Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,

Slides:



Advertisements
Similar presentations
2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
Advertisements

Conclusion Kenneth Moreland Sandia National Laboratories Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company,
Financial Management.
Massachusetts Department of Elementary & Secondary Education
WAKULLA COUNTY Travel & Expense Procedures Manual Workshop September 2, 2008.
Closeout (Preparing for the End)
Financial Management for the CACFP Sponsoring Organizations.
1  AGA-DC and GWSPCA 6 th ANNUAL CONFERENCE OMB Circular A-123, Appendix A Internal Control Over Financial Reporting Innovative Approaches Jerome A. Vaiana.
Accounting System Requirements The views expressed in this presentation are DCAA's views and not necessarily the views of other DoD organizations 1 Further.
1. 2 Introduction Background Information Denver Branch Office Mobile Teams Ball Aerospace Suboffice Lockheed Martin Astronautics Suboffice Colorado Springs.
DCAA – WHO WE ARE and WHAT TO EXPECT
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
Learning Objectives LO1 Describe the conceptual audit risk model and its components. LO2 Explain the usefulness and limitations of the audit risk model.
Provisional Billing Rates
INTERNATIONAL BEST PRACTICES IN ON-SITE INSPECTIONS OF INSURERS Thomas E Power Senior Manager, Emerging Market Practice Bearing Point.
Cost Transfers Division of Financial Services – Sponsored Programs March 2014.
Understanding the Client and General Planning
University of Connecticut 1 Service Centers. University of Connecticut 2 Definition  The management of service centers is governed by University policy.
What is Program Management?
Internal Control. COSO’s Framework Committee of Sponsoring Organizations 1992 issued a white paper on internal control Since this time, this framework.
Basic Financial Requirements for DoD Government Contracting 2015 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
SAND Number: P Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 12-1 Chapter Twelve Auditing the Human Resource Management Process.
Key Risk Areas in A/E Firm Indirect Cost Rates Presented by Dan Purvine, A/E Clarity Consulting and Training, LLC.
Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
2015 VOCA National Training Conference Grant Financial Management.
Chapter 5 Internal Control over Financial Reporting
1 Surviving a Government audit Presented by Jerrold Rosenberg, CPA, CFP Gelman, Rosenberg &Freedman, CPAs 4550 Montgomery Avenue Suite 650 North Bethesda,
Time with Office of Sponsored Programs April 4, 2011 Topic: Cost Share.
Financial Management for the CACFP Sponsors of Centers.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
Conducting an Information Systems Audit
Award Monitoring Update National Science Foundation Advisory Committee for Business and Operations October 22, 2003 Mary Santonastasso, Director, Division.
Adult Education and Literacy Budget Development and Cost Allocation.
University of Minnesota Office of Internal / External Sales Fiscal Year-End Actions for Internal/External Sales Organizations.
PwC Service Contracting DCAA Interests & Initiatives March 31, 2008.
Material Control and Accountability SAND No C Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company,
Daily Management of Awards Jennifer Crockett Jennifer Crockett, Director, Sponsored Projects Finance, Columbia University Tamara Hill Tamara Hill, Manager,
Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor and Chair, Department of Industrial Engineering and Industrial Management.
Copyright © 2007 Pearson Education Canada 7-1 Chapter 7: Audit Planning and Documentation.
New Time and Material Requirements Glenn Baer March 2007.
Seminar Series Charge the Stuff that’s Easy to Defend Tim Reuter, Director Post Award Office of Sponsored Research December 5, 2013 Nuts & Bolts of Research.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
Copyright © 2007 Pearson Education Canada 1 Chapter 11: Overall Audit Plan and Audit Program.
In this note we summarise for you the most common errors that EASME found during recent audits in financial statements of completed Intelligent Energy.
Monitored Natural Attenuation of Metals and Radionuclide-Contaminated Sites Pat Brady Sandia National Laboratories Mike Truex Pacific Northwest National.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
Developing Fringe Benefit Rates What Do These Rates Include? MECA/SECA/WECA 2007 Conference on College Cost Accounting Atlanta, Georgia October 4, 2007.
Internal Control Process at Geneseo. Objectives Understand the objectives of effective internal controls Describe Geneseo’s internal control program Accurately.
Developing an Audit Program By Rodney Kocot President Systems Control and Security Incorporated Copyright © 2005 Rodney Kocot.
Recharge/Service Center: Rate Setting Overview Auxiliary Forum December 2015.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Virtual Directory Services and Directory Synchronization May 13 th, 2008 Bill Claycomb Computer Systems Analyst Infrastructure Computing Systems Department.
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
2017 Annual MAA/TCM Conference
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
The Council Budget Understanding the Budget Process
MANAGEMENT ACCOUNTING
OMI - THAMES WATER, INC ANNUAL SETTLEMENT STATEMENT CONTRACT YEAR 3
ACC 576 Competitive Success/snaptutorial.com
ACC 576 Education for Service/snaptutorial.com
ACC 576 Teaching Effectively-- snaptutorial.com
Kick-Off Meeting Administrative Items
RTI University ScorecarD
LPA Recovery for CE Costs
University of Pittsburgh
1-1 Financial Accounting. 1-2 This course is an introduction to the basic concepts and standards underlying financial accounting systems. It emphasizes.
Presentation transcript:

Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-AC04-94AL Contractor Internal Audit Directors (CIAD) Conference Nancy Davis, Director Audit, Ethics, and Business Conduct July 16, 2015

Risk Assessment Process Slide 2  Our primary risk analysis tool is the Accounting System Review (ASR)  Helps determine the nature, timing and extent of audits  The purpose is to obtain information about a contractor’s accounting system, policies, procedures, internal controls, and financial position.  Borrows heavily from the COSO model  Over 100 questions  Risk assessment is scored on:  Internal controls  Each cost category (labor, ODC’s, Travel, Materials, etc.)  Financial capability (Z Score)  Risk is assessed at the contractor level, not at the contract level

Process for Conducting Audits 3  Utilize TeamMate  Annual planning:  Relies heavily on the ASR (risk assessment scores)  Takes into account prior audit findings, number of employees, size of the contracts assigned to the contractor and the Z score.  We assign audits based on risk. High risk contractors are assigned first  We audit contractors on a three year cycle  We audit ~$300M of subcontractor costs a year  15 auditors, each auditor is assigned between audits a year, roughly 1,400 hours of audits (# of audits assigned depends on dollar value of contracts, complexity of audit and the number of PO’s to be audited)

Incorporating A-133 Audits 4  We are modifying our procedure steps to include a review of the universities A-133 and Financial Statement reports.  The purpose of the review will be to determine if there is increased risk associated with level of effort labor.  We will also review the other cost categories to include in the audit, but the primary purpose will be to determine if we can rely on the A-133 and F/S for purposes of testing level of effort reports.  Due to the fact that there is still risk associated with hourly employees, travel, subcontractors, materials and other ODCs, we will not rely on the reports for these cost categories.

Risk Assessment Process Slide 5 ASR Risk Rank Score Supplier Performance Evaluation ASR Probability of Bankruptcy # EmployeesPrior Audit Adjustment High risk with a “High” score High risks with a Blank, Poor or Unacceptable rating High risk with a “High” score High risk if less than or equal to 10 employees High risk if more than $10k in findings Low risk if greater than 100 employees Low risk if less than $2k in findings

Slide 6 Most Common Findings (Continued) Top 10 Findings by Year FY2011 FY2012 FY2013 FY2014 Billing Error $ (99,192) $ $ (24,085) $ (14,114) Incorrect Billing Rates (16,421) (188,353) (68,067) (11,008) Incorrect/Unallowable/Inconsistent Labor Categories (125,215) (20,254) (7,818) Overcharged/Undercharged Hours Labor and other Categories (3,652) 11, Unallowable Per Terms & Conditions (22,595) (13,485) (205,306) (53,551) Unsupported or No Documentation (9,065) (462,345) (214,885) (45,393) Amount Claimed / Incurred Differs from Supporting Documents invoiced (117,065) Application of final rates to audited costs/charges (30,938) (56,727) (50,156) (39,814) Charges / Costs Outside Period of Performance (5,296) (7,526) Charges / Costs Not Billed at Actual (53,097) Subcontractor claimed or billed at Prime's Labor Rates (10,329) Unreasonable (25,285) Not In Accordance with Per Diems (8,912) (18,516) (9,335) (33,703) Application of Rates to Final Per Audit Costs (Due to audit adjustment) 414,073 * (34,024) G&A not per Account System (8,132) Cost Transfers from non-SNL Contract/Unallocable to SNL (4,323) Sum of Error in Calculating Indirect Rates and Applied to Final Costs 495,698 * Total $ (213,559) $ 30,944 $ (684,505) $ (329,803)

QUESTIONS? 7