The Art of QBS Qualifications-Based Selection (QBS): Procuring Intellectual Services the Smart Way Claude Paul Boivin, ACEC Canada Title #1.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships HMFA Lone Star Chapter 2009 Winter Institute Dallas, TX Christopher.
Organization of Primary Entities
MASBO February Information to purchase Services Information to purchase Construction.
ENGINEERING The Future of Our World FIDIC Resources.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Governor’s Center for Efficient Government. Mission The mission of the Governor's Center for Efficient Government is to promote fair and transparent best.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
Infrastructure: Investing in prosperity John Gamble, CET, P.Eng. FMI/CC Ottawa, ON January 22, 2015.
1 Last update: February 12, 2009 Is Your Selection Process Attracting the Right Consultants? Best Practices, Benefits and Insights to Using a Qualifications.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Procurement of Consultancy Services. 2 Differences between.
Marcy Mealy Procurement Specialist CDBG Program
QBS Colorado QBS Colorado QBS Colorado is an organization comprised of the Colorado chapters of AIA, ACEC, NSPE, and others; to be.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
DESIGN PART 1 SELECTING THE DESIGNER AGREEMENT FOR PROFESSIONAL SERVICES.
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALS CEM-512 Value Engineering Think Value Engineering Prakash Acharya Charles Pfrommer Charles Zirbel JOURNAL.
Conclusion Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
The Analyst as a Project Manager
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
I ntroduction Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Emerging Trends in Job Market. Emerging trends in the job market  The world of work is changing in myriads of ways and at rapid and intense speed  Technology.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Qualification Based Selection. Qualifications Based Selection – Basing selection of design professionals on their qualifications first and foremost through.
The Importance of the Qualifications Based Selection (QBS) Process
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
P ROJECT D ELIVERY M ETHODS. EFCA … is the sole association representing the engineering consultancy and related services industry in Europe represents.
The Best Practice: Selecting a Professional Consultant Canadian Public Procurement Forum October 6, 2010 FIDIC Resources.
Systems Analysis – ITEC 3155 Feasibility Analysis
Best Value for Clients Presented to the Canadian Public Procurement Forum by Glenn Martin, Executive Director Consulting Engineers of BC November 4, 2009.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
“Not everything that counts can be counted; and not everything that can be counted counts.” - Albert Einstein, Famous Genius.
Solving Challenges Others Cannot Virginia’s Public Private Partnership Law Toyo University Tokyo, Japan Christopher D. Lloyd September 29, 2008.
“EVERYBODY WINS”.  Exclusively prescribes the use of a qualifications based selection process for awarding contracts  Prohibits the competitive consideration.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
SA Association of Consulting Engineers QBS vs Price Tendering.
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
Tallahassee Area Chapter of NIGP September 14, 2006 DMS Office of Efficient Government.
O BS Colorado 800 Grant Street, Suite 100 Denver, Colorado Telephone Fax Q ualifications.
LEAGUE OF CITIES & COUNTY GROUPS ProcureAZ The State of Arizona’s eProcurement & Sourcing Solution For Public Entities Statewide 1.
Presentation to MMCD/MED AGM 25 November 2011 Canadian Internal Free Trade Agreements The Unintended Consequences for Consulting Engineers 1 By Chris Newcomb.
Quality Based Selection The Best Practice for Selecting Professional Consultants [DATE]
Solving Challenges Others Cannot Using Public Private Partnerships Parkland Blue Ribbon Panel Christopher D. Lloyd October 22, 2007.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
Project Procurement Management
The Best Practice: Selecting a Professional Consultant Presented by John Gamble, P.Eng. President & CEO, ACEC-Canada.
QBS Colorado FALL FORUM 2011 Daniel W. Akin, P.E. – P.L.S. Chairman QBS Colorado October 4, 2011.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Office of Major Project Development (OMPD) Overview November 2015.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
BIMILACI 2007 Best Practice Procurement of Engineering Services Washington, D.C. May , 2007 Gregs Thomopulos, P.E., FACEC Executive Committee Member,
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Integrity Innovation Accountability Commitment to Excellence Teamwork Values Item 8C Ord. No. 889-A; Amending the Fiscal Year Annual Budget
QUALIFICATIONS-BASED SELECTION
ACEC INDIANA Environmental Business & Funding Source Conference
Systems Analysis and Design in a Changing World, 4th Edition
Ch 11 - Procurement Management Learning Objectives
Developing and Issuing the RFP
Infrastructure Cost Mitigation
The Best Decision by Design: Professional Services Selection
Architectural Services RFQ
PROJECT DELIVERY METHODS
ON TRACK KEEPING YOUR BUDGETS
Presentation transcript:

The Art of QBS Qualifications-Based Selection (QBS): Procuring Intellectual Services the Smart Way Claude Paul Boivin, ACEC Canada Title #1

When Hiring An Engineer, Choose Quality and Avoid Fall Economies Title #2

Title #3 The High Cost of Cheap Design

We Have Met The Enemy And He Is Us Pogo, 1972 Title #4

Generic Mission Statement “We exist to make our member firms more successful!

What guarantees success? Client gets quality Client gets value Client gets a product designed to last How to guarantee success? Client selects the right design team –Qualified Engineers

Choosing the Right People is an Art Intellectual services, such as engineering expertise, cannot be procured in the same way as commodities like pencils and paper.

Would you choose your heart surgeon based on the lowest price?

You would not hire an employee based on the lowest salary proposed, would you?

Then why allow engineers to be selected on price, especially with People’s health and safety often at stake?

Why are these facilities so successful? Well-designed Well-built Well-maintained

Qualifications-Based Selection (QBS) Means… Accountability Transparency Effective use of public funds QBS for Public Procurement Means… Quality Value Savings

Select a Firm Based On… Proven performance Technical excellence Proposed approach Personnel and resources Applicable knowledge or experience Understanding of client’s needs The right team for the right project

Good Design Means Savings

QBS Means Quality Selection focuses on client’s needs Quality

Enemies of our Industry and Profession Low price bidding Reverse auctions

Benefits of (QBS) A) Results in appropriate and wise investment at design stage which: Fosters creativity Selects best design team and most appropriate technology Provides long-term value by reducing construction and life-cycle maintenance costs B) Places emphasis on the client’s objectives and expectations of quality, well adapted to current conditions and future trends. C) Provides a transparent selection system that focuses on competence, creativity and proven performance. DANGERS of low-bid selection A) Results in low investment at design stage which: Discourages innovation and evaluation of alternative approaches Results in use of less experienced personnel and fewer resources devoted to the project Leads to missed opportunities for savings in construction and life- cycle maintenance costs B) Places emphasis on acceptable standards instead of expected quality C) Selection focuses on lowest possible effort and lowest call on intellectual, conceptual and design resources.

The High Cost of Cheap Design Low use of available resources Lost opportunity for innovation Long-term higher cost Low value Low Price Means…

QBS Process 1.List qualified consultants 2.Request proposals 3.Select firm 4.Confirm scope 5.Negotiate fee based on confirmed scope

Did You Say “Negotiate the Fee”? Best case scenario for both parties –Expected services performed within client budget –Fair and reasonable fee

Who Supports QBS? FIDIC – QBS is the optimal way to select a consultant United States government - QBS is the law (Brooks Act) The Canadian Council of Professional Engineers (CCPE), which defends the public interest

Top Ten Reasons for QBS 1.High Quality 2.The Experts you Need 3.Savings 4.Sound Public Policy 5.More Cost Certainty 6.Transparency 7.Fees Correlate to Services 8.Competitive Merit Based Process 9.Better Scope Definition 10.Opportunities for Innovation

What Can You Do?