IMPERIAL VALLEY CONFERENCE July 21, 2009 2009 SOLICITATION RENEWABLES PORTFOLIO STANDARD.

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
Advertisements

CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
California GHG policy and implications for the power sector APEX Sydney Conference October 13, 2008 Anjali Sheffrin, PhD.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
David Howarth MRW & Associates Oakland, California 1 JUST THE FACTS: RESOURCE PLANNING AND PROCUREMENT INDEPENDENT ENERGY PRODUCERS ANNUAL.
WELCOME PUC Rule 3627 Stakeholder Participation. Who we are: Xcel Energy Staff Introductions Public Service Company of Colorado.
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
(c) 2011 San Diego Gas & Electric Company. All copyright and trademark rights reserved.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
California Energy Commission Workshop Nuclear Power Plant Issues
Victor Vilaplana VP, Electric & Fuel Procurement September 18, 2014 IEPA 33 rd Annual Meeting Energy Procurement, Infrastructure and Policy: Climate Challenges.
SOUTHERN CALIFORNIA EDISON® SM Transmission Expansion Cost Drivers NARUC Portland, Oregon David Mead Vice President, Engineering Southern California Edison.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
California Energy Commission Renewable Energy in California Rasa Keanini and Heather Raitt Renewable Energy Program Efficiency, Renewables & Demand Analysis.
ISO Grid Planning Presentation to CREPC October 1, 2002
Charles Hosken, General Manager Imperial Irrigation District
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
The Need for Electric Transmission Improvements in Dane County.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
California’s Renewable Energy Credits (REC) Market Update
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
1 Clean Energy, A Strong Economy, and a Healthy Environment William J. Keese Western Governors’ Association June 1, 2007 European Insulation Manufacturers.
2009 Bidders Workshop Attachment D August 3, 2009.
Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver,
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Southern California Public Power Authority Director of Resource and Program Development Ted Beatty September 29,
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
2008 Bidders Workshop Attachment D April 11, 2008.
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Resolutions E-4168 and E-4157 Southern California Edison (SCE) requests approval of contracts with a new wind facility and a new solar photovoltaic facility.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
. PANC Annual Conference May 16, 2012 Progress on the California RPS.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
RENEWABLE ENERGY PROCUREMENT February 6, PROGRAM OVERVIEW In 2002, just 1% (141,026 MWh) of SDG&E’s portfolio was from renewables. In 2002, SDG&E.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Cooperation on Regional Siting: How Is It Working - A California Perspective Dian M. Grueneich, Commissioner California Public Utilities Commission National.
Imperial Valley Study Group Transmission Planning Collaborative 2005 California Geothermal Summit June 9, 2005 California Geothermal Energy Collaborative.
SDG&E Generation Additions Jim Avery Chief Development Officer.
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
AES HUNTINGTON BEACH ENERGY PROJECT
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
Electricity Outlook: Summer of 2005 and Beyond." Before the Senate Energy, Utilities and Communications Committee February 22, 2005 Steve Larson Executive.
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
Energy: Challenges with Becoming More Sustainable © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Robb Anderson Director.
LNBA Subgroup: Avoided Transmission Value
The Transition to a High DER Future
Presentation transcript:

IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD

Agenda  Introduction  CPUC Decision Approving Sunrise  Sunrise Powerlink Transmission Project  Imperial Valley Renewable Resources  SDG&E’s Commitments to Imperial Valley Resources  Q & A 11

Decision 2

Decision – Key Elements  The Sunrise decision approves SDG&E’s 12/14/05 application to construct the Sunrise Powerlink Transmission Project using the Environmentally Superior Southern Route in order to accomplish three objectives:  to maintain reliability in the delivery of power to the San Diego region;  to reduce the cost of energy in the region;  to accommodate the delivery of renewable energy to meet state and federal renewable energy goals from geothermal and solar resources in the Imperial Valley and wind and other sources in San Diego County.  As required by CPUC §§ 1001, 1002(a), the CPUC selected Sunrise based on its evaluation of the following 5 factors: 1. Whether there is a need for the proposed project 2. The project’s effect on the environment 3. The project’s effect on recreational and park areas 4. The project’s effect on historical and aesthetic values 5. The project’s effect on community values  The Sunrise Powerlink was selected because it was the more environmentally sensitive of two transmission lines, either of which is essential to interconnect certain solar, geothermal, and substation developments that SDG&E had planned. It will facilitate the achievement of 33% RPS levels within a reasonable period of time with the greatest economic benefits at the lowest environmental cost.  Approval of the Sunrise Powerlink is only the first step toward fully developing renewable energy in the Imperial Valley region. 3

Decision – Key Elements (continued)  The Commission has adopted multiple strategies to address concerns that Sunrise will be used to support development of new fossil-fired generation.  The Commission to enforce two key rules when reviewing the utilities’ planning and procurement of both conventional and renewable generation -- Loading order preference for renewables over fossil-fuel generation Limits on the long-term procurement of baseload generation with excessive carbon emissions  SDG&E to follow through with its voluntary commitment to promote the development of solar, wind and geothermal resources in the Imperial Valley.  All three major utilities to hold Bidders’ Conferences to increase the likelihood that renewable developers will propose viable, competitively priced projects in the Imperial Valley in all three utilities’ upcoming 2009 RPS solicitations.  Energy Division to monitor Imperial Valley proposals submitted in each IOU’s 2009 RPS solicitation. 4

Project Details & Status 5

Size  123 miles of transmission lines, comprised of a 500 kV transmission line for approximately 90 miles and then double circuit 230 kV for approximately 30 miles  Sunrise has thermal transfer capability of over 2,000 MW and allows an additional 1,350 MW to be imported into the San Diego area under normal operating conditions 6

Route  Final Environmentally Superior Southern Route  Imperial Valley Substation to the east of SDG&E’s service area to Sycamore Canyon Substation in the center of SDG&E's service area of SDG&E’s service area  500kV for 92.5 miles then converts to 230kV for 30.3 miles from the new Modified Route D substation to the Sycamore Canyon substation  East to West  Follows I-8 and Southwest Powerlink route for approx. 36 miles  Loops north of I-8 for 17 miles  Parallels the Southwest Powerlink route for 13 miles near Hauser Wilderness Area  Cuts north near Barrett Substation and travels underground Alpine Boulevard to the west  Returns overhead adjacent to I-8 and terminates at Sycamore Canyon Substation 7

Route Source: 8

Sunrise Status  Approximate in service date of June 2012  Source: SECOND QUARTERLY PROJECT STATUS REPORT OF SAN DIEGO GAS & ELECTRIC COMPANY Q (Filed July 15, 2009)  8 questions 9

Sunrise Status  1. Comprehensive project development schedule, including estimated project in-service date  No changes 10

Sunrise Status  2. Any changes in project scope and schedule, including the reasons for such changes; No changes  3. Specifically address the need for the Encina transformer, the cost of undergrounding in Alpine Boulevard, and the amount of undergrounding contemplated; CAISO confirmed need for transformer Status of undergrounding not changed, Two alternatives  4. Any engineering difficulties encountered in constructing the project; No changes  5. Total estimated project costs; $1.883 billion; unchanged  6. Actual spending to date; $156 million through 6/30/09 11

Sunrise Status  7. Any and all filings submitted to FERC for ultimate cost recovery through transmission rates; and None  8. Any additional information SDG&E believes relevant and necessary to accurately convey the status of the Sunrise project. SDG&E-Citizens Energy agreement Import Limitation at Miguel Substation Procurement activities Community outreach and environmental mitigation 12

Renewables 13

Renewable Projects in Imperial Valley  SDG&E Commitments (D p. 265) (1) refrain from contracting, for any length of term, with conventional coal generators that deliver power via Sunrise, (2) replace any currently approved renewable energy contract deliverable via Sunrise that fails with a viable contract with a renewable generator located in Imperial Valley, and (3) voluntarily raise SDG&E’s RPS goal to 33 percent by  1,900 MW Incremental Renewable Generation CAISO assumes that if Sunrise is developed 900 MW of solar thermal and1,000 MW of geothermal resources will come on line by 2015, which would result in an additional 9,900 GWh of renewable generation from the Imperial Valley.CAISO assumes that absent Sunrise, this incremental 1,900 MW of renewable generation will not come online in the Imperial Valley.(D p. 66.)  PG&E encourages offers from projects located within the Imperial Valley and projects that may create significant flows on Sunrise. (D p. 14.) 14

Resources for Sunrise Powerlink and Transmission  SDG&E website   CPUC website  For specific information related to the Sunrise Powerlink, please visit:  Proceeding number is A , changed from A  To find information on transmission projects in California, visit the CPUC website:  Or for FAQs related to Sunrise: E5155E4711AD/0/SunriseQA doc E5155E4711AD/0/SunriseQA doc 15

Q&A 16