United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Advertisements

DESIGN LAYOUT OF DISTRIBUTION SYSTEMS
Overview History of the PDWG Three Steps to Renewable Water –Efficient Use –Sustainable Use –Reliable Use Conclusions.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Stonegate Village Metropolitan District (“SVMD”) Community Meeting Options Going Forward July 27, 2011.
Regional Partnerships for a Sustainable Water Future Britta Strother Water Resource Specialist July 22, 2010.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
Hydraulic Optimization of the Northern Water Supply System Presentation by: Tom Charles, P.E., DEE Jim Kriss, P.E. Jennifer Wendrowski, E.I.T. September.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
CE HYDRAULICS ENGINEERING
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
Jordan Lake Partnership Western Intake Feasibility Study Jordan Lake Partnership Western Intake Feasibility Study 1.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 Recycled Water Program for the City of Los Angeles.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Lecture 1 Water Distribution Systems
Water System Planning Study
Environmental Federation of Oklahoma The City of Oklahoma City Utilities Department October 2, 2008.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Safe Drinking Water Permit and Capacity Requirements Developer Services Summit November 16, 2010 Engineering - Asset Planning Vince Monaco.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
Santa Cruz AMA Virtual Tour Santa Cruz AMA Virtual Tour September 2000.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Western Water Issues: The Challenges of Growth NARUC Water Committee Summer Meetings July 2008, Portland, Oregon Walton Hill, United Water.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
Rural Water District No. 5 Douglas County Study Session May 17, 2007.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
South Platte Decision Support System Colorado Water Conservation Board and Division of Water Resources.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Kern County Water Agency – Know & Tell Josh, Jason, & Juy.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15.
1. 2 Required under water right Establishes limit on LCRA firm water contract sales from lakes Industry standard for evaluating available water supply.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
Broomfield Comprehensive Plan 2016 Update Utility Work Group Report Utility Work Group: − Bob Pearson, Coordinator − Beth Willman, Recorder − Hal Lunka.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Folsom Water Supply Service Area for Aerojet Properties ( Aerojet-Industrial, Westborough & Easton Place/Glenborough Areas) June 26, 2007.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
City of Buda ElectroPurification Water Supply Evaluation Drew Hardin, PE Council Workshop - January 20, 2015.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Richland Creek Water Supply Program Briefing
Kings Bluff Raw Water System Parallel Raw Water Main Project
Recycled Water Project – Sharon Heights GCC
Southern Delivery System
Department of Environmental Quality Division of Water Resources
Projects and Management Actions
Withlacoochee Regional Water Supply Authority
Future Water Supply Evaluation
October 29, 2018 Terry Lauritsen, P.E.
City of Sunrise Wastewater Reuse Program
Antelope Valley-East Kern Water Agency
Mutually Beneficial Partnerships in Groundwater Banking Paul Weghorst Irvine Ranch Water District August 15, 2019.
Presentation transcript:

United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1

United Water & Sanitation District 2

Formation In 2003, the United Water and Sanitation District was formed to provide water resources and infrastructure to cities, counties, special districts, canal companies, agricultural users and others. Its service plan authorizes a state-wide service area. The District’s goal is to facilitate the acquisition, diversion, storage, carriage delivery, treatment, transmission, distribution and provision of water to those who voluntarily choose to use the system. 3

4

South Metro Partners United has a proven track record of working with South Metro water providers to bring water to their customers ECCV Northern Project 6,000 AFY of renewable supplies acquired from United Water United acquires, transfers, diverts, stores, and delivers supplies to ECCV water treatment facilities ACWWA Flow Project 4,400 AFY of renewable supplies acquired from United United acquires, transfers, diverts, stores, and delivers supplies to ECCV water treatment facilities In cooperation with ECCV and ACWWA, United is already delivering treated renewable water to the South Metro area 5

South Metro Partners 6

United’s Services Provide a phased approach to water supply development Upfront water rights acquisition and joint adjudication of shares to meet renewable demands Provide access to: Existing United raw water diversion, storage, alluvial pretreatment and conveyance facilities Construct additional facilities as necessary Provide a phased approach to financing using new tap fees/growth Assist in developing a water operations model to evaluate alternatives 7

United – Stonegate Village Joint Water Supply Opportunities 8

Stonegate Water Supply Evaluation Overview Up to 1,844 AFY Renewable Water Supply Goal SVMD currently has.7 MGD firm capacity in ECCV Northern Line Buildout peak day demand of 5.76 MGD Surplus SVMD effluent will be stored in Rueter-Hess and withdrawn for non-potable demands 9

Agricultural water rights acquisition, joint adjudication United provides a robust and cost effective raw water delivery system 1) Utilizes South Platte exchange potential 2) Delivery from South Platte via 70 Ranch Well Field Obtain firm capacity in ECCV water treatment plant Obtain existing capacity + additional peak/non-peak capacity in ECCV Northern Pipeline Peak/non-peak capacity in ECCV north and south booster pump stations Construction of proposed pipeline from ECCV storage tanks to SVMD storage tanks Stonegate Water Supply Evaluation Project Components 10

Water Rights Acquisition 11

Water Rights Acquisition Fully renewable senior surface water rights Acquisition by United in a manner similar to that used for ECCV and ACWWA Owned by SVMD Pre-Approval of water rights by SVMD prior to United acquisition Assured dry-year yield as a % of average yield minimizes storage needs Joint water court transfer Diversified water rights portfolio 12

13

Geographic Distribution of Ditch Systems Used by United Average 14

Annual Profile – Individual Water Right 15

Annual Profile – Individual Water Right 16

Annual Profile – Individual Water Right 17

18

The United Delivery System to Provide Renewable Water to Stonegate 19

1) United Delivery System to ECCV’s Treatment Plant United utilizes exchange potential on the South Platte River Divert supplies at United Diversion No. 3 Storage at United Reservoir No. 3 Delivery to Barr Lake via 36” Beebe Pipeline Pre-Treatment in Beebe Draw Alluvium Withdraw supplies at United Well Field Delivery to ECCV Treatment Plant 20

Divert supplies at United Diversion No. 3 21

Storage at United Reservoir No. 3 22

Delivery to Barr Lake via 36” Beebe Pipeline 23

Pre-Treatment in Beebe Draw Alluvium 24

Withdraw Supplies at United Well Field 25

Raw Water is Treated at ECCV’s Treatment Plant 26

2) United Delivery System to ECCV’s Treatment Plant United will deliver supplies through its northern infrastructure Divert Supplies at 70 Ranch Well Field Storage and alluvial treatment in 70 Ranch Recharge Ponds Delivery to ECCV Treatment Plant via 70 Ranch Pipeline 27

Delivery to ECCV Water Treatment Plant via 70 Ranch Pipeline 28

Raw Water is Treated at ECCV’s Treatment Plant 29

Delivery to ECCV Storage Tanks via ECCV Northern Pipeline 30

Terminus of ECCV Northern Pipeline 31

Proposed Delivery Pipeline from ECCV Storage Tanks to SVMD Storage Tanks 32

Stonegate Village Water Supply Components and Unit Costs ComponentCapacity AcquiredUnits Unit Cost Description Water RightsUp to 1,844Acre-feet $ 23,850 Water Rights include all infrastructure to deliver to ECCV Northern WTP Firm Capacity in ECCV Water Treatment Plant 0.7 to 5.74 MGDMGD $ 4 (M) Firm Capacity in ECCV Water Treatment Plant including Brine Minimization and Deep Well Disposal Existing Owned Firm Capacity in ECCV Northern Pipeline 0.7MGD$ 0.00 Additional Firm Capacity in ECCV Northern Pipeline (additional capacity) Up to 5.04 MGDMGD $ 1.8 (M) Firm Capacity in ECCV Northern Pipeline (additional capacity) Additional Variable Capacity in ECCV Northern Pipeline Varies depending upon firm capacity acquired MGD $ 0.9 (M) Firm Capacity in ECCV North and South Booster Pump Stations 0.7 to 5.74 MGD MGD $ 1.8 (M) Firm Capacity in ECCV North and South Booster Pump Stations Variable Capacity in ECCV North and South Booster Pump Stations Varies depending upon firm capacity acquired MGD $ 0.9 (M) Construction of Pipeline from ECCV storage tanks to SVMD storage tank 5MGD $ 1.4 (M) Construction cost for 16” pipeline from ECCV Smoky Hill tanks to Stonegate Village Metro District tanks (includes design, easement acquisition, and pump stations) 33

United’s Advantages SVMD owns and controls a diversified portfolio of renewable water rights United has a proven track record Utilizes existing diversion, conveyance, storage, and treatment facilities and proven inter-governmental agreements Scalable water delivery system Financed by new taps and growth 34