RISK ASSESSMENT MATRIX FOR PORT INFRASTRUCTURE CHRIS EDWARDS AECOM Inc.

Slides:



Advertisements
Similar presentations
Rejuvenating Aging Port Infrastructure ADVANCED PREDICTIVE MODELLING PROACTIVE APPROACH TO ASSET MANAGEMENT PROJECTS (supported by Australian Research.
Advertisements

ENHANCING LEVEL OF SERVICE THROUGH RISK-BASED ASSET MANAGEMENT Greg Norby, P.E. General Manager Vivian Housen, P.E. Principal, VWHA Northern California.
Copyright SIEP B.V.. The Risk Assessment Matrix Bringing It To Life.
BI Project Business Intelligence Cookbook A Project Lifecycle Approach Using Oracle Technology John Heaton.
Crack Management – Part II Feedback From In-Service Inspections Based upon OTC “FPSO Fatigue Assessment: Feedback From In-Service Inspections” Clemens.
Reliability Risk Assessment
Chapter 10 Ranking and Value Management of Computer System Performance.
SQM - 1DCS - ANULECTURE Software Quality Management Software Quality Management Processes V & V of Critical Software & Systems Ian Hirst.
By: Ashwin Vignesh Madhu
Risk Evaluation Determines the relative seriousness of hazard risks as they affect the local community Session 20.
Session 141 Vulnerability to a natural hazard can be defined as to the extent to which people will experience harm and property will be damaged from that.
Sanjay Goel, School of Business/Center for Information Forensics and Assurance University at Albany Proprietary Information 1 Unit Outline Qualitative.
7-1 Risk Management. 7-2 Risk Risk (in general, in finance): deviation, variance The change can be positive or negative Project risk: any possible event.
Sustainment Management Systems
Change Request Management
DELIVERING SAFE & RELIABLE OPERATION
Slide © The McGraw-Hill Companies, Inc., 2006 Property, Plant, and Equipment; Depreciation and Depletion l At the same time, we also look at:  Gain.
Corrosion and Condition Assessment of Galvanized Steel Reinforcement in Concrete Structures Dr. Jane Jieying Zhang Critical Concrete Infrastructure October.
NACMPI November 15-16, 2005 Risk-Based Inspection Dr. Barbara Masters Administrator, Food Safety and Inspection Service Philip Derfler Assistant Administrator,
Title: Port Security Risk Assessment Tool (PSRAT) Author:Tony Regalbuto Chief, Office of International & Domestic Port Security Assessments United States.
Sykora & Holicky - Durability Assessment of Large Surfaces… 1 Durability Assessment of Large Surfaces Using Standard Reliability Methods M. Sykora & M.
Leen Vooijs Implementing risk based maintenance concepts.
Risk Management & Liability Informa Brownfield Hospital Development Summit June 2009.
Lecture 32 Risk Management (Cont’d)
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Qualitative Risk Assessment Risk Analysis for Water Resources Planning and Management Institute for Water Resources 2008.
Lecture 7 Risk Analysis CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Materi. Introduction There are two general types of maintenance : Reactive and Proactive Maintenance Reactive maintenance is performed in response to.
Thomas Pettersson Andreas Lindhe and Lars Rosén Identification and management of risks in water safety planning Decision support method using multi-criteria.
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
Value of Subsurface Data in Transportation Steven P. DiBenedetto, CPG Senior Geoscientist & Technology Manager Chris Clark Mid Atlantic Director of Business.
Hazard and Risk Assessment
US Army Corps of Engineers Coastal and Hydraulics Laboratory Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and.
Managing Railway Bridges Bryant Le Professor John Andrews.
Doğalgaz Sektöründe Varlık Yönetimi ve Gaz Kalitesi Consistent Asset Management and Harmonised European Gas Quality INGAS 2009 Istanbul 9-10 June 2009.
R&D PROGRAM RISK ASSESSMENT Yuri Tsenkov UNWE – DNRS.
Climate Change Adaptation Workshop Our greatest risks and how we identified them in the project: Highways and Transport.
Information Technology Project Management Managing IT Project Risk.
1  The objective of operational risk management is the same as for credit, market and liquidity risks that is to find out the extent of the financial.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
Organizational Process The activities conducted by an educational institution or school is called organizational process Which consist of series of steps.
Title: Port Security Risk Assessment Tool (PSRAT) Author:Tony Regalbuto Chief, Office of International & Domestic Port Security Assessments United States.
= the matrix for T relative to the standard basis is a basis for R 2. B is the matrix for T relative to To find B, complete:
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
CYSM Risk Assessment Methodology Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme.
A Risk Based Approach to Asset Management of Alcoa’s Civil Infrastructure in WA Presented by DENNIS FOO, Industrial Maintenance Roundtable ( IMRt )
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Methods of Assigning Probabilities l Classical Probability; l Empirical Probability; and l Subjective Probability l P (A) = N(A) / N l P (X) = ƒ (X) /
Updated Risk Management template
THE INTEGRITY ENGINEER’S TOOLBOX: MANAGING AGEING ASSETS AGIT Gas Speak Colloqium, Sept 2015 Markus Seitz, Integrity Engineer, APA Group, Perth.
Optimisation Modelling for Roads through an Outsourced Service
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
Risk Assessment.
Source: CBS 5 (KPHO Broadcasting Corporation) Peggy A. Johnson
Air Carrier Continuing Analysis and Surveillance System (CASS)
بسم الله الرحمن الرحيم قَالُوا سُبْحَانَكَ لا عِلْمَ لَنَا إلاَّ مَا عَلَّمْتَنَا إنَّكَ أَنتَ العَلِيمُ الحَكِيمُ صدق الله العظيم ( البقرة 32 )
David Conkel, MnDOT State Aid Bridge Davide Hedeen, MnDOT Bridge
Evaluating Non-Leak Threats
Transmission Planning in a Modern Market Environment
Optimisation Modelling for Roads through an Outsourced Service
Sea water Reverse Osmosis
Detecting, reporting & investigating data breaches under GDPR
BHOPAL Industrial Disaster Management Cycle: OECD 2004.
Conducting a Target Hazard Analysis for Your Community
INDIAN SCHOOL AL WADI AL KABIR DEPARTMENT OF COMMERCE
Oldham Council Safety Inspections
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
The Technical Opportunities and Economic Implications of Permafrost Decay on Public Infrastructure in the Northwest Territories Ed Hoeve, P. Eng., TetraTech.
Presentation transcript:

RISK ASSESSMENT MATRIX FOR PORT INFRASTRUCTURE CHRIS EDWARDS AECOM Inc

Ports have a variety of infrastructure subject to deterioration. The most severe deterioration occurs on the main working assets such as wharves and jetties, principally from chloride attack on steel. Assets must be kept in good working condition within tight budgets Asset managers need to prioritise their maintenance programs to be able to plan for future budgets. Often this is done on the basis of condition alone and ignoring the consequences of loss of service or failure

The AECOM Risk Assessment Deterioration Model (RAM) is a tool that allows assets to be ranked according to their requirement for maintenance based on condition and consequence of loss of service or failure

Time Dependent Deterioration Time Dependent Chloride Ingress & Corrosion

Repairs should be timely The ranking of assets allows: Remediation to be prioritised and scheduled Multi-year maintenance budgets to be estimated with confidence

1. Select the Likelihood Rating based on the data points 2. Select the weighting for each data point 3. Calculate the Likelihood Multi Criteria Assessment 4. Select the Consequence Ranking 5. Select the Consequence Weighting 6. Calculate the Consequence Multi Criteria Assessment Calculate the Severity of Risk The AECOM RAM is a multi-step process based on Likelihood and Consequences

Likelihood Ranking

Likelihood Weightings

Likelihood Multi Criteria Assessment Pier Cap Deck Soffit Dolphin

Consequence Ranking

Consequence Weighting

Consequence Multi Criteria Assessment

Total Score = Likelihood + Consequence

THANK YOU