Graduate Program in Business Information Systems BIS 581 Business Process Management Lecture-2 Aslı Sencer Department of Management Information Systems.

Slides:



Advertisements
Similar presentations
Understanding Food Safety Management Systems
Advertisements

A Process Definition Tool
Graduate Program in Business Information Systems BIS 581 Business Process Management Lecture-1 Aslı Sencer Department of Management Information Systems.
Hydrological information systems Svein Taksdal Head of section, Section for Hydroinformatics Hydrology department Norwegian Water Resources and Energy.
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Value Stream Mapping A Laboratory Tool Laurie Peterson-Wright Colorado Department of Public Health and Environment Laboratory Services Division.
IE673Session 5 - Process Management1 Process Management.
And Learning TEAL Consulting Limited a a Meeting Customer Demand in Challenging Times July 2010.
SRC/OAS Project Environmental Performance Presenter: Julia Louise Brown.
Environmental Management System (EMS) as the Foundation for Sustainability Based on ISO Standard.
© 2005 by Prentice Hall Chapter 5 Maintaining Information Systems Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Chapter 8: Quality Management Project Quality Management
Personnel Basic Principles of GMP Workshop on
Graduate Program in Business Information Systems BIS 581 Business Process Management Lecture-3 Aslı Sencer Department of Management Information Systems.
Key Performance Indicators
Huzairy Hassan School of Bioprocess Engineering UniMAP.
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
DIFSC 2011 Increasing Managerial Responsibility to Ensure Food Safety: The Concept of A Trained Person in Charge Asia Al Raeesi Acting Head of Food Studies.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Graduate Program in Business Information Systems
Seevic Performance Appraisal
Introduction to ISO New and modified requirements.
1 Rev: 02/12/2007 MSE-415: B. Hawrylo MSE-415: Product Design Lecture #3 Chapter 4 Identifying Customer Needs.
Production and Management Prepared by Bhakti Joshi June 18, 2014.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
The Management Process Today
Value Analysis/ Flow Analysis
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
BIS 360 – Lecture Five Ch. 7: Determining System Requirements.
Software Project Management Lecture # 7. Outline Project Scheduling.
Lecture3 : Change Control Lecturer: Kawther Abas 447CS – Management of Programming Projects.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 4: Process Analysis Objectives: Introduce some practical.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
WEEK 2: MANAGEMENT AND MANAGERS BUSN 107 – Özge Can.
Basic Principles of GMP
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System 4. Managing Scope 5.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Version 10.0  The High Performance Organisation Ltd Creating A Process Based Management System 1 Welcome Creating a Process Based Management.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Requirements Engineering Requirements Validation and Management Lecture-24.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
CS523 Database Design Instructor : Somchai Thangsathityangkul You can download lecture note at Class Presence 10% Quiz 10%
Mahindra Satyam Confidential Quality Management System Software Defect Prevention.
Key Performance Indicators will: Provide performance measurements for all core processes. Add value for our customers and the company. Support company.
© 2008 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Welcome to.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Process Auditing Why do people think that this is something new? Presented by Kevin Gilson, Orion Registrar, Inc. For the ASQ ISO Users Group October 8,
Hospital Accreditation Documentation Process & Standard Requirements
PATIENT & FAMILY RIGHTS AT DOHMS. Fully understand and practice all your rights. You will receive a written copy of these rights from the Reception, Registration.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
1-1 BBA 121 Principles of Management. 1-2 Lecture 1 The Management Process Today.
University of Bahrain College of Business Administration Management & Marketing Department Essentials of Contemporary Management Jones/George Chapter One:
Nikolay Begchin, Deputy Director of Budget Methodology Department
So where in ISO is Process?
Chapter 18 Maintaining Information Systems
Benchmarking.
Chapter 8 – Software Testing
McCall’s Quality Factors
Software engineering.
Quality Management Systems – Requirements
مفاهیم بهره وري.
Regional Seminar for OIE National Focal Points on Animal Production Food Safety Importance of collaboration between the Veterinary Services and industry.
The Management Process Today
Process Auditing Why do people think that this is something new?
Lecture # 7 System Requirements
Chapter 7 Software Testing.
RECEIVE AND STORE KITCHEN SUPPLIES AND FOOD STOCK
Presentation transcript:

Graduate Program in Business Information Systems BIS 581 Business Process Management Lecture-2 Aslı Sencer Department of Management Information Systems 1

Business Process Management- 2 Key Performance Indicators Process Identification 2

Key Performance Indicators - KPI Performance measures called key performance indicators (KPI) are developed to evaluate the processes from different aspects. BPM requires that the performance of the processes should be continually observed with respect to these KPI’s and documented periodically. In the next step, current performances are compared with the target values that have been generated for these KPI’s. Modifications are made in the process flow to improve the performance. You can not control without measuring! 3

Classification of KPI’s: Effectiveness, Efficiency, Flexibility Effectiveness:  Measures the degree to which an output fulfills the customer needs and requirements.  Measures if the right output is provided at the right time, place and price.  Can the process provide what is intended initially?  Can we produce more with the same input by decreasing defectives? Topics for EffectivenessMeasuring Criteria Order fulfillmentAmount delivered/amount ordered Being on timeOn time delivery rate Customer complaintsNumber of customer complaints Defect rateRatio of defectives Acting as plannedActual/planned Response timeResponse duration Service LevelRatio of satisfied customer 4

Classification of KPI’s: Effectiveness, Efficiency, Flexibility Efficiency:  Measures how much resource are used to obtain a given output? Resources are manpower, energy, machinery, raw material, capital and knowhow.  Measuring efficiency is more difficult than measuring effectiveness.  Aim is to decrease the amount of resource used to produce the same output.  Can we decrease the used resources by eliminating the non value adding activities? Topics for EfficiencyMeasuring Criteria DurationProcess time for a unit production CostUnit production cost Waiting timeWaiting time between processes Production rateProduction rate per unit time 5

Classification of KPI’s: Effectiveness, Efficiency, Flexibility Flexibility:  Measures the adaptability of the processes to the changing environmental conditions like special customer needs, new rules, regulations, emergency cases, etc.  A flexible process can be performed in a different way in special cases.  Flexibility is the most difficult performance to measure. Topics for FlexibilityMeasurement Criteria Special Customer RequirementsNumber of special custmer requirements Duration of special customer requestProcess duration for special customer/standard customer Rejections of special requestNumber of rejected special requests/all requests Extra resource requirementExtra resources required for a special request Extra processes requiredNumber of activities required for a special request 6

Process Identification Form Code: A standard code Name: Standard name of the process in the organization Aim: The aim of the process, indicating the type of output to be generated Classification: Process for Internal/external Customers; Basic/managerial/support process Owner: The person who is responsible for the process with sufficient authority Sup processes: Processes that include the current process Sub processes and activities: Limits of the process InputsSupplierOutputsCustomer Resources: Types of inputs that already exist in the system Process Interactions Processes that are affected by the current process Sup processes and the processes that come next Processes that affect the current process Previous processes, sub processes Support and Managerial Processes KPI Aim Increase/Decrease UnitTargetCurrent Gap = Current-Target Current Problems: Problems that have been encountered so far.

Ex: Cross Functional Process Map 8 Handoff A Product Quality Test Process in a Fast Food Restaurant

Example: Process Identification Form Code: Name: Aim: Classification: Owner: Sup Processes: Sub Processes and Activities: 9 M101 Product Quality Test Process in a Fast Food Restaurant Periodically checking if the quality of the food prepared in the fast food restaurants conforms the quality standards. Managerial process for internal customers General Product Quality Test Process in a Fast Food Restaurant This process includes: 1)Checking the hygiene of the kitchen and service area 2)Product quality test process 3)Implementation of the test results Take samples: Choose a sample  Put into an hygienic bag  Put into a cooler Take to laboratory: Put into the car  Take to the lab Analyze: Obtain the chemicals  Apply test Prepare a fine document Prepare an appropriate condition document Istanbul Municipality Department of Public Health

Example: Process Identification Form (cont’d.) Limits InputSupplier OutputCustomer Resources: Processes that are affected by the current process Processes that affect the current process Support Processes: Maintenance and cleaning of the laboratory, replenishment of stocks like lab chermicals Managerial processes: Defining target number of visits to be made per day KPIAimUnitTargetCurrentGap Current Problems: 10 Sample foodTest team member Pass/fail document approved by the test team Istanbul Municipality Test team member, Lab. Analyst, Lab. chemicals, Hygienic bag, Cooler, Lab materials Implementation of the test results General product quality testing process Checking the hygiene of the kitchen and service area Take samples Take to laboratory Analyze Prepare a fine document Prepare an appropriate condition document #Visits / day Cost/visit # visits in an epidemic Increase Decrease Increase Visits/day TL/visit Visits/day = 2 (to be improved) 25-20=5 (to be improved) 20-30= -10 (to be improved) It takes long time to go the lab. (traffic problem exists, might think of portable analysis tools) Long waiting time for the analyst (might think of increasing the staff size, check the support process for maintaining the chemicals)

Gap Analysis Gap=Current-Target Measure to be decreased Gap > 0 Measure to be increased Measure to be decreased Gap < 0 Measure to be increased Improvement needed 11 Improvement needed

Group Exercise 2: Process Identification 1) Complete the process identification form for the registration process. 12