Finger Sci (SA) Beam profile wire chamber 727 TEST BEAM SETUP Jul-Aug2012 (27.07.2012-10.08.2012) Si3 Si6 Y-inverted 26 Jura 1155 50 TOP VIEW SIDE VIEW.

Slides:



Advertisements
Similar presentations
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Advertisements

First Look at the July-August12 TestBeam Data T. Alexopoulos, G. Iakovidis, S. Leontsinis, K. Ntekas 1.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
GIF++ DAQ architecture 1. Requirements Support of SRS, VMM (UDP packets), VME Several groups can run at the same time Each group should be able to start,
July test beam DAQ status Marcin Byszewski Konstantinos Ntekas.
C-Card and MMFE using the BNL Peak Finding ASIC (VMM1) Ken Johns, Joel Steinberg, Jason Veatch, Venkat Kaushik (U. Arizona)
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Schedule and Issues for the Mini-1 and MMFE-8 Kenneth Johns University of Arizona.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
Experience with medium-size SRS for muon tomography Michael Staib Florida Institute of Technology.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
SRS Readout System for VMM2 Sorin Martoiu, IFIN-HH (RO)
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Wing LDA CALICE Collaboration Meeting DESY Hamburg, 21. March 2013 André Welker Lennart Adam, Bruno Bauss, Volker Büscher, Reinhold Degele, Karl Heinz.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
T.K. Hemmick. Background in SoLID Trackers Studies by Richard Holmes. PVDIS w/no baffles… 2 Signal Projective Bkg non-Projective Signal MIP BKG Large.
Mini-2 and MMFE-8 Status at U. Arizona Kenneth Johns, Charlie Armijo, Bill Hart, Karen Palmer, Sarah Jones, Kayla Niu, Jonathan Snavely, Dan Tompkins University.
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
ATLAS micromegas activities (MAMMA)
Estimates of GEM chamber costs for the Solenoid spectrometer.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
Studying the efficiency and the space resolution of resistive strips MicroMegas Marco Villa – CERN MAMMA meeting Tuesday, 13 th December 2011 CERN, Geneva.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
Florida Institute of Technology, Melbourne, FL
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
2007 detectors study at CERN 1.SiPM time resolution 2.MAPD S60 3.Blue sensitive MAPD 4.New 16ch board 5.New HV.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Abstract Muon tomography for homeland security aims at detecting well- shielded nuclear contraband in cargo and imaging it in 3D. The technique exploits.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
The Slow Control System of the HADES RPC Wall Alejandro Gil on behalf of the HADES RPC group IFIC (Centro Mixto UV-CSIC) Valencia, 46071, Spain IEEE-RT2009.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
K + → p + nn The NA62 liquid krypton electromagnetic calorimeter Level 0 trigger V. Bonaiuto (a), A. Fucci (b), G. Paoluzzi (b), A. Salamon (b), G. Salina.
“Medium Term”: VFAT2 + SRS readout system
Planes, Telescope, System
KRB proposal (Read Board of Kyiv group)
Testing and Configuration for VMM1 on the mini-MMFE
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Preliminary Performance of the L2 Chamber (Side A)
Possible Upgrades ToF readout Trigger Forward tracking
Status of the Front Tracker GEM
UNIZH and EPFL at LHCb.
Overview of T1 detector T1 is composed by 2 arms
Electronics and DAQ for the GEM Detector
DESY drift chambers efficiency and track reconstruction
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

finger Sci (SA) Beam profile wire chamber 727 TEST BEAM SETUP Jul-Aug2012 ( ) Si3 Si6 Y-inverted 26 Jura TOP VIEW SIDE VIEW Si1 26 s1 s640 New movable table (π -, -80 GeV/c) z x z y y x x veto Sci SB SD 5 SB Saleve SC 5 Si1 26 s1 s640 Si6 Y-inverted 26 Si3 26 s1 s Info: T1-8, p=0.4mm, sw=0.3mm, gp=5mm X X X X X X X X T1 T2 T3 T4 T5 T6 T7 T8 XY Tmm3 Tmm2 XY Tmm5 X X X X X X X X T1 T2 T3 T4 T5 T6 T7 T8 XY Tmm3 Tmm2 XY 120 Freiburg frame -θ-θ Info: Tmm2-6, p=0.250mm, sw=0.150mm, gp=5mm XY Tmm6 XY (π -, -120GeV/c after Mon 30.07) Tmm6 Tmm5 s1 s64 s256 s1 s

x x x Ineffic= π(d 2 /4)/L 2 =0.011 for d=0.3mm & L=2.5mm L d pillars Efficiency

x x x missing Missing cluster positions pilar

Angle Resolution Normal tracks x x x x Theta (rad) 0.22mrad 0.23mrad

x x x T1 T3 T5 T7 Position Resolution

x x x T2 T4 T6 T8

Theta=20 degrees uTPC mode

T12 T34 T56 T78 ?

Theta=30 degrees

T12 T34 T56 T78 ?

Theta=40 degrees

T12 T34 T45 T56 ?

Earliest time of T1 & T2 Earliest time

mm VMM1 card Flat cable AZ adapter BNL DAQ card Analog Amplitude & time Lemo cables Avnet LX9 switch x16 mmdaq PC SDC RJ45 USB Power supply 8A/5V CL & trigger Sci trigger APV SRS FEC Mezz card FPGA Virtex-7 Trigger Eval board CL & trigger distribution RJ45 Fast trigger out (LVDS) x16 Monitor out VMM1 Readout System July 2012 x16

To Ethernet switch mMegas Detector FPGA Trigger Processor Address in Real Time 8 planes VMM1 Control And Digitizer Trigger & Clock From SRS (Givi’s card) Trigger/Clock Distribution Monitor Analog Amplitude And Time

Theta=30 degrees

T12 T34 T56

30 o 20 o 10 o 540V 530V 520V 30 o 20 o 10 o 540V 530V 520V