Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
R. Ostojic, WAMSDO, 19 May 2008 LHC Insertion Region Upgrade Phase I 1.Upgrade goals and milestones 2.Review of IR systems: main findings 3.The emerging.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
FCC Study Kick-off Meeting Cryogenics Laurent Tavian CERN, Technology Department 14 February 2014 Thanks to Ph. Lebrun for fruitful discussions.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HC review - 12 May 2005Luigi SERIO - AT/ACR/OP1 SECTOR COOL DOWN AND CRYOGENIC COMMISSIONING L. Serio.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
ILC Cryogenic Systems Reference Design T. Peterson M. Geynisman, A. Klebaner, V. Parma, L. Tavian, J. Theilacker 20 July 2007.
R. van Weelderen, LIUWG, IT upgrade phase I: Status of cryogenic scheme evolution (in work) Outline - Old & new layout - Design constraints.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
The integration of 420 m detectors into the LHC
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TE-CRG Activities D. Delikaris, TE-CRG.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
R. van Weelderen Overview of the LHC cryogenic system.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
FCC Refrigeration cost vs magnet temperature Laurent Tavian CERN, ATS-DO 15 February 2016.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
FCC Week 2016, Roma Cryogenics overview Laurent Tavian, CERN, ATS-DO On behalf of the FCC cryogenics study collaboration 14 April 2016.
R. van Weelderen and U. Wagner CERN
Study and Development of Large Cryogenic Systems in China
Cryogenics storage and distribution
HL-LHC IT STRING and Series test of SC link
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Innovative He cycle Francois Millet.
FCC Week 2017, Berlin Towards a conceptual design for FCC cryogenics
SPS cryogenic proximity equipment and SM18 validation
CRYOGENICS – strategy, unavailability root causes and limitations
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
The HL-LHC project, and associated Cryogenics
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
on behalf of FCC cryogenic team
ILC Cryogenic Systems Draft EDR Plan
TEST PLANS for HL LHC IT STRING
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Update on beam screen issues
Summary post TCC#54_02Aug’18
Cryogenic management of the LHC Run 2 dynamic heat loads
Laurent Delprat CERN, Geneva, Switzerland
HL-LHC New MS optimisation WP9, Preliminary cost estimates
Presentation transcript:

The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Cryogenics for HL-LHC Laurent Tavian, Cryogenic Group, Technology Department, CERN With the contribution of K. Brodzinski, G. Ferlin, U. Wagner & R. van Weelderen 3 rd Joint HiLumi, LHC-LARP Annual Meeting November 2013, Daresbury Laboratory

Content Overall HL-LHC cryogenic layout Overall HL-LHC cryogenic layout Beam parameter & heat loads Beam parameter & heat loads HL-LHC and Sector cryoplants HL-LHC and Sector cryoplants Cryogenic layout proposals at: Cryogenic layout proposals at: Points 1, 2, 5 and 7 for cryo-collimators Points 1, 2, 5 and 7 for cryo-collimators Point 7 for SC links Point 7 for SC links Point 4 for RF insertion Point 4 for RF insertion Point 1 and Point 5 for new high-luminosity insertions Point 1 and Point 5 for new high-luminosity insertions Rough estimate of buildings and utilities requirements Rough estimate of buildings and utilities requirements Schedule, organization and conclusion Schedule, organization and conclusion

Overall HL-LHC cryogenic layout HL-LHC cryo-upgrade: HL-LHC cryo-upgrade: 2 new cryoplants at P1 and P5 for high luminosity insertions 2 new cryoplants at P1 and P5 for high luminosity insertions 1 new cryoplant at P4 for SRF cryomodules 1 new cryoplant at P4 for SRF cryomodules New cooling circuits at P7 for SC links and deported current feed boxes New cooling circuits at P7 for SC links and deported current feed boxes Cryogenic design support for cryo- collimators and 11 T dipoles at P1, P3, P5 and P7 Cryogenic design support for cryo- collimators and 11 T dipoles at P1, P3, P5 and P7

Beam parameters (impacting cryo) for HL-LHC ParametersNominalHL-LHC Beam energy, E[TeV]77 Bunch population, Nb[# p / bunch]1.15E+112.2E+11 Number of bunches, nb[-] Luminosity P1 and P5, L[Hz/cm 2 ]1E+345E+34 Bunch length, σ[ns]11 x ~2 x 5

Heat loads To be validated by the Heat Load Working Group!

Sector cryoplants With successful dipole scrubbing (e-cloud only in quadrupoles) With e-cloud in dipoles and quadrupoles  The main concerns (showstopper!) Cold masses Current leads Thermal shields Beam screens

Cryo-collimators at Pt1, Pt2, Pt5 and Pt7 Cryogenics design support : Main cryogenics constraints: Continuity of the cell cooling (bayonet HX, free section of pressurized HeII), hydraulic impedance for cool-down, warm-up and quench discharge… Good progress in collaboration with WP5 and WP11

New SC links at P7 Cryogenics design support: Optimisation of the SC link cooling taking into account fixed boundary conditions imposed by the existing cryogenic distribution scheme (QRL headers P, T…) In progress in collaboration with WP6

Upgrade of the RF insertion Cryogenics design support for: New 800 MHz (200 MHz?) cavity module New electron lenses Just started in collaboration with WP4 and WP5

New cryogenic infrastructure at P4 -1 warm compressor station (WCS) in noise insulated surface building -1 lower cold box (LCB) in UX45 cavern -1 valve box in UX45 cavern -2 main cryogenic distribution lines -2 interconnection lines with existing QRL service modules QRL

P4 cryogenic process & flow diagram New refrigerator cold box UX45

Size of new RF cryoplant (provisional) Temperature levelStaticDynamicInstalled Equivalent installed 4.5 K [kW] 4.5 K[W] K[W] Uncertainty coefficient, fu: 1.25 for existing component (400 MHz RF module) 1.5 for new equipment Overcapacity coefficient, fo: 1.5 (Qsta*fu + Qdyn)*fo To be validated by the Heat Load Working Group!

Upgrade of the P1 & P5 insertions Cryogenics design support for new cryo-assemblies (CC, IT & MS cryomagnets, DFBs, SC links…) In progress in collaboration with WP3 and WP4 Well advanced for magnet cooling Under investigation for CC and BS cooling 2 modules of 4 cavities Arc current feed boxes remain in the tunnel

New cryogenic infrastructure at P1 and P5 -1 warm compressor station (WCS) in noise insulated surface building -1 upper cold box (UCB) in surface building -1 cold quench buffer (QV) in surface -1 or 2 cold compressor boxes (CCB) in underground cavern -2 main cryogenic distribution lines -2 interconnection valve boxes with existing QRL Critical integration issue

Size of new IT cryoplants (provisional) Temperature levelStaticDynamicInstalled Equivalent installed 4.5 K [kW] 1.9 K[W] K[W] K[W] K[W] K[g/s] Uncertainty coefficient, fu: 1.5 Overcapacity coefficient, fo: 1.5 (Qsta*fu + Qdyn)*fo To be validated by the Heat Load Working Group! What about possible redundancy with detector cryogenic plants? (~ K for CMS) (~3 4.5 K for ATLAS) Current lead cooling “à la LHC” to be reviewed with WP6 !

Number of cold compressor trains LHC sector Present HL-LHC

Minimum CCB requirement in cavern Depending of the total cooling capacity and operating temperature Single CC trainDouble CC train Best for cavern integration Global or distributed ? (500 W max size for distributed HX !) 500 W HX 2.2 K, 1.3 bar 1.8 K, 16 mbar 4.6 K, 3 bar 20 K, 1.3 bar 50 K, 20 bar 75 K, 19 bar

Building and general service requirements Cryogenic systemP1 and P5P4 Warm compressor building Surface[m2] Crane[t]20 Electrical power[MW] Cooling water[m3/h] Compressed air[Nm3/h]3020 Ventilation[kW] Type[-]Noise-insulated (~108 dB_A) Surface "SD" building Surface[mxm]30x10N/A Height[m]12N/A Crane[t]5N/A Electrical power[kW]50N/A Cooling water[m3/h]15N/A Compressed air[Nm3/h]90N/A Cavern Volume[m3] Local handling[t]22 Electrical power[kW]10020 Cooling water[m3/h]20 Compressed air[Nm3/h]4030 Provisional! (+ access areas)

Schedule : Freeze of heat load requirement P7 P1&P5

WP9-Cryogenics organization chart

Conclusion Main contributions to other WPs: the cooling studies of cryogenic assemblies have started: Main contributions to other WPs: the cooling studies of cryogenic assemblies have started: Cooling studies of new magnet cold masses are well advanced Cooling studies of new magnet cold masses are well advanced Cooling studies of inner triplet beam screens have started an are challenging (12-22 W/m!) Cooling studies of inner triplet beam screens have started an are challenging (12-22 W/m!) Cooling studies for crab-cavities, cold powering and cryo- collimators follow the development. Cooling studies for crab-cavities, cold powering and cryo- collimators follow the development. Test stations for SC link operational, for CC under commissioning Test stations for SC link operational, for CC under commissioning Corresponding cryogenic infrastructure are under definition Corresponding cryogenic infrastructure are under definition The integration of cavern equipment (cold-compressor box(es)) at P1 and P5 remains a concern. The integration of cavern equipment (cold-compressor box(es)) at P1 and P5 remains a concern. The size of the cryoplants remains compatible with the pre-design data (OK with CtC) if the scrubbing of the beam screens is effective (at least for dipole magnets). The size of the cryoplants remains compatible with the pre-design data (OK with CtC) if the scrubbing of the beam screens is effective (at least for dipole magnets).