LCWS 2010 Amann - 3/26/10 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer SLAC National Accelerator Laboratory.

Slides:



Advertisements
Similar presentations
Photon Collimation For The ILC Positron Target Lei Zang The University of Liverpool Cockcroft Institute 24 th March 2007.
Advertisements

Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Introduction to Plasma-Surface Interactions Lecture 6 Divertors.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Relevant Thermal-Hydraulic Aspects in the Design of the RRR A. Doval, C. Mazufri F.P. Moreno Bariloche, Rio Negro, Argentina.
Lh 2 target for an 11 GeV Møller - prospect - S. Covrig hall c, jlab 14 august 2008 hp lh 2 targets for pv q weak target design cooling.
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Thermo Fluid Design Analysis of TBM cooling schemes M. Narula with A. Ying, R. Hunt, S. Park ITER-TBM Meeting UCLA Feb 14-15, 2007.
R. ArnoldDumps - LCWS08, 19 Nov Heat and Radiation in the Water and Shielding in the18 MW Water Dump for ILC Preliminary Results from FLUKA, FLUENT.
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
Thermal Analysis of Helium- Cooled T-tube Divertor S. Shin, S. I. Abdel-Khalik, and M. Yoda ARIES Meeting, Madison (June 14-15, 2005) G. W. Woodruff School.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
MuCool Absorber Review meeting FermiLab, Chicago 21 – 22 February 2003 Fluid Flow and Convective Heat Transfer Modelling by Wing Lau & Stephanie Yang Oxford.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
Experimental Verification of Gas- Cooled T-Tube Divertor Performance L. Crosatti, D. Sadowski, S. Abdel-Khalik, and M. Yoda ARIES Meeting, UCSD (June 14-15,
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
The JPARC Neutrino Target
A discussion paper for the Absorber Review pre-meeting on February 11 th 2003 On 3-D Fluid Flow calculations on the 22cm Absorber Window By Stephanie Yang.
June19-21, 2000Finalizing the ARIES-AT Blanket and Divertor Designs, ARIES Project Meeting/ARR ARIES-AT Blanket and Divertor Design (The Final Stretch)
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
Norbert Tesch (DESY) – Design Studies for an 18 MW Beam Dump at TESLA – ICRS 10 / RPS 2004 – Madeira – May Norbert Tesch, A. Leuschner, M. Schmitz,
ISIS Second Target Station
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Pro-Science 4 th International Conference of Hydrogen Safety, September 12-14, 2011, SAN FRANCISCO, USA EXPERIMENTAL STUDY OF IGNITED UNSTEADY HYDROGEN.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Update on Thermal Performance of the Gas- Cooled.
Study of a new high power spallation target concept
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
Summary Why consider a packed bed as a high power target?
Date Event Global Design Effort 1 Overview of Mechanical Engineering Design Progress for LC 18MW Beam Dump CLIC08 10/16/08 (From left) Dieter Walz, Ray.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
IAEA Meeting on INPRO Collaborative Project “Performance Assessment of Passive Gaseous Provisions (PGAP)” December, 2011, Vienna A.K. Nayak, PhD.
1 Parametric Thermal-Hydraulic Analysis of TBM Primary Helium Loop Greg Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI.
Contents Beam Dump Work Program submitted to UK funding agencies Motivation to study pressure waves Progress so Far -Energy Deposition -Pressure wave calculation.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
DCLL ½ port Test Blanket Module thermal-hydraulic analysis Presented by P. Calderoni March 3, 2004 UCLA.
Simple CFD Estimate of End Flange Tuner Finger Cooling.
Recent Studies on ILC BDS and MERIT S. Striganov APD meeting, January 24.
Parameters of the NF Target Proton Beam pulsed10-50 Hz pulse length1-2  s energy 2-30 GeV average power ~4 MW Target (not a stopping target) mean power.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski, B. H. Mills and M. D. Hageman G. W. Woodruff School of Mechanical Engineering Correlations for Divertor Thermal-Hydraulic.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
R. ArnoldCLIC08, CERN, 16 Oct Heat and Radiation in the Water and Shielding in the18 MW Water Dump for ILC Preliminary Results from FLUKA and FLUENT.
Multi-Microhannel Cooling Model Silicon Micro-Cooling Element to be applied on a pixel detector of CERN (ALICE) / Parametric Study Footprint area: (6.0.
Numerical Model of an Internal Pellet Target O. Bezshyyko *, K. Bezshyyko *, A. Dolinskii †,I. Kadenko *, R. Yermolenko *, V. Ziemann ¶ * Nuclear Physics.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Page 1 of 19 Design Improvements and Analysis to Push the Heat Flux Limits of Divertors M. S. Tillack, X. R. Wang, J A. Burke and the ARIES Team Japan-US.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
G.Kurevlev - Manchester meeting1 Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
7/8/08 John Amann LC Mechanical Engineering LC 18M W Beam Dump Mechanical Engineering Design Updates.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
New nTOF target: Design Issues
ILC main dump issue AWLC /26
WATER AND LEAD-BISMUTH EXPERIMENTS: FLUENT AND STAR-CD SIMULATION
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
DCLL TBM Reference Design
Dump Window Cooling Sleeve 3D Models for CFD
Beam Window Studies for Superbeams
CFD-Team Weekly Meeting - 8th March 2012
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Beam Dump outline work plan (UK perspective)
Presentation transcript:

LCWS 2010 Amann - 3/26/10 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer SLAC National Accelerator Laboratory LC Beam Delivery Systems

Global Design Effort 2 Outline Introduction. Mechanical Design Concept. Beam Parameters used for FLUKA studies. FLUKA studies. Thermal-hydraulic studies (conjugate heat transfer). Summary. LCWS 2010 Amann - 3/26/10

Global Design Effort 3 Introduction ILC Beam Dump Design Team SLAC National Accelerator Laboratory: J. Amann, R. Arnold, D. Walz, A. Seryi Bhabha Atomic Research Centre: P. Satyamurthy, P. Rai, V. Tiwari, K. Kulkarni Starting Point for Work SLAC 2.2 MW Water Dump, The Stanford Two-Mile Accelerator, R.B. Neal Ed, (1968). High Power Water Beam Dump for a LC, M. Schmitz, TESLA Collaboration Meeting, 16 Sept ILC Main Beam Dumps -- Concept of a Water Dump, D. Walz Snowmass, 18 Aug Dumps and Collimators, ILC Reference Design Report, 2007 T. Davenne, O. Caretta, C. Densham and R. Appleby, Pressure Transients in the ILC Beam Dump, LC-ABD Collaboration meeting, Birmingham University, 17 April 2008 LCWS 2010 Amann - 3/26/10

Global Design Effort 4 The task force team studied the various aspects of the SLAC’s 2.2MW water beam dump and used it as the starting basic reference design for an ILC Beam dump, since it has all features required of an ILC beam dump (but at a lower power level) but proven design. This includes the use of a vortex-like flow pattern to dissipate and remove the energy deposited by the beam, the beam dump entrance window and its special cooling method, a remote window exchange mechanism, a hydrogen re-combiner, handling of radioactive 7 Be, a tail catcher to attenuate the residual beam energy remaining after the vortex flow region, as well as related primary and secondary cooling loops. Introduction LCWS 2010 Amann - 3/26/10

Global Design Effort 5 Mechanical Design Concept The 18MW LC beam dump mechanical design is driven by parameters and constraints developed from FLUKA simulations, CFD thermal hydraulic simulations and analytic calculations. The existing 2.2MW SLAC beam dump provides a baseline mechanical design to consider features which might be incorporated into the 18MW beam dump mechanical design concept. The first step in creating a mechanical design concept for the beam dump is to establish the basic mechanical design parameters of the beam dump vessel and thin window. The beam dump is a pressurized vessel containing heated and radioactive water and consequently for operation within the USA, must conform to the design and safety standards of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code. LCWS 2010 Amann - 3/26/10

Global Design Effort 6 Mechanical Design Concept Table of Beam Dump Design Parameters and Constraints Operating Parameters Maximum Operating Temperature<180°C Maximum Operating Pressure20bar or 290psi Minimum Operating Pressure10bar or 145psi Beam Dump Vessel Internal diameter1.8m Length10m Beam Dump Inlet Headers Up beam end of vessel8” (203mm) ID with longitudinal slots Inlet header location0.7m from center on horizontal plane Beam Dump Outlet Header Up beam end of vessel10” (254mm) ID with perforations all around Outlet header locationCenter axis of vessel Beam Dump Thin Window Hemispherical shapePressure on concave side Internal diameter300mm Maximum thickness1mm Window location m from center of vessel vertical plane Window coolingSingle water jet LCWS 2010 Amann - 3/26/10

Global Design Effort 7 Mechanical Design Concept Vessel Shell Outlet Header Inlet Headers Thin Window Flat Heads Window Cooling Nozzle Supply Pipe LCWS 2010 Amann - 3/26/10

Global Design Effort 8 Mechanical Design Concept Mechanical Design Parameters (ASME BPVC Div. VIII) Vessel Material – 316LN Minimum Shell Thickness – 21mm Minimum Flat Head Thickness – 70mm Window Material – Ti-6Al-4V Max. Design Pressure, 1mm Thick Hemispherical Window – 32bar or 464psi LCWS 2010 Amann - 3/26/10

Global Design Effort 9 Mechanical Design Concept Thin Window Window Cooling Nozzle LCWS 2010 Amann - 3/26/10

Global Design Effort 10 Coolant Loop LCWS 2010 Amann - 3/26/10

Global Design Effort 11 Beam Parameters The following beam parameters have been taken as reference for designing the beam dump: Electron/Positron energy: 500 GeV Number of electrons/positrons per bunch:2x10 10 Number of bunches per train:2820 Duration of the bunch train:0.95 ms Beam size:σ x = 2.42mm σ y = 0.27 mm Energy in one bunch train:4.5 MJ Number of bunch trains per second:4 Beam power:18 MW Beam sweep radius:6 cm LCWS 2010 Amann - 3/26/10

Global Design Effort 12 Energy Density Modulation Around Sweep Path Interaction of electrons/positrons with Beam Dump (FLUKA Studies) LCWS 2010 Amann - 3/26/10

Global Design Effort 13 Interaction of electrons/positrons with Beam Dump LCWS 2010 Amann - 3/26/10

Global Design Effort 14 Interaction of electrons/positrons with Beam Dump Energy deposited by one bunch train in the water (beam travelling along z-axis) z=1.8m Radially integrated longitudinal linear power density z=2.9m LCWS 2010 Amann - 3/26/10

Global Design Effort 15 Interaction of electrons/positrons with Beam Dump Longitudinal Power Density in Vessel Wall (20mm thick 316L SS) r=35cm LCWS 2010 Amann - 3/26/10

Global Design Effort 16 Interaction of electrons/positrons with Beam Dump Heat Flux – Down Beam Head LCWS 2010 Amann - 3/26/10

Global Design Effort 17 Interaction of electrons/positrons with Beam Dump A FLUKA analysis was carried out to determine the beam power distribution in the thin window. The total power deposited is ~25 W with a maximum power density of 21W/cm 3. Functional fitted data is the input for the CFD analysis. W/cm 3 LCWS 2010 Amann - 3/26/10

Global Design Effort 18 Thermal hydraulic Studies(by FLUENT) Velocity contours at z = 2.9mSteady state temperature distribution at z = 2.9m (Max average temperature : C ) Total mass flow rate of water taken was 190kg/s. Water inlet was assumed to be at 50 0 C as dictated by the primary coolant loop. The bulk outlet temperatures would be ~73 0 C for 18 MW average beam power. The water inlet velocity at the slit exit is 2.17 m/s. LCWS 2010 Amann - 3/26/10

Global Design Effort 19 Thermal hydraulic Studies-cont. Maximum temperature ~155 0 C and variation with time ~30 0 C Maximum temperature ~135 0 C and variation with time ~36 0 C Maximum temperature variation as a function of time at z = 2.9m Maximum temperature variation as a function of time at z = 1.8 m LCWS 2010 Amann - 3/26/10

Global Design Effort 20 Thermal hydraulic Studies-cont. max vessel temperature C min vessel temperature C Temperature distribution in the vessel at z = 2.9m for the 0.45m radial beam location Temperature distribution in the vessel at z = 4.2m for the 0.45m radial beam location max vessel temperature C min vessel temperature C LCWS 2010 Amann - 3/26/10

Global Design Effort 21 Thermal hydraulic Studies-cont. Window Cooling - Work In Progress LCWS 2010 Amann - 3/26/10

Global Design Effort 22 Thermal hydraulic Studies-cont. Window Cooling - Work In Progress LCWS 2010 Amann - 3/26/10

Global Design Effort 23 Thermal hydraulic Studies-cont Flat Head Cooling - Work In Progress LCWS 2010 Amann - 3/26/10

Global Design Effort 24 Thermal hydraulic Studies-cont. Flat Head Cooling - Work In Progress LCWS 2010 Amann - 3/26/10

Global Design Effort 25 Inlet header studies-(In progress) Design of Inlet Headers Flow analysis in the Header indicated that there was significant velocity component along z- direction (v z ) in the initial exit region of the Header, reducing the required outlet v Φ (Φ component of the velocity). In order to enhance (v Φ ) and reduce the v z, two alternative approaches are currently being considered; i) providing flow blocks at various locations in the exit slit of the Header, ii) providing water to the Header by multiple pipes along the z. The final configuration will be based on the outcome of this analysis. LCWS 2010 Amann - 3/26/10

Global Design Effort 26 Water inlet Water outlet Flow blocks each of width of 5mm Exit nozzle of inlet header each of length 95mm Configuration-1 Configuration-2 Water outlet water inlet pipes with 1 meter spacing along the water inlet Header Inlet header studies-(In progress) LCWS 2010 Amann - 3/26/10

Global Design Effort 27 FLUKA Studies Preliminary Activation Studies – First Design Concept LCWS 2010 Amann - 3/26/10

Global Design Effort 28 Summary Mechanical design concept under development. –Basic mechanical parameters established. More detailed analysis of inlet header in progress –Window sealing design and remote exchange system still needs work. –Preliminary process design complete. Thermal-hydraulic studies nearly complete. –Beam dump parameters determined by physics. –Inlet headers, outlet header, and window locations optimized. –Working to finalize window cooling and down beam head cooling. Shielding design and overall system integration still needs work. Future work we feel is critical. –Build a scaled down version of beam dump to verify FLUENT studies. –Beam damage testing of thin window materials. LCWS 2010 Amann - 3/26/10