ATLAS Physics & Computing
ATLAS DC2 & Continuous production
Planning next release of GAUDI
Presentation transcript:

August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also on:

August 98 2 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Offline Software Plan

August 98 3 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Definition of milestones Ingredients:  Milestones given in CTP  OO reconstruction and simulation - first version available end 99  Full chain operational on subset of final infrastructure - 1 year before LHC start-up  Coverage of interim needs –Physics studies –Test beam support –Radiation level studies

August 98 4 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 1 General Test full chain in real environment7/04 Decide on first production OS7/03 Revisit development environment7/00 Install test and verification procedure4/99 Assess development resources4/99 Analysis Analysis requirements collected11/98 Evaluate analysis environment for interim period3/99 Evaluate analysis environment for production period7/02 Implement analysis environment for production period7/02

August 98 5 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 2 Event storage Define raw data structure12/98 GEANT3 events in ObjDB8/98 GEANT4 events in ObjDB7/99 Provide DB performance report7/00 Decide on database vendor6/01 Define initial version of ESD7/99 Define initial version of event tag7/99 Define initial version of AOD7/99

August 98 6 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 3 Simulation ATLAS simulation domains defined9/98 GEANT4 test beam simulations3/99 Terminate maintenance DICE3/01 First general OO simulation available12/99 Define event generator interface1/99 Simulation framework available1/99 Single particles from G4 in ARVE1/99 Simulation geometry available7/99 Minimum bias overlay5/00

August 98 7 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 4 Reconstruction version 1 First complete OO reconstruction12/99 Reconstruction geometry available3/99 Prepare data12/98 Find tracks2/99 Find ID tracks2/99 Find muon tracks4/99 Find global tracks7/99 Find cal clusters5/99 Calorimeter Calibration4/99 Muon Spectrometer alignment7/98 Inner Detector Alignment7/99 Event display prototype7/99

August 98 8 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Milestones - 5 Infrastructure Conclude study on regional centres11/99 Define financing of computing at CERN10/99 Define scope of regional centres11/99 1 Tbyte database prototype12/ Tbyte database prototype12/03 Full database available12/04 1% processing farm prototype12/02 5% processing farm12/03 40% processing farm12/04 100% processing farm6/05

August 98 9 Jürgen Knobloch ATLAS Software Workshop Ann Arbor Next  Add missing topics  Provide more detailed description  Identify people responsible for each milestone  Agree on the dates for the milestones  For the milestones due in the next 10 months: –Define intermediate milestones –Assess resources needed/available –Define regular monitoring mechanism