Superconducting Magnet R&D for COMET Makoto Yoshida (KEK) NuFact11 1-6 Aug, 2011.

Slides:



Advertisements
Similar presentations
Investigation of Proton Irradiation-Induced Creep of Ultrafine Grain Graphite Anne A. Campbell & Gary S. Was University of Michigan Research Supported.
Advertisements

Neutron Irradiation Measurement for Superconducting Magnet Materials at Low Temperature Tatsushi NAKAMOTO KEK.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Superconducting Solenoids for COMET KEK Cryogenics Center, Osaka Univ. Kuno-san’s Team, J-PARC MLF Muon Group.
The JPARC Neutrino Target
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
Muons, Inc. AAC Feb. 4, 2009 V. Kashikhin 1 Fermilab AAC  V. Kashikhin for Superconducting Magnet Team Superconducting Helical Solenoids.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
1. Overview of the mu2e magnet system 2. Collaboration mu2e-COMET R. Ostojic Based on presentation of M. Lamm in ASC2010. All credit goes to the members.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Radiation damage effects on RRR WAMSDO 2013, 15./16.1., CERN René Flükiger CERN WAMSDO 2013, 15./ , CERN1.
KT McDonald RESMM’12 (FNAL) Feb 13, Radiation-Damage Considerations for the High-Power-Target System of a Muon Collider or Neutrino Factory K. McDonald.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Status of CEPC Detector magnet
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
Mu2e Magnet Design Changes Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. March 26, 2012 All Experimenters Meeting 1 Contributors.
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
Irradiation of insulators for EuCARD Workshop on Accelerator Magnet, Superconductor, Design and Optimization CERN Maciej Chorowski, Jaroslaw.
February 13, 2012 Mu2e Production Solenoid Design V.V. Kashikhin Workshop on Radiation Effects in Superconducting Magnet Materials (RESMM'12)
K. McDonald Target Studies Meeting Feb 8, Limits for Radiation Damage to and Thermal Loads on Magnet Conductors (Preliminary Survey: Radiation Damage.
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Conceptual Design of COMET and Radiation Hardness Makoto YOSHIDA (KEK) RESMM12 FNAL Feb. 13th, 2012.
Beam line Experiment area SC magnet Pion production target
1 Heat load for a beam loss on the superconducting magnet Yosuke Iwamoto, Toru Ogitsu, Nobuhiro Kimura, Hirokatsu Ohhata, Tatsushi Nakamoto and Akira Yamamoto.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
J-PARC neutrino experiment Target Specification Graphite or Carbon-Carbon composite cylindrical bar : length 900mm, diameter 25~30mm The bar may be divided.
1 Progress Report on Magnet R&D and Further Plans for CERN-KEK Collaboration Tatsushi NAKAMOTO KEK CERN-KEK Committee, 6 th meeting, CERN, Dec. 14, 2011.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
HPT & M/D I WG DISCUSSION SLIDES PASI 2012 Hurh et al.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
1 R&D Plan Proposal for CERN-KEK Collaboration Tatsushi NAKAMOTO KEK CERN-KEK collaboration: Magnet R&D Review at CERN, Dec. 13, 2011.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
SC Magnet Summary Michael Lamm SC Magnets in High Radiation Environment RESMM’12 February 15, 2011.
RESMM Workshops FermilabAD / Accelerator Physics Center Nikolai Mokhov Fermilab RESMM’15 East Lansing, MI May 10-14, 2015.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
BNL solenoid capture workshop: magnet challenges are not trivial Summarized by Tengming Shen
HTS and LTS Magnet Design and Prototyping for RAON
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
Thermal Analysis of the Cold Mass of the 2 T Solenoid for the PANDA Detector at FAIR G. Rolando 1, H. H. J. ten Kate 1, A. Dudarev 1 A. Vodopyanov 2, L.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Radiation Effects on Nb3Sn, copper and inorganic insulation
Hervé Allain, R. van Weelderen (CERN)
Horn and Solenoid Options in Neutrino Factory
EPFL-SPC, 5232 Villigen PSI, Switzerland
Superconducting Helical Solenoids
Radiation Damage to Mu2e Apparatus
Superconducting Magnet Development for me Conversion Experiments
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
The superconducting solenoids for the Super Charm-Tau Factory detector
as a prototype for Super c-tau factory
Review of Quench Limits
Optical fiber based sensors for low temperature and superconductors
Assessment of stability of fully-excited Nb3Sn Rutherford cable with modified ICR at 4.2 K and 12 T using a superconducting transformer and solenoidal.
Presentation transcript:

Superconducting Magnet R&D for COMET Makoto Yoshida (KEK) NuFact Aug, 2011

Issues in Superconducting Magnet R&D Solenoid capture scheme is proposed in Neutrino Factory and intense muon (  - ) source for mu-e conversion experiments, COMET at J-PARC and Mu2e at FNAL. Higher magnetic field is needed for better collection efficiency of pions. Superconducting magnets will provide 5T on the target in COMET/Mu2e, 20T in NF Magnet components are irradiated by severe radiation from the embedded target. Radiation issues should be considered in a magnet design. Investigation of irradiation effects on magnet materials has been initiated in 2010 with reactor neutrons

Searching for muon- electron conversion  J-PARC E21 8GeVx7microA pulse protons from MR Aims at negative muons for protons Superconducting solenoid magnets from end to end;  Pion capture  Muon Transfer  Spectrometer  Detector Pion Capture Solenoid Muon Transport Solenoid Spectrometer Solenoid Detector Solenoid proton beam pion production target radiation shield COMET Superconducting Magnet System

Al-stabilized superconductor NbTi Rutherford cable with aluminum stabilizer  Less nuclear heating than with Cu stabilized cable Doped, cold-worked pure aluminum  Good residual resistance RRR~500 (  0 =0.05n   Good yield strength COMET design value Size: 4.7x15mm Offset yield point of >85MPa >500 Al/Cu/SC: 7.3/0.9/1 14 SC strands: 1.15mm dia.

COMET Magnet Design target station experimental hall proton beam Concrete Cryostat-1 Cryostat-2 Cryostat-3 The magnet system is separated in 3 parts: Cryostat-1: CS+UpstreamTS Cryostat-2: DownstreamTS Cryostat-3: ST+SS+DS Purpose of separation: At concrete wall Different radiation control level Movable Cryostat-2 for install / maintainance Vac. separation window / antip absorber at mid. of TS Beam monitors At stopping target inject electron beam into ST Muon beam monitor LHe Control Dewar Dewar LHe Transfer Tube outside Iron Yoke

Pion Capture Solenoid LHe Transfer from TOP sliding rail pillow seal to connect inner duct guide pin for rad. shield outer vessel connection Warm bore for Rad. Shield supports for Rad. Shield supports 6.2K Load Line of CS,MS 6K 5K 4.2K 7K 45cm thick W Shield

Capture Solenoid of COMET 7.9W2.0W 1.0W 0.7W 0.9W1.4W Neutron flux (n/cm2/proton) Maximum heat deposit   10 mW/kg Maximum dose   0.07 MGy/10 21 p Neutron flux   1x10 21 n/m 2 /10 21 p   fast neutrons 6x10 20 n/m 2 /10 21 p ( >0.1MeV) Neutrons penetrates thick 45cm tungsten shield surrounding the target surrounding the target Neutron fluence for experimental life-time (~10 21 p) approaches a level of ITER magnets (ITER requirement: <10 22 n/m 2 ) approaches a level of ITER magnets (ITER requirement: <10 22 n/m 2 ) What’s the effects on magnet properties? proton beam 8GeVx7microA

Radiation hard magnet material Insulator, resin  BT-resin, Cyanate ester  Polyimide/Glass composite Thermal insulator  Al-coated polyimide film; Less outgas Support structure  GFRP, Titanium rod Superconductor  NbTi, Nb3Sn would be OK up to n/m 2

Problematic components Stabilizer  Aluminum alloy  Copper Thermal conductor  Pure aluminum  Copper  Aluminum alloy Thermo sensor  No experience at n/m 2 Fast-neutron irradiation induces defects in metal. Fast-neutron irradiation induces defects in metal. Defects could be accumulated at Low temperature, Defects could be accumulated at Low temperature, and causes degradation of electrical/thermal conductivity and causes degradation of electrical/thermal conductivity Problems in Problems in  Quench protection, Stability  Cooling 100K 150K COMET CS LHC Project Report 209

Irradiation effects on Al, Cu in literature pure Al (RRR=2000)  Fast neutron 2x10 22 n/m 2 Induces  i =3.8n  m [1]  Perfect recovery by annealing at RT pure Cu   i =1.2n  m [1]  10% damage remains after annealing at RT Recovery after irradiation 2x10 22 n/m 2 (E>0.1MeV) Aluminum [1] J.A. Horak and T.H. Blewitt, J. Nucl. Materials, Vol. 49 (1973) p161 Copper

Indirect Cooling of Capture Solenoid Possible problem with Helium bath cooling of Capture Solenoid, due to Tritium production by 3 He(n,p) 3 H Propose conduction cooling to reduce irradiation of LHe Remove nuclear heating (max. 20W) by pure aluminum strip in between coil layers Thermal conduction can be degraded by neutron irradiation Temperature gradient in coil  0.5mm thick, =4000W/m-K (RRR=2000)   T=0.12K  If irradiation makes =400W/m-K   T=1.2K Taking into account margin for irradiation damage, thick aluminum will be used  2mm, =400W/m-K   T=0.3K COMET ATLAS CS NIMA584, p53 (2008) Heat Load Heat Removal

Irradiation test with reactor neutron Fast neutrons can degrade electrical/thermal conduction of Al, Cu Cold-worked Al-stabilizer and CERNOX sensor was irradiated by reactor neutrons Irradiation and measurement must be performed in low temperature to reproduce magnet operation situation

Low Temperature Irradiation Facility Kyoto Univ. Research Reactor Institute 5 MW max. thermal power Cryostat close to reactor core Sample cool down by He gas loop  10K – 20K Fast neutron flux  >0.1MeV) 1.4x10 15 n/m 2 [2] M. Okada et al., NIM A463 (2001) pp KUR-TR287 (1987) 0.1MeV [2]

reactorCryogenics

Irradiation sample Aluminum stabilizer sample from the superconductor by wire electrical discharge machining in KEK  Keep defects by cold-work Size: 1mmx1mmx70mm Voltage taps with 45mm spacing 4 wire resistance measurement by nano-voltmeter CERNOX CX-1050-SD close to sample temperature (also irradiated) Wire EDM Irradiation sample 5N pure aluminum + Cu, Mg with 10 % cold work 1.35m 3

Result Fast neutron exposure at 12K-15K Resistance was measured in situ. Resistance increased in proportional to neutron fluence in the range of n/m 2  No threshold at low neutron fluence Observed  i = n  m for 2.3x10 20 n/m 2 (>0.1MeV)  Good agreement with pure aluminum results (cf. [1]) In COMET life time, resistivity of stabilizer will increase by a factor of 4 for neutron fluence of 6x10 20 n/m 2  Seasonal warmup would be necessary M. Yoshida et al., ICMC2011

Recovery by annealing at RT Perfect recovery is observed Temperature drift due to CERNOX sensor degradation?

Summary Solenoid capture scheme is employed in NF/MC, mu-e conversion experiments Conceptual design of coil support, cryostat and cryogenics was carried out for COMET Radiation issues are most important for the feasibility  Indirect cooling  Radiation hard organic materials  Irradiation effects on electrical and thermal properties Active R&D on irradiation effect is underway  First tests successfully done in 2010 Nov Feb.  Degradation of electric resistivity of Al-CuMg was observed from ~10 20 n/m 2.  Full recovery by thermal cycle to room temperature was also confirmed.  Will investigate different additives, copper, pure aluminum for thermal conduction.