Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding.
Department of Public Works Bureau of Street Services Cynthia M. Ruiz President Department of Public Works.
Chelan County Stemilt Loop Full Depth Reclamation, Phase II: Stemilt Loop Road is a Rural Minor Collector located in the Wenatchee Heights. The road serves.
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
1 Resurfacing and Curb Ramps. 2 FHWA’s Americans with Disabilities Act Program / Section 504 of the Rehabilitation Act of 1973 The primary purpose of.
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
COUNTY OF SAN DIEGO DEPARTMENT OF PUBLIC WORKS County of Los Angeles Public works 2015 Sustainable Pavement Round Table February 10, 2015.
City of Burien Pavement Condition Index (PCI) Presented to Council March 1, 2010 Ambaum Blvd SW & SW 134 th St. S 181 st btwn 4 th & 5 th Ave S SW 158.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
The Dalles Pavement Preservation Program Presented by Bill Barrier Transportation Manager City of The Dalles Public Works Department.
5 August :40 a.m.SIST Final Presentation1 The Development of a Pavement Management System at Fermilab Through the Implementation of Micro PAVER 5.1.
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Pavement Evaluation Survey Results and Understanding Condition Values PCI February 19, 2014.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
Department of Public Works Bureau of Street Services Valerie Lynne Shaw President Department of Public Works.
City Transportation Funding Overview House Transportation Committee January 13, 2004 Ashley Probart AWC Transportation Coordinator.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
2014 Budget Department Presentations Infrastructure Funding Options.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Washington State Transportation Commission March 20, 2007 Jeff Monsen, PE Intergovernmental Policy Manager.
Pavement Preservation Preventive Maintenance
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
February 10, 2015 Martin Lang, MPA Deputy Director of Field Operations.
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Maintenance & Rehabilitation Strategies Lecture 5.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Douglas County Road Maintenance Funding June 27, 2011.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Statewide Transportation Funding At Risk Your Name or Agency Date RTPA RCTF.
Presentation to the Washington Transportation Commission March 16, 2010 Washington State Association of County Engineers.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
We maintain streets with half the materials budget that we in had Due to inflation, today's dollar buys only half the materials it did in Therefore,
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
1. Accurate & Timely intelligence shared by all 2. Effective tactics and strategies 3. Rapid deployment of resources 4. Relentless follow-up and assessment.
1 Presented to the City Council by Horatio Porter, Budget Officer September 15, 2009 Overview of FY2010 Budget.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
A Data-Driven Strategy to Improve the Quality
Transportation Development District Presentation
Roadway Pavement Management Plan
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Street Improvement Plan
Pavement condition index calculation
Pavement Preservation
Illinois’ Joint Research Adventure
Pavement Preservation Philosophy utilizing Pavement Management Systems
Presentation transcript:

Department of Public Works Bureau of Street Services Cynthia M. Ruiz President Department of Public Works

PROFESSOR POTHOLE PRESENTS Everything You Always Wanted To Know About Streets, Trees and Sidewalks William A. Robertson Director Bureau of Street Services Rev. Oct 2008

HOW BIG IS LOS ANGELES?

6,500 Centerline Miles 28,000 Lane Miles CITY OF LOS ANGELES Largest municipal street system in the United States 69,507 Segments

THE STREET SYSTEM

Current Condition Assessment 6,500 miles street system 800 miles of alleys Approximately 1,000 miles of failed streets Overall system condition is a C-

How Did We Get In This Mess? Prior to World War II the City was comprised of approximately 2,500 miles of paved streets and the Annual Resurfacing Program (ARP) consisted of 50 miles. After World War II, and the rapid growth of the San Fernando Valley the street system grew to 6,500 miles. Up until 1986, the ARP still consisted of only 50 miles of resurfacing. From 1987 to the early 1990’s, the ARP was increased to approximately 150 miles. Fiscal Year , the Bureau was funded for its first 200 mile ARP. This year the ARP is funded at 235 miles.

HOW DO WE FIX THIS MESS?

10 Year Plan Maintenance –Slurry Seal –Crack Seal –Pothole Repairs Rehabilitation –Overlays –Resurfacing –Reconstruction $35 Million for Maintenance $115 Million for Rehabilitation

ANNUAL RESURFACING PROGRAM

Budget Allocation Formula Old Method Total Maintained Centerline Miles in CD Council District = x 100% AllocationTotal Maintained Centerline Miles Citywide

Budget Allocation Formula Current Method Three factors are contemplated in the BAF Pavement Condition: The condition factor is included to address the need for Pavement, Resurfacing or Reconstruction due to deteriorated conditions in a particular district and to take into account user comfort. Pavement Area: The area factor is considered due to the varying size of the pavement areas (or lane miles) in the different Council Districts. Bus/Truck Traffic: The bus/truck traffic factor is included to address the effects of buses/trucks traffic factor on increase pavement thickness and consequently on the cost of resurfacing or reconstruction.

How Are Streets Selected? Street selection for the Annual Resurfacing Program is based on the Bureau’s Pavement Management System: –Defines the existing condition of streets. –Determines the most economical maintenance and rehabilitation strategy. –Predicts future condition of the street network based on different budget scenarios.

Funding Sources Annual Resurfacing Program Gas Tax $31,225,703 Proposition C 11,089,626 General Fund 2,509,848 Surface Transportation Program Fund 11,295,606 Prop 1B 27,900,000 $84,020,783

Why Don’t We Fix The Worst Streets First? 80/20 Allocation Plan 80% Overlays/Resurfacing 20% Reconstruction Spending more in reconstruction or using a “worst first” strategy would greatly reduce the number of streets resurfaced and cause an acceleration in the decline of the overall condition of the street system.

Typically 20% of the budget is allocated towards failed streets. ExcellentGoodFairPoor Failed Slurry Overlay ACDF 20% 80% $1$2$4$7 * * of the budget allocation. B MicroPaver Budget Allocation

PAVEMENT MANAGEMENT PROGRAM

Benefits of a Modern Pavement Management System Justifies different funding level requests. Provides information to make efficient use of available resources. Produces quantified and accurate information. Tracks pavement performance. Identifies current and future maintenance & rehabilitation (M&R) needs. Selects cost-effective repair strategies. Predicts future pavement condition based on different budget scenarios.

Micro PAVER A Pavement Management System developed by the US Army Corps of Engineers, Champaign, IL. Adopted by: –The Federal Aviation Administration (FAA) –Federal Highway Administration (FHWA) –US Army –US Air Force –US Navy

Condition Analysis Pavement Condition Index (PCI) Excellent Very Good Good Fair Poor Very Poor Failed PCI Distress Severity Distress Quantity Distress Type ASPCC

Condition Prediction Modeling

Condition Prediction San Pedro St 18 th St to Washington Bl PCI: 51 07/12/04 Grand Av Olympic Bl to 11 th St PCI: 71 07/12/04

Maintenance and Rehabilitation (M&R) Work Planning Maintenance Rehabilitation Pothole Repairs Crack Sealing Slurry Sealing Overlays Resurfacing Reconstruction

Pavements need to be managed, not simply maintained. Why Use Pavement Management?

PRESERVATION OF THE STREET SYSTEM

Rubberized Slurry Seal An emulsion mixture of oil, rubber, and fine sand. A preservative application (sealant) that: –Inhibits oxidation of the oils from the pavement. –Deters asphalt cracking. –Prevents water from seeping into the sub-base. –Extends the streets serviceable life, thereby reducing the need for repaving.

Slurry Seal Operations

Fresh, clean, and new appearance for neighborhoods.

25,935 Waste Tires are recycled for every 100 miles of streets slurry sealed. Environmental Benefits Reduction in dust and noise pollution. Eliminates noxious odors during on-site mixing of materials.

Innovations In Asphalt Technology Cold In-Place Recycling – The key to addressing failed streets in our neighborhoods.  25% to 35% more cost effective than conventional reconstruction.  Less invasive to local neighborhoods.

Pavement Preservation What Have We Gained? Pavement Preservation Program has grown from 310 miles in 2002 to 735 miles in 2008… 137 percent increase. Ten million dollars allocated to rebuild the Metro Asphalt Plant to run a recycled mix. For the first time since World War II the overall street system’s PCI will not decline.

SIDEWALK REPAIR PROGRAM

Historical Look At The City’s Sidewalk Policy The State of California Improvement Act of 1911 provides cities the authority to require property owners to effect repairs to sidewalks abutting their property (California Streets and Highways Code). Should the property owner fail to effect such repairs, city forces are authorized to make the repairs and the property owner is assessed for the cost. However the Los Angeles Municipal Code (Section , Ordinance No. 146,040 effective July 3, 1974) exempts homeowners from the responsibility for sidewalk repairs caused by tree root growth and places responsibility for these repairs with the City. The Bureau encourages property owners to effect voluntary repairs through the issuance of a no-fee “Class A” permit.

Historical Between 1978 to 2000, no full scale permanent sidewalk repair program existed in the City. In the interest of public safety, the Bureau made repairs with asphalt at no direct cost to the property owner. For the first time in 25 years, a budget was approved in the budget for approximately $9 million to permanently repair 46 miles of the most damaged sidewalks. In , the Sidewalk Repair Program was again funded and increased to repair an additional 98 miles of sidewalks Fiscal Year , the Mayor and City Council increased the program by 20 miles to a total of 118 miles.

Criteria For Sidewalk Repair Areas where slip, trip and fall accidents have occurred. Where tree roots have raised the sidewalks within American with Disabilities Act “transition areas”, as determined by the Department of Disability. Where paths of travel issues exist in conjunction with access ramp construction. In low and moderate income census tract areas.

Sidewalk Repair Options Grind Sidewalks Meander Sidewalks Enlarged Tree Well Reduce Sidewalk Width Rubberized Pavers Pour-in-Place Rubberized Sidewalk Sidewalk Ramping

Sidewalk Grinding

Meandering Sidewalk

Enlarged Tree Well

Reduced Sidewalk

Ramped Sidewalk

Poured-in-Place Rubberized Sidewalk Rubberized Pavers