Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager.

Slides:



Advertisements
Similar presentations
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Advertisements

Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 4 june 2010.
1 Brussels workshop: 26 and 27 February 2009 Conclusions and minutes Workshop 26 – 27 February 2009 GRI NW Investment I1- Virtual Test/Business Simulation.
Energiekamer RCC Meeting 28 August 2008 The Hague Maya van der Steenhoven & Kristien van de Laar PROGRAMME OFFICE - GRI NW.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
GRI NW Investment - From virtual to measurable support Update on project Common effort on making regional investment happen Hague 5 July 2010.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
9th RCC Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008, Prague, Czech Republic.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
1 Conclusions Stockholm workshop GRI NW Investment I1- Virtual Test/Business Simulation (“recorded and agreed at the workshop”)
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Working on investment climate in the NW-region Update By projectleader Investment I1 GRI North-West Investment workstream
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
1 Day Ahead Auctions Making progress, Jour Fixe Day Ahead Auctions pilot 14 th of September 2007 Jour Fixe The Hague Conclusions and homework Chair DTe.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Regional Initiative Progress and Next Steps Graeme Steele.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin.
Investment workstream 22 January 2009 Cross-border gas transmission‏ Investment project (I1) Update to RCC at account of project leader Erik Rakhou Project.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Transfer of Technology Consultative Process Wanna Tanunchaiwatana Manager, Technology Climate Change Secretariat (UNFCCC) Asia and the Pacific Regional.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Investment workstream 08 June 2009 Cross-border gas transmission‏ Investment project (I1) Update for Joint GRI NW Meeting Where are we heading since last.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
1 GRI NW Investment project in progress Cross-border gas transmission‏ Update on Investment project I1 GRI NW Focus at Virtual Test (Business Simulation)
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.
Marie-Claire AOUN CRE
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
GRI NW TRANSPARENCY PROJECT
Gas Regional Investment Plan project
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
DRAFT DG TREN Staff Working Paper on LNG
Work plan of GRI NW for 2011 Three out of four projects are started
Presentation transcript:

Investment workstream 20 October 2008 Investment project (I1)‏ Update on Consultation Presentation at account and by project manager

2 Investment workstream, GRI NW Agenda update 1. Outcome of consultation Response rate 2. Quick scan content response First results 3.Way forward? Process

3 Investment workstream, GRI NW 1. Outcome of consultation (1) Response sufficient? Response rate of 15 was OK to ERGEG standards (10 – 26 on average)  13 online responses - 1 with confidential elements  2 official paper submissions (key Operator Group, German operators commonly)  Some informal s (disregarded at this stage) Does it represent region? To a large extent.  All type of players covered - Larger industry (like IFIEC), banks/traders/hedgefunds are little represented. - No governmental response.  All involved countries covered to a large extent - NU with activities in France, Ireland, Northern Ireland and Belgium could be better represented.  Sufficiently large response - Especially running and future projects well covered (see gasinvestment.org) Proposal is to extend till end of this week to allow for 3 to 5 more responses.

4 Investment workstream, GRI NW 2. Outcome of consultation (2)….switch to Excel…. Is there need of encouraging investment climate? Is there basis for solutions? Y/Y!

5 Investment workstream, GRI NW 3. Way forward RCC: update on consultation (today) PB: report on progress Workshop RCC-members 6/7 11 Madrid forum: potentially 1 slide as part of GRI on process Governmental representatives mtg (TSO, 1 nov, via Open Seasons project)‏ SG including workshop Investment Project managers conference call January ‘09: Next AG meeting: virtual test case (? to TSO to work with EFET to prepare, question pending ?)

6 Investment workstream, GRI NW Back-up slides

7 Investment workstream, GRI NW What shall be projects outcome by end of ‘09? ‏(2) In a co-operation I2. Agreed framework for a sound (regional) investment climate  By means of a thorough confirmation via market consultation - Using common principles developed by NW-EU TSOs  Leading to a side-letter to MoU between Regulators and any additionally, based on consultation outcome, required measures (e.g. testing in pilot projects)‏ Mechanism(s) for incentives for TSO’s, encouraging regulated investment  By means of a report on incentives - Including addressing question of alternatives (next) to user commitments as basis for investment  Leading, if required, to advise of GRI NW on adjustment of regulatory framework by either governments and/or regulators Encourage(d)‏ Sound Regional Investment Climate By end of 2009

8 Investment workstream, GRI NW What shall be projects outcome by end of ’09? (1) In a co-operation I2. Quote Roadmap from “9 building blocks of our successful regional market by 2012”: “The investment climate should be such that investments in capacity… are sufficient and timely and persistent physical congestion is avoided. Investments should facilitate gas supplies from diverse sources to meet the need for secure gas supplies” See point III, p. 10 Encourage(d)‏ Sound Regional Investment Climate By end of 2009

9 Investment workstream, GRI NW What happened so far?‏ (1)‏ Investment project (I1) started as of 10 June 2008 and is now gathering momentum on way to SG workshop of in London.  During June and July in co-operation with I2-stream workshop for RCC and Operators on was prepared and held (re: 'principles for sound investment climate', proposal by TSOs). - A sub-product of has been identification of a legal mismatch, which could be addressed with governmental representatives on (Thank you to Operators team): - “Legalisation for TSO x-border co-operation in open seasons”  Subsequently on the consultation was launched on sound regional investment climate in general and TSO principles encouraging such climate in particular (due today!)‏  In parallel study on incentives was launched and is in progress.  By meeting of Advisory Group was formed via public webcall (TSO’s, Market, Academic, Bank). Current primary focus of Advisory Group has been work on incentives. Advise in general arising issues shall be used as well.

10 Investment workstream, GRI NW What happened so far? (2) Personal lesson learned from consultation paper process: Building required by project trust requires detailed mutual understanding, certain “vulnerability” and time to agree to (dis)agree. Feasible

11 Investment workstream, GRI NW Work timing and milestones Investment (I1) visualised June 08July 08August 08Sep.08Oct. 08Nov. 08Dec. 08q1-q Ok- plan Preconsult with RCC and sign MOU: general issues (step 1)‏ Develop with I2, and AG, present and verify test case(s)‏ for application of MOU and/or Incentives Online consultation & conclusions, in form of draft MOU, based on draft principles of I2 q3 -q409 Report to PB, RCC Final report to PB, RCC Investment framework Incentives MOU (addendum 1)‏ Preconsult with RCC and sign MOU: 'left' issues (st.2)‏ MOU (addendum 1b, if relevant)‏ Concerns co-ordinated approach to 'OK” for” decisions on 'regional dimension' investment Control Workshop SG incl. workshop Test cases live test report(s) incl. legal bottlenecks (if any, filed with gov. and Comm.)‏ Draft letter by RCC (to SG and) Gov. forum with (incentives) recommendations “FYI” and law change (if relevant)‏ Letter Gov. forum Concerns incentives for TSOs to invest in extra capacity (of regional dimension; with and without contract)‏ Draft with AG regional recommendations on incentives and discuss at SG; advise on input for MOU Draft study on (best practice) incentives in NW-EU; tested with advisory group (AG)‏ Consult recommendations with TSO forum; afterwards apply incentives in test cases 1. Planning visualised (3)‏