SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.

Slides:



Advertisements
Similar presentations
Chris Adolphsen. Department Programs International Linear Collider (ILC) –All ILC areas except for ATF2 (APE and Test Facilities) FNAL Project X –L-band.
Advertisements

Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
CERN Phase II Collimation Conceptual Review Summary 09 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
Stefano Redaelli on behalf of the Collimation Project, HL-LHC-WP5, EuCARD, US-LARP teams LHC Collimation Upgrade plans The HiLumi LHC Design Study is included.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
AdColMat: Status of the Working Group and Recent Advancements Working Group on Advanced Materials for Collimators 4 th Meeting - 21/7/2014 A. Dallocchio.
News and hot topics Impedance meeting 14/04/2014.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Phase II Collimators: design status, options and future outlook LHC.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SPS High Energy LSS5 Thermal contact & cooling aspects
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
on behalf of the Phase II Collimation Design team
News and Introduction from CERN June 15th, 2005
Motivations and Introduction to MultiMat Experiment in HiRadMat
LARP Phase II Secondary Collimator RC1
Review on collimator movement with stepping motors
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
TDI Coating test at HiRadMat Proposal 1605 HiRadMat Scientific Board Meeting 27th June 2016 I. Lamas Garcia, M. Calviani, R. Ferreire, A. Perillo-Marcone.
Federico Carra – EN-MME
2th EuCard Col/Mat WP Meeting
Review on collimator movement with stepping motors
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
CERN, Geneva, Switzerland PAC 2003 – Portland, Oregon, USA
Discussion on the TDI impedance specifications
LHC Morning Meeting - G. Arduini
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
HiRadMat Test Facility
LARP Phase II Secondary Collimator RC-1
Collimation margins and *
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
US LHC Accelerator Research Program
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
RC1 Prototype Conceptual Design Review 15 December, 2005
LARP Phase II Secondary Collimator RC-0 and RC-1
Advanced Collimator Ideas
Presentation transcript:

SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program CERN – LHC Collimation Project

Two jaw collimator made of Glidcop; same dimensions as the standard LHC collimator; possibility to rotate the jaws if the surface is damaged by beam accidents. Advantages: Not exotic material High Z for efficiency Low resistance for impedance Elemental for high radiation resistance Disadvantages: Glidcop WILL be damaged in asynchronous beam abort Complex design – robustness against worst-case scenarios needs to be validated. What is RC (rotating collimator)? HiRadMat Scientific Board Meeting - 14 March 2014

Jaw Design HiRadMat Scientific Board Meeting - 14 March 2014

RC Prototype with Apertures Designed for Testing in SPS beam HiRadMat Scientific Board Meeting - 14 March 2014

SLAC design details Ratchet Gear Drive RC-0 Jaw (copper) RC-1 Jaw (Glidcop) LHC IR7 Style BPM Buttons 4 per end LHC IR7 Style BPM Buttons 4 per end Flex Support Tank geometry allows a 60mm facet-to-facet gap in fully retracted Jaw position Tank geometry allows a 60mm facet-to-facet gap in fully retracted Jaw position Ferrite could mount to Base Plate facing Jaw facet Ferrite could mount to Base Plate facing Jaw facet BPM assemblies at each end are fiducialized to Collimator Base Plate Drive Mechanism RF foils carry image current and shields Rot. Mech. HiRadMat Scientific Board Meeting - 14 March 2014

Verify that the rotation mechanism will continue to operate after beam impact Measure the full extent of the GlidCop collimator jaw that melts and vaporizes as a function of deposited energy Determine the extent of the molten and vaporized spray released from the surface, how far it travels and how it congeals to the hit surfaces. Effect on other jaw? Verify that the water cooling circuit survives a beam impact with no water to vacuum leak. Determine if nearby facets will get deposited with molten material from a hit facet. Measure permanent deformation (jaw bending?) from beam impact. Note: this goals can be achieved without additional instrumentation (standard collimator alignments with pilot beam, existing BLMs) HiRadMat Test Goals HiRadMat Scientific Board Meeting - 14 March 2014

On-line measurements: - Standard positioning system (jaw monitoring) - Usual beam orbit and BLMs - Transient vacuum and temperature during impacts Post mortem (main conclusions expected from this!) - SPS RC Prototype has 15 view ports: Visual or camera viewing Laser micrometers to measure deformation? - Eventually open the vacuum tank for detailed inspection and metrology measurements on jaws. Diagnostics HiRadMat Scientific Board Meeting - 14 March 2014

The SLAC collimator was delivered to CERN in Dec. 2013! The delivered prototype looks very nice. “Pity” to do only HRM destruction tests. Presently exploring its “machine readiness” for other beam tests. Short Status of RC collimator prototype HiRadMat Scientific Board Meeting - 14 March 2014

Status and timeline of CERN tests Our test program plans to address: - Vacuum aspects (so far, leak tests are ok) - Transverse positioning accuracy of jaws - Jaw rotation mechanism - Impedance of present tank design (trapped modes). Timeline: expect main results by the end of April 2014 (planning to report status at the US-LARP CM22 in BNL) IF the RC SLAC prototype is compatible with SPS or LHC, we will consider testing it with circulating beams before carrying out the HRM destructive beam tests! HiRadMat Scientific Board Meeting - 14 March 2014

Conclusions HiRadMat Scientific Board Meeting - 14 March The HRM test with the SLAC RC collimator was presented. This is an advanced “consumable” collimator concept relying on rotatable jaws, providing in theory 20 catastrophic failures per jaw before being replaced. - Before relying on such advanced concept, beam tests are deemed necessary to assess the rotation mechanism functionality after beam impacts. Tests at HRM are crucial to validate this design. - The SLAC collimator is now at CERN and will be ready anytime to HRM - This device was conceived and built by SLAC within a strong collaboration with USA: we are committed to get as much a possible out of this design. - We are therefore exploring the possibility to test this device also with circulating beams before performing destructive tests at HRM! - We will have the indications of the feasibility to install it in the SPS (or even LHC) in about 2 months. Decide then on the HRM plans for Will propose to postpone this experiment by 1 (or 2) year if we conclude that other beam tests will be needed before.

Other upcoming collimation experiments at HRM 1.RC SLAC tests 2.Individual collimator jaws with advanced design/materials 3.Collimator jaw with embedded wire for long-range beam- beam compensation schemes. 4.Material sample characterization against shock impacts 5.Present CFC collimator robustness with HL-LHC injected beams (done in the past at TT40, with nominal LHC case) HiRadMat Scientific Board Meeting - 14 March 2014